CALGREEN MANDATORY MEASURE NOTES <br />1. FOR NEW BUILDING 10,000 SQUARE FEET AND OVER, BUILDING COMMISSIONING SHALL BE INCLUDE IN THE <br />DESIGN AND CONSTRUCTION PROCESSES OF THE BUILDING PROJECT TO VERIFY THAT THE BUILDING <br />SYSTEMS AND COMPONENTS MEET THE OWNER'S OR OWNER REPRESENTATIVE'S PROJECT REQUIREMENTS. <br />THE COMMISSIONING REQUIREMENTS SHALL INCLUDE OWNER'S PROJECT REQUIREMENTS (OPR), BASIS OF <br />DESIGN (BOD), COMMISSIONING MEASURES, COMMISSIONING PLAN, FUNCTIONAL PERFORMANCE TESTING, <br />DOCUMENTATION AND TRAINING AND A FINAL COMMISSIONING REPORT. (CALGREEN SECTION 5.410.2) <br />2. PROVIDE TESTING AND ADJUSTING OF SYSTEMS IN ACCORDANCE WITH CALGREEN SECTION 5.410.4. <br />3. THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING CONSTRUCTION IF NECESSARY TO CONDITION <br />THE BUILDING OR AREAS OF ADDITION OR ALTERATION WITHIN THE REQUIRED TEMPERATURE RANGE FOR <br />MATERIAL AND EQUIPMENT INSTALLATION. IF THE HVAC SYSTEM IS USED DURING CONSTRUCTION, USE <br />RETURN AIR FILTERS WITH A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8, BASED ON ASHRAE <br />52.2-1999. REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF THE BUILDING IS OCCUPIED <br />DURING ALTERATION, AT THE CONCLUSION OF CONSTRUCTION. (CALGREEN SECTION 5.504.1) <br />4. AT THE TIME OF ROUGH INSTALLATION, DURING STORAGE ON THE CONSTRUCTION SITE AND UNTIL FINAL <br />STARTUP OF THE HEATING, COOLING CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING, <br />COOLING DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET METAL OR <br />OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF WATER, DUST AND <br />DEBRIS, WHICH MAY ENTER THE SYSTEM. (CALGREEN SECTION 4.501 OR 5.504.3) <br />5. ALL PAINTS, ADHESIVES, SEALANTS AND CAULKS SHALL MEET THE REQUIREMENTS OF CALGREEN SECTION <br />4.504.2 OR 5.504.4. <br />6. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS OF THE BUILDING WITH AIR <br />FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT PROVIDES ATLEAST A MINIMUM EFFICIENCY <br />REPORTING VALUE (MERV) OF 8. MERV 13 SHALL BE INSTALLED PRIOR TO OCCUPANCY, AND <br />RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF THE SAME VALUE SHALL BE INCLUDED IN THE <br />OPERATIONS AND MAINTENANCE MANUAL. (CALGREEN SECTION 5.504.5.3) <br />7. FOR BUILDINGS OR ADDITIONS EQUIPPED WITH DEMAND CONTROL VENTILATION, CO2 SENSORS AND <br />VENTILATION CONTROLS SHALL BE SPECIFIED AND INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF <br />THE CALIFORNIA ENERGY CODE. (CALGREEN SECTION 5.506.2) <br />8. HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL NOT CONTAIN ANY <br />CHLOROFLUOROCARBONS (CFSs). (CALGREEN SECTION 5.508.1.1) <br />9. HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL NOT CONTAIN ANY HALONS. (CALGREEN <br />SECTION 5.508.1.2) <br />10. LOW-RISE RESIDENTIAL: EACH BATHROOM SHALL BE MECHANICALLY VENTILATED. FANS SHALL BE ENERGY <br />STAR COMPLIANT AND BE DUCTED TO TERMINATE OUTSIDE THE BUILDING. UNLESS