Job Name: Muller Santa Ana <br />Job Number: 2021-SRS004 <br />Date: 11/9/21 <br />will be used to embed bolts into the top of the column to resist shear, but anchor rods <br />will drop down the side of the column and fasten below the tension tendons from the <br />beams to resolve uplift. <br />The worst-case shear loading at one of these anchor points is at C11: <br />̗Vmax 9.7kip <br />See Calculation C3 for check of shear transfer. Use (4) 7/8" dia F1554 Gr 55 rods <br />in HIT HY-200 epoxy with 8" embed. <br />The worst-case uplift loading at one of these anchor points is at D5: <br />, the connections to column will each take 1/2 of this load.̗Tmax -20.25 kip <br />See Calculation C4 for check of tension transfer. Use (3) 7/8" dia F1554 Gr 55 rods <br />in HIT HY-200 epoxy with 8" embed one each side of column. <br />Connection at C6, C7 and C8: <br />These connections use a combination of saddling the beam like at C12 and bolting <br />to the column as in C5. Loads are similar to each of these. The shear is transferred <br />to the column top just like at C5. <br />Connections at C1 and D1: See Calculation C5 <br />These saddle connections attach to a 12" thick shear wall. This saddle will wrap <br />around the two sides of the wall with through bolts through the wall. Use (4) 7/8" <br />diameter F1554 Gr 55 rods. <