Laserfiche WebLink
A A <br />B B <br />C C <br />D D <br />E E <br />F F <br />1 <br />1 <br />2 <br />2 <br />3 <br />3 <br />4 <br />4 <br />5 <br />5 <br />NE <br />W <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />F <br />A <br />C <br />A <br />D <br />E <br />EXISTING <br />BUILDING FACADE <br />D1 <br />D2 <br />D5 <br />D8 <br />D7 <br />D9 <br />D10 <br />D11D11 <br />D12 <br />D13 <br />D14 <br />D12 <br />D13 <br />D15 <br />D16 <br />D16 <br />D17 <br />D18 <br />D19 <br />D4 <br />D3 <br />D10 <br />D20 <br />D21 <br />D22 <br />D22 <br />D22 <br />15 SPOTS <br />9 SPOTS <br />9 SPOTS <br />9 SPOTS <br />D2 <br />3 <br />D24 <br />D25D25 <br />D25 <br />D26 <br />D27 <br />D18 <br />D20 <br />D14 <br />D10 <br />D18 <br />⅊ <br />⅊ <br />⅊ <br />⅊ <br />℄ <br />NE <br />W <br />H <br />O <br />P <br />E <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />D28 <br />D29 <br />D18 <br />TYP. <br />D18 <br />TYP. <br />TYP. <br />1. DEMOLITION DRAWINGS PREPARED BY THE ARCHITECT ARE FOR A GENERAL DESCRIPTION OF <br />EXISTING BUILDING COMPONENTS, ASSEMBLIES AND MATERIALS TO BE REMOVED. DEMOLITION <br />CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITION AND QUANTITIES. <br />2. DEMOLITION CONTRACTOR IS RESPONSIBLE FOR PROVIDING NECESSARY PERMITS REQUIRED <br />BY FEDERAL, STATE AND LOCAL MUNICIPAL AGENCIES HAVING JURISDICTIONAL AUTHORITY <br />OVER ANY ASPECT OF THE DEMOLITION SCOPE. <br />3. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO DEMOLITION WORK. <br />4. DEMOLITION CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL <br />DEMOLISHED MATERIALS IN A MANNER COMPLIANT TO FEDERAL, STATE AND LOCAL MUNICIPAL <br />REQUIREMENTS AND GUIDELINES. <br />5. DEMOLITION CONTRACTOR SHALL COORDINATE ALL WORK SCHEDULES WITH OWNER. IN NO <br />CASE SHALL DEMOLITION WORK BE CONDUCTED DURING HOURS PROHIBITED BY LOCAL <br />MUNICIPALITY. <br />6. PLANS ARE BASED ON EXISTING RECORD DRAWINGS AND VISUAL OBSERVATION. <br />UNIDENTIFIED ITEMS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNERS <br />REPRESENTATIVE PRIOR TO REMOVAL. <br />7. ALSO REFERENCE CIVIL, STRUCTURAL, PLUMBING, MECHANICAL AND ELECTRICAL <br />DEMOLITION DRAWINGS FOR ADDITIONAL COORDINATION OF ITEMS TO BE REMOVED OR <br />PROTECTED IN PLACE. <br />8. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION COORDINATION AND PATCH BACK FOR <br />STRUCTURAL, PLUMBING, MECHANICAL AND ELECTRICAL DEMOLITION. <br />9. ELECTRICAL CONTRACTOR TO LOCATE CONNECTIVITY AND CONDUIT RUNS. <br />D1 <br />D2 <br />D3 <br />D4 <br />D5 <br />(E) SITE WALLS TO BE REMOVED <br />D6 <br />(E) BOOK RETURN TO BE REMOVED AND RELOCATED. REFER TO FOR <br />NEW LOCATION <br />(E) PARKING GATE TO BE SALVAGED AND RELOCATED PER A01.2, PATCH <br />AND FILL CONCRETE, REFEER TO CIVIL FOR ADDITIONAL INFORMATION <br />(E) CONCRETE TO BE REMOVED REFER TO CIVIL FOR ADDITIONAL <br />INFORMATION <br />(E) CONCRETE SIDEWALK TO BE REMOVED <br />D7 <br />D8 <br />D9 <br />D10 <br />(E) TRUNCATED DOMES TO BE REMOVED <br />(E) TRASH CAN TO BE REMOVED <br />(E) BIKE RACKS TO BE REMOVED <br />(E) LANDSCAPE TO BE REMOVED. REFER TO CIVIL FOR EXTENT OF SCOPE <br />D11 (E) CURB TO BE REMOVED <br />D12 <br />D13 <br />D14 <br />(E) IRRIGATION CONTROL VALVE TO BE PROTECTED IN PLACE. REFER TO <br />CIVIL FOR ADDITIONAL INFORMATION. <br />(E) IRRIGATION PULL BOX TO BE PROTECTED IN PLACE. REFER TO CIVIL <br />FOR ADDITIONAL INFORMATION. <br />(E) ADA PARKING STALL SIGN TO BE REMOVED AND RELOCATED. <br />D15 <br />D16 <br />D17 <br />D18 <br />(E) THREE (3) LANDSCAPE LIGHT FIXRURES TO BE REMOVED, REFER TO <br />CIVIL FOR ADDITIONAL INFORMATION <br />(E) TREES TO BE PROTECTED IN PLACE <br />(E) CURB TO BE PROTECTED IN PLACE <br />(E) AC PAVEMENT TO BE PROTECTED IN PLACE <br />D19 (E) FLAG POLE TO BE PROTECTED IN PLACE <br />D20 (E) GATE TO BE REMOVED <br />D21 (E) SIDING ON PRECAST WALL TO BE REMOVED. PRECAST WALL TO REMAIN <br />D22 (E) REMOVE PARKING STRIPING AND WHEEL STOP (WHERE OCCURS) <br />D23 NOT USED <br />D24 (E) STEEL FENCE AND LOW CMU WALL TO BE REMOVED. <br />D25 (E) VIDEO SURVEILLANCE CAMERA TO BE REMOVED, PATCH AND REPAIR IN KIND <br />D26 (E) VIDEO SECURITY SURVEILLANCE TO REMAIN PROTECTED IN PLACE <br />D27 (E) DEMO EXISTING SIGN ON BUILDING, PREP AREA FOR NEW CORTEN PANELS <br />NOT USED <br />D28 (E) HOSE BIB TO REMAIN AND PROTECT IN PLACE <br />D29 (E) ELECTRICAL JUCTION BOX TO REMAIN AND PROTECT IN PLACE <br />THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO SVA ARCHITECTS <br />INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF <br />EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY <br />NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR <br />DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SVA <br />ARCHITECTS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. <br />SCALE: <br />REVISIONS: <br />OW <br />N <br />E <br />R <br />: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />CL <br />I <br />E <br />N <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />6 HUTTON CENTRE DR, SUITE 1150 SANTA ANA, CA 92707 <br />T 949.809.3380 WWW.SVA-ARCHITECTS.COM <br />DATE ISSUED: <br />PROJECT NO: <br />As indicated <br />07/08/24 <br />A01.1 <br />SITE <br />DEMOLITION <br />PLAN <br />2022-40123 <br />CI <br />T <br />Y <br /> <br />O <br />F <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />NE <br />W <br />H <br />O <br />P <br />E <br /> <br />L <br />I <br />B <br />R <br />A <br />R <br />Y <br />MO <br />D <br />E <br />R <br />N <br />I <br />Z <br />A <br />T <br />I <br />O <br />N <br />12 <br />2 <br /> <br />N <br />. <br /> <br />N <br />E <br />W <br />H <br />O <br />P <br />E <br /> <br />S <br />T <br />. <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br />1" = 10'-0"1SITE DEMOLITION PLAN DEMOLITION NOTES <br />SITE DEMOLITION PLAN KEYNOTES <br />DESCRIPTION DATE <br />1 ASI #01 04/09/25 <br />3 ASI #03 07/02/25 <br />4 ASI #04 09/18/25 <br />4 <br />4