FUNCTIONING AS A <br />COMPONENT OF A WHOLE HOUSE VENTILATION SYSTEM, FANS MUST BE CONTROLLED BY A HUMIDITY <br />CONTROL. HUMIDITY CONTROLS SHALL BE CAPABLE OF ADJUSTMENT BETWEEN A RELATIVE HUMIDITY <br />RANGES OF LESS THAN OR EQUAL TO 50% TO A MAXIMUM OF 80%. A HUMIDITY CONTROL MAY UTILIZE MANUAL <br />OR AUTOMATIC MEANS OF ADJUSTMENT. (CALGREEN SECTION 4.506) <br />TITLE-24 MANDATORY MEASURES <br />EQUIPMENT AND SYSTEMS EFFICIENCY <br />1. ANY APPLIANCE FOR WHICH THERE IS A CALIFORNIA STANDARD ESTABLISHED IN THE APPLIANCE EFFICIENCY <br />STANDARDS MAY BE INSTALLED ONLY IF THE MANUFACTURER HAS CERTIFIED TO THE COMMISSION, AS <br />SPECIFIED IN THOSE REGULATIONS, T HAT THE APPLIANCE COMPLIES WITH THE APPLICABLE STANDARD FOR <br />THAT APPLIANCE. <br />2. PIPING AND DUCTING SYSTEMS SHALL BE INSULATED IN ACCORDANCE WITH THE SECTIONS 120.3, 120.4, 120.7 <br />OF TITLE 24 ENERGY EFFICIENCY STANDARDS, CHAPTER 6 OF THE 2022 CMC, AND ALL CODES HAVING <br />JURISDICTION. <br />3. ALL HVAC SYSTEMS SHALL MEET THE EFFICIENCY AND CONTROL REQUIREMENTS PER SECTION 110.2 AND 120.2 <br />E.E.S. <br />4. ALL HVAC EQUIPMENT AND APPLIANCES SHALL MEET THE REQUIREMENTS PER SECTION 110.1-110.3, 110.5, <br />120.1-120.4 TITLE-24 ENERGY STANDARDS. <br />5. EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH AN AUTOMATIC TIME SWITCH WITH AN <br />ACCESSIBLE MANUAL OVERRIDE THAT ALLOW OPERATION OF THE SYSTEM DURING OFF-HOURS FOR UP TO 4 <br />HOURS. THE TIME SWITCH SHALL BE CAPABLE OF PROGRAMMING DIFFERENT SCHEDULES FOR WEEKDAYS AND <br />WEEKENDS, INCORPORATE AN AUTOMATIC HOLIDAY "SHUT-OFF" FEATURE THAT TURNS OFF ALL LOADS FOR <br />AT LEAST 24 HOURS, THEN RESUMES THE NORMALLY SCHEDULED OPERATION, AND HAS PROGRAM BACKUP <br />CAPABILITIES THAT PREVENT THE LOSS OF THE DEVICE'S PROGRAM AND TIME SETTING FOR AT LEAST 10 <br />HOURS IF POWER IS INTERRUPTED. <br />6. EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS THAT TEMPORARILY RESTART AND <br />TEMPORARILY OPERATE THE SYSTEM AS REQUIRED TO MAINTAIN A SETBACK HEATING AND COOLING <br />THERMOSTAT SETPOINT. <br />7. EACH SPACE CONDITIONING ZONE SHALL BE CONTROLLED BY AN INDIVIDUAL THERMOSTATIC CONTROL THAT <br />RESPONDS TO TEMPERATURE WITHIN THE ZONE. WHERE USED TO CONTROL HEATING, THE CONTROL SHALL <br />BE ADJUSTABLE DOWN TO 55°F OR LOWER. FOR COOLING, THE CONTROL SHALL BE ADJUSTABLE UP TO 85°F <br />OR HIGHER. WHERE USED TO CONTROL BOTH HEATING AND COOLING, THE CONTROL SHALL BE CAPABLE OF <br />PROVIDING A DEAD BAND OR AT LEAST 5°F WITHIN WHICH THE SUPPLY OR HEATING AND COOLING IS SHUT OFF <br />OF REDUCED TO A MINIMUM. <br />8. THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN °F. <br />9. THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL. <br />10. VRF HEAT PUMPS SHALL BE INSTALLED WITH CONTROLS TO PREVENT ELECTRIC RESISTANCE <br />SUPPLEMENTARY HEATER OPERATION WHEN THE HEATING LOAD CAN BE MET BY VRF THE HEAT PUMP ALONE. <br />ELECTRIC RESISTANCE SUPPLEMENTARY HEATING OPERATION IS PERMITTED DURING TRANSIENT PERIODS, <br />SUCH AS START-UPS AND FOLLOWING ROOM THERMOSTAT SETPOINT ADVANCE, WHEN CONTROLS ARE <br />PROVIDED WHICH USE PREFERENTIAL RATE CONTROL, INTELLIGENT RECOVERY, STAGING, RAMPING, OR <br />SIMILAR CONTROL MECHANISMS DESIGNED TO PRECLUDE THE UNNECESSARY OPERATION OF <br />SUPPLEMENTARY HEATING DURING THE RECOVERY PERIOD. SUPPLEMENTARY HEATER OPERATION IS ALSO <br />PERMITTED DURING DEFROST. <br />11. GRAVITY OR AUTOMATIC DAMPERS INTERLOCKED AND CLOSED ON FAN SHUTDOWN SHALL BE PROVIDED ON <br />THE OUTSIDE AIR INTAKES AND DISCHARGES OF ALL SPACE CONDITIONING AND EXHAUST SYSTEMS. <br />12. ALL GRAVITY VENTILATING SYSTEMS SHALL BE PROVIDED WITH AUTOMATIC OR READILY ACCESSIBLE <br />MANUALLY OPERATED DAMPERS IN ALL OPENINGS TO THE OUTSIDE, EXCEPT FOR COMBUSTION AIR OPENINGS. <br />13. ALL BALANCING: ALL SPACE CONDITIONING AND VENTILATION SYSTEMS SHALL BE BALANCED TO THE <br />QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH AND PERFORMED BY A COMPANY CERTIFIED BY <br />THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL STANDARDS (1983), OR <br />ASSOCIATED AIR BALANCE COUNCIL (AABC) NATIONAL STANDARDS (1986). <br />14. OUTSIDE AIR CERTIFICATION: THE SYSTEM SHALL PROVIDE THE MINIMUM OUTSIDE AIR AS SHOWN ON THE <br />MECHANICAL DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED BY THE INSTALLING LICENSED C-20 <br />MECHANICAL CONTRACTOR. <br />15. THE AIR CONDITIONING SYSTEM SHALL BE ENERGIZED 1 HOUR IMMEDIATELY PRIOR TO OCCUPANCY TO <br />PROVIDE THE MINIMUM REQUIRED VENTILATION RATE. <br />R <br />ABBREVIATIONS HVAC LEGEND <br />CONTROLS (PLAN) <br />DUCTWORK <br />GENERAL <br />PIPING <br />BACKDRAFT DAMPER <br />AUTOMATIC DAMPER (WITH ACTUATOR) <br />REMOVE EXIST. EQUIP., PIPES, OR DUCT SHOWN HATCHED <br />DOOR LOUVER OR UNDERCUT <br />DUCT RISE / DUCT DROP <br />D.L./U.C. <br />MANUAL VOLUME DAMPER <br />EXIST. DUCTWORK TO BE REMOVED & CAPPED <br />EXIST. MECHANICAL EQUIPMENT & DUCT <br />EXIST. DIFFUSER OR RETURN AIR GRILLE TO <br />BE REMOVED <br />CO2 SENSORCO2 <br />x ROOM THERMOSTAT & ZONE NUMBERT <br />EM <br />ME <br />M <br />INSTALLED BY MECHANICAL <br />FURNISHED BY ELECTRICAL <br />BY MECHANICAL <br />FURNISHED & INSTALLED <br />INSTALLED BY ELECTRICAL <br />FURNISHED BY MECHANICAL <br />TOTAL LENGTH (FT) <br />CFM/FT <br /># OF SLOTS -SLOT WIDTH <br />AIR QUANTITY (C.F.M.) <br />TYPE <br />SUPPLY, RETURN, & EXHAUST REGISTER <br />LINEAR SUPPLY & RETURN <br />E <br />FURNISHED & INSTALLED <br />BY ELECTRICAL <br />AIR QUANTITY (C.F.M) <br />TYPE <br />RELIEF AIR GRILLE <br />DESCRIPTIONSYMBOL <br />14"x12" <br />RECTANGULAR DUCT SIZE <br />(WIDTH x DEPTH IN INCHES) <br />DUCT WITH SOUND INSULATION <br />SUPPLY AIR <br />RETURN AIR <br />EXHAUST AIR <br />FLEXIBLE DUCT <br />14"x12" <br />ROUND DUCT SIZE <br />(WIDTH x DEPTH IN INCHES) <br />14" <br />ø <br />14"ø <br />RECTANGULAR DUCT UP <br />RECTANGULAR DUCT DOWN <br />DUCT TRANSITION (RECTANGULAR TO ROUND) <br />LINEAR DIFFUSER <br />PIPE RISE <br />PIPE DROP <br />PIPE BRANCH <br />(REAG) <br />(RAR/EAR) <br />BAS BUILDING AUTOMATION SYSTEM <br />BDD BACKDRAFT DAMPER <br />CBC CALIFORNIA BUILDING CODE <br />CEC CALIFORNIA ELECTRICAL CODE <br />CFC CALIFORNIA FIRE CODE <br />CMC CALIFORNIA MECHANICAL CODE <br />CPC CALIFORNIA PLUMBING CODE <br />HRU HEAT RECOVERY UNIT <br />TYP TYPICAL <br />U/C UNDERCUT DOOR <br />EQUIPMENT NUMBER <br />TYPE MARK <br />EQUIPMENT TAG <br />UTR UP THROUGH ROOF <br />1. ALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENETS SHALL BE ANCHORED AND INSTALLED <br />PER THE DETAILS ON THE APPROVED CONSTRUCTION DOCUMENTS. WHERE NO DETAIL IS INDICATED, <br />THE FOLLOWING COMPONENETS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND <br />DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2022 CALIFORNIA BUILDING CODE REQUIREMENTS <br />IN ACCORDANCE WITH THE AMERICAN SOCIETY OF CIVIL ENGINEERS -ASCE 7-10, SECTION 13.6 AND <br />TABLE 13.6-1 <br />A. ALL PERMANENT EQUIPMENT AND COMPONENTS. <br />B. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED (E.G. HARD WIRED) <br />TO THE BUILDING UTILITY SERVICE SUCH AS ELECTRICITY, GAS OR WATER. <br />C. MOVABLE EQUIPMENT WHICH IS STATION IN ONE PLACE OR MORE THAN 8 HOURS AND HEAVIER <br />THAN 400 POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS. <br />2. THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO <br />THE STRUCTURE, BUT THE ATTACHMENT NEED NOT TO BE DETAILEDO N PLAN. THESE COMPONENETS <br />SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCAITED <br />DUCTWORK, PIPING, AND CONDUIT. <br />A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS LOCATED 4 <br />FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE <br />COMPONENT. <br />B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED SYSTEMS, <br />LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR HUNG <br />FROM WALL. <br />3. FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE <br />INSTALLATION SHALL BE INSTALLED PER SMACNA GUIDELINES AND/OR MANUFACTURER'S <br />RECOMMENDATIONS. <br />4. SEISMIC ANCHORAGE OF EQUIPMENT AND BRACING OF PIPING/DUCTWORK SYSTEMS SHALL BE <br />PROVIDED IN ACCORDANCE WITH THE AMERICAN SOCIETY OF CIVIL ENGINEERS -ASCE 7-10, 13.6 AND <br />TABLE 13.6-1. <br />EQUIPMENT ANCHORAGE AND BRACING <br />1. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY. DO NOT SCALE THE DRAWINGS TO <br />DETERMINE THE LOCATION OF EQUIPMENT OR UTILITIES. SEE ARCHITECTURAL PLANS, WHERE <br />PROVIDED ON PROJECT, FOR EXTENT OF DEMOLITION. <br />2. ITEMS NOT INDICATED TO BE REMOVED SHALL BE PROTECTED IN PLACE. <br />3. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL ITEMS INDICATED TO BE REMOVED. PENDING <br />OWNER'S INSPECTION AND REVIEW, ALL SUCH ITEMS SHALL BE REMOVED INTACT, FULLY FUNCTIONAL <br />AND SUITABLE FOR REUSE, AND SHALL BE PROTECTED FROM DAMAGE. CONTRACTOR SHALL CONFIRM <br />WITH THE OWNER'S REPRESENTATIVE ACCEPTANCE OR REFUSAL OF SUCH ITEMS. ALL ITEMS <br />ACCEPTED BY THE OWNER SHALL BE DELIVERED BY THE CONTRACTOR TO ONSITE STORAGE <br />LOCATIONS AS DIRECTED BY THE OWNER'S REPRESENTATIVE. ALL ITEMS REFUSED BY THE OWNER <br />SHALL BE DISPOSED OF BY THE CONTRACTOR IN AN APPROVED MANNER. <br />4. NO EXISTING EQUIPMENT OR MATERIAL SHALL BE REUSED WITHOUT THE SPECIFIC APPROVAL OF THE <br />OWNER'S REPRESENTATIVE. <br />5. REMOVAL OF CERTAIN EXISTING WORK WILL BE NECESSARY FOR THE SATISFACTORY PERFORMANCE <br />OF THE GENERAL WORK. NOT ALL EXISTING CONDITIONS ARE DETAILED ON THE DRAWINGS. <br />CONTRACTOR SHALL SURVEY THE SITE AND MAKE ALL NECESSARY CHANGES REQUIRED BASED ON <br />THE EXISTING CONDITIONS FOR THE PROPER INSTALLATION OF NEW WORK. <br />6. THE EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD DRAWINGS AND SHOWN FOR <br />REFERENCE CONTRACTOR SHALL VERIFY ACTUAL EXISTING CONDITIONS AT SITE PRIOR TO <br />SUBMITTING BID. ALL DEMOLITION, ALTERATION, EXTENSION, RELOCATION, REHABILITATION WORK <br />SHALL BE INCLUDED IN CONTRACT. NO ADDITIONAL ALLOWANCE OR CHANGE ORDERS WILL BE <br />ACCEPTED. <br />7. CONTRACTOR IS RESPONSIBLE TO RELOCATE OR REMOVE FROM WALLS, CEILINGS, FLOOR SPACES, <br />ETC. ANY EXISTING PIPING, DUCT, FIRE-SMOKE DAMPERS, OR OTHER MECHANICAL EQUIPMENT WHICH <br />INTERFERES WITH PLANNED REMODEL WORK. <br />8. NOTIFY THE ENGINEER IMMEDIATELY WHEREVER EXISTING EQUIPMENT IS ENCOUNTERED WHICH MUST <br />BE RELOCATED DUE TO THE NEW CONSTRUCTION, OR NOT INDICATED ON AS-BUILT DRAWINGS OR WAS <br />BURIED UNDERGROUND OR EMBEDDED IN STRUCTURE WALLS. <br />9. CAREFULLY PROTECT ALL WALLS, TRIM, FLOORS, EQUIPMENT, UTILITY LINES AND MATERIALS. WHEN <br />WORKING ON FINISHED SURFACES, LIMIT DAMAGE TO THE SMALLEST AREA POSSIBLE AND RESTORE <br />TO THE ORIGINAL CONDITION ALL SURFACES WHICH ARE DAMAGED BECAUSE OF THE INSTALLATION <br />OF THIS WORK. <br />10. EQUIPMENT, MATERIALS AND SUPPLIES TEMPORARILY REMOVED FOR PROTECTION SHALL BE <br />REPLACED IN ORIGINAL LOCATIONS. ANY MATERIALS DAMAGED SHALL BE REPLACED WITH NEW <br />MATERIALS OF LIKE KIND AND QUALITY. <br />11. DEMOLITION WORK SHALL BE DONE IN A MANNER WHICH WILL NOT CAUSE UNNECESSARY <br />INCONVENIENCE OR DANGER TO USERS OF THE PREMISES AND ADJACENT SITE, AND NOT INTERFERE <br />WITH ITS OPERATION. ANY DEMOLITION WORK TO BE PERFORMED MUST BE PLANNED IN ADVANCE. <br />12. RESEAL ALL PENETRATIONS OR OPENING THROUGH WALLS, CEILING, FLOORS, ETC., TO MAINTAIN THE <br />RATING OF STRUCTURE. <br />13. ALL REMOVED MATERIALS AND EQUIPMENT WHICH ARE SALVAGED MATERIALS SHALL REMAIN IN THE <br />PROPERTY OF THE OWNER. DELIVER SUCH SALVAGED MATERIALS AND EQUIPMENT ON THE PREMISES <br />AS DIRECTED BY OWNER AND NEATLY PILE OR STORE AND PROTECT FROM DAMAGE. DISPOSE OF ALL <br />HAZARDOUS MATERIAL PER FEDERAL, STATE AND LOCAL REGULATIONS AND OTHER AGENCIES <br />HAVING JURISDICTION. <br />14. ALL DEMOED, ALTERED AND RELOCATED COMPONENTS SHALL BE REFLECTED ON THE AS-BUILT <br />RECORD DOCUMENTS. <br />GENERAL DEMOLITION NOTES <br />1. ALL DRAWINGS ARE CONSIDERED TO BE PART OF THE CONTRACT DOCUMENT. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL DRAWINGS PRIOR TO ANY <br />CONSTRUCTION, INCLUDING STRUCTURAL, PLUMBING, AIR CONDITIONING AND ELECTRICAL. ANY <br />DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO <br />THE START OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN <br />CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENT SHALL BE CORRECTED BY <br />THE CONTRACTOR AT HIS OWN EXPENSE, AND AT NO EXPENSE TO THE OWNER. <br />2. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE CONSTRUCTION <br />STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO <br />PROCEEDING WITH THE WORK. <br />3. DO NOT SCALE DRAWINGS. ALL DIMENSIONS AND JOB SITE CONDITIONS SHALL BE VERIFIED BY THE <br />CONTRACTOR AT THE JOB SITE PRIOR TO BID SUBMITTAL, START OF CONSTRUCTION AND/OR <br />FABRICATION OF MATERIALS. IF DISCREPANCIES ARE ENCOUNTERED, THE ENGINEER SHALL BE <br />NOTIFIED FOR CLARIFICATION. <br />4. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, EQUIPMENT, TRANSPORTATION AND <br />SERVICES NECESSARY FOR COMPLETION OF THE WORK AND PROVIDE A FULLY OPERATIONAL SYSTEM. <br />ALL MATERIALS AND WORK SHALL COMPLY WITH APPLICABLE CODES AND GOVERNING REGULATIONS <br />AND MEET THE APPROVAL OF THE CITY AND STATE FIRE MARSHALL. <br />5. CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR PROTECTION AND REPAIR OF ADJACENT <br />EXISTING SURFACES AND AREAS WHICH MAY BE DAMAGED AS A RESULT OF DEMOLITION AND/OR NEW <br />WORK. <br />6. ALL EQUIPMENT THAT IS REMOVED AND NOT REUSED SHALL BE COORDINATED WITH, AND/OR <br />RETURNED TO, THE BUILDING OWNER. <br />7. VERIFY FINAL LOCATION OF THERMOSTATS WITH ARCHITECT AND/OR TENANT CONSTRUCTION <br />COORDINATOR PRIOR TO ANY INSTALLATION WORK <br />8. CONTRACTOR SHALL PROVIDE RECORD/AS BUILT DOCUMENTS TO CONSTRUCTION COORDINATOR, <br />ARCHITECT AND ENGINEER AT COMPLETION OF CONSTRUCTION. <br />9. MAINTAIN NET FREE AREA EQUAL TO DUCT SIZE WHERE FIRE DAMPERS OCCUR. <br />10. ROOM THERMOSTATS SHALL BE CAPABLE OF BEING SET TO MAINTAIN SPACE TEMPERATURE SET <br />POINTS FOR 55° F TO 85° F AND SHALL BE CAPABLE OF OPERATING THE HEATING AND COOLING IN <br />SEQUENCE. THERMOSTATS SHALL BE ADJUSTABLE TO PROVIDE A TEMPERATURE RANGE OF UP TO 5° <br />F BETWEEN FULL HEATING AND FULL COOLING BEING SUPPLIED. TEMPERATURE CONTROL SYSTEM <br />SHALL OPERATE IN ACCORDANCE WITH THE BASE BUILDING SEQUENCE OF OPERATION <br />11. PROVIDE MINIMUM DUCT RADIUS ON ELBOWS AT 1-1/2 TIMES DUCT SIZE. <br />12. ALL CEILING DIFFUSERS ARE 4-WAY THROW UNLESS NOTED OTHERWISE. <br />A. DIFFUSERS SHALL BE ADJUSTED BY MECHANICAL CONTRACTOR AND/OR TEST & BALANCE <br />CONTRACTOR FROM 4-WAY TO 3-WAY OR 2-WAY WHEN WITHIN 3'-0 OF ADJACENT WALL OR <br />CORNER. SUBMIT PROPOSED ADJUSTMENTS IN WRITING PRIOR TO ADJUSTING. <br />13. CONTRACTOR SHALL STRICTLY COORDINATE ALL CEILING DIFFUSERS AND GRILLES WITH <br />ARCHITECTURAL REFLECTED CEILING PLAN. IF ANY DISCREPANCIES ARE ENCOUNTERED THE <br />ENGINEER SHALL BE NOTIFIED FOR CLARIFICATION. VERIFY WITH OWNERS REPRESENTATIVE IN FIELD <br />PRIOR TO INSTALLATION. <br />14. MATERIALS EXPOSED WITHIN DUCT OR PLENUM SHALL COMPLY WITH SECTION 602.2 AND 605.0 OF THE <br />2022 CMC. ALL MATERIALS EXPOSED WITHIN THE CEILING PLENUM SHALL HAVE A FLAME-SPREAD <br />INDEX OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NOT MORE THAN 50. <br />15. PROVIDE SMOKE DETECTORS IN MAIN SUPPLY AIR DUCTS OF AIR MOVING SYSTEMS EXCEEDING 2,000 <br />CFM PER SECTION 608.0 CMC. <br />16. MECHANICAL SYSTEMS SHALL COMPLY WITH REQUIREMENTS OF 2022 CFC SECTION 606. <br />17. VENTS SHALL NOT TERMINATE LESS THAN 3-FT. ABOVE ANY OUTSIDE-OR MAKEUP-AIR INLET LOCATED <br />WITHIN 10-FT. AT THE ROOF LEVEL, PER CMC 806.6. <br />18. THE CONTRACTOR SHALL COORDINATE ALL CEILING ACCESS PANELS FOR SERVICING MECHANICAL <br />EQUIPMENT/DEVICES WITH THE ARCHITECT AND INTERIOR DESIGNER AS APPLICABLE. <br />19. PRIOR TO ROUGH-IN OF ELECTRICAL. PROVIDE COORDINATION SHOP DRAWINGS OF T-STAT LOCATIONS <br />TO ARCH./ENG. FOR REVIEW. <br />20. DUCT SEALING: <br />A. DUCTWORK SHALL BE SEALED PRIOR TO DELIVERY TO JOB SITE. <br />B. DUCTWORK SHALL BE SEALED DURING DELIVERY. <br />C. DUCTWORK SHALL BE SEALED UPON INSTALLATION. <br />D. OPENINGS INTO EQUIPMENT AND DUCTWORK SHALL BE SEALED DURING CONSTRUCTION. <br />21. ALL CONTROL WIRING ROUTED IN CEILING SPACE SHALL BE CLEARLY IDENTIFIED & SECURED TO <br />DUCTWORK OR TIGHT TO STRUCTURE TO PREVENT DAMAGE DURING FUTURE TENTANT IMPROVEMENT <br />PROJECTS. <br />22. THE CONTRACTOR SHALL VERIFY ALL DIFFUSER/GRILLE/REGISTER/BORDER AND FRAME TYPES WITH <br />THE ARCHITECTURAL REFLECTED CEILING PLAN PRIOR TO ORDERING. COORDINATE ALL FINISHES <br />WITH ARCHITECT. <br />23. ALL HVAC SYSTEMS INCLUDING HYDRONIC SYSTEMS SHALL BE BALANCED IN ACCORDANCE WITH AN <br />APPROVED METHOD PER THE CMC SECTION 317.1, CALGREEN AND THE ENERGY EFFICIENCY <br />STANDARDS. <br />24. THROUGH-PENETRATIONS AND MEMBRANE PENETRATIONS SHALL BE PROTECTED BY AN APPROVED <br />PENETRATION FIRESTOP SYSTEM OR MEMBRANE PENETRATION FIRESTOP SYSTEM INSTALLED AS <br />TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479, WITH MINIMUM POSITIVE PRESSURE <br />DIFFERENTIAL OF 0.01 INCH (2.49 PA) OF WATER OR AS OTHERWISE PERMITTED BY CBC, SECTION 714. <br />LISTED THROUGH-PENETRATION FIRESTOP SYSTEMS AND MEMBRANE PENETRATIONS SHALL BE <br />INSTALLED IN ACCORDANCE WITH THE INSTALLATION FOR DETAILS LISTED SYSTEMS. LISTED <br />THROUGH-PENETRATION FIRESTOP SYSTEMS, MEMBRANE PENETRATION PROTECTION AND OTHER <br />PERMITTED MEANS AND METHODS OF PENETRATION PROTECTION SHALL BE SUBMITTED FOR OSHPD <br />FDD REVIEW AND APPROVAL PRIOR TO INSTALLATION. <br />25. PROVIDE BALANCING VOLUME DAMPERS IN EACH BRANCH DUCT AND IN EACH MAIN DUCT TO PROVIDE <br />FOR COMPLETE AIR BALANCING. PROVIDE ADEQUATE ACCESS. OPPOSED BLADE DAMPERS (OBD'S) <br />ARE NOT CONSIDERED BALANCING DAMPERS. COORDINATE ALL LOCATIONS WITH ARCHITECT'S <br />REFLECTED CEILING PLAN WHERE REMOTE BALANCING DAMPERS ARE REQUIRED. <br />26. PROVIDE INTERNALLY LINED DUCTWORK FOR SUPPLY AND RETURN AIR PLENUMS ON ALL FAN COILS <br />WITH MINIMUM ONE-INCH THICK ACOUSTICAL DUCT LINER. <br />27. INSTALL DIELECTRIC INSULATION WHERE COPPER PIPES CONNECT TO FERROUS PIPES, COMPONENTS <br />AND EQUIPMENT. <br />28. OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED WITH DAMPERS THAT <br />AUTOMATICALLY CLOSE UPON FAN SHUTDOWN. <br />GENERAL MECHANICAL NOTES <br />11870 Pierce Street, Suite 160 <br />Riverside, California 92505 <br />951.299.4160 www.tk1sc.com <br />C O L L A B O R A T I V E <br />THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO SVA ARCHITECTS <br />INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF <br />EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY <br />NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR <br />DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SVA <br />ARCHITECTS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. <br />SCALE: <br />REVISIONS: <br />OW <br />N <br />E <br />R <br />: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />CL <br />I <br />E <br />N <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />DATE ISSUED: <br />PROJECT NO: <br />Project Leader -David Mitchell <br />Mechanical Lead -Robert San Jose <br />tk1sc Job #:B2202330.000 <br />12" = 1'-0" <br />Issue Date <br />M001 <br />MECHANICAL <br />LEAD SHEET <br />2022-40123 <br />CI <br />T <br />Y <br /> <br />O <br />F <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />NE <br />W <br />H <br />O <br />P <br />E <br /> <br />L <br />I <br />B <br />R <br />A <br />R <br />Y <br />MO <br />D <br />E <br />R <br />N <br />I <br />Z <br />A <br />T <br />I <br />O <br />N <br />12 <br />2 <br /> <br />N <br />. <br /> <br />N <br />E <br />W <br />H <br />O <br />P <br />E <br /> <br />S <br />T <br />. <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br />APPLICABLE CODES <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA ENERGY STANDARDS <br />2022 CAL GREEN CODE <br />ALL OTHER APPLICABLE LOCAL AND STATE LAWS AND REGULATIONS <br />DESCRIPTION DATE <br />100% CD 08/16/23 <br />1 ASI #1 4/9/25 <br />SHEET INDEX <br />M001 MECHANICAL LEAD SHEET <br />M002 MECHANICAL SCHEDULES <br />1 <br />M40.7 MECHANICAL EXISTING ROOF PLAN DEMOLITION <br />M003 MECHANICAL TITLE 24 COMPLIANCEM11.2 MECHANICAL FLOOR PLAN <br />M11.1 MECHANICAL EXISTING FLOOR PLAN DEMOLITION <br />M11.2 MECHANICAL FLOOR PLANM11.1 MECHANICAL EXISTING FLOOR PLAN DEMOLITION <br />MP11.2 MECHANICAL REFRIGERANT PIPING FLOOR PLAN <br />M40.6 MECHANICAL ROOF PLANMP11.2 MECHANICAL REFRIGERANT PIPING FLOOR PLAN <br />M40.7 MECHANICAL EXISTING ROOF PLAN DEMOLITIONM002 MECHANICAL SCHEDULES <br />M50.1 MECHANICAL DETAILSM003 MECHANICAL TITLE 24 COMPLIANCE <br />M60.1 MECHANICAL CONTROLS <br />M60.2 MECHANICAL CONTROLS <br />Exp. 12/31/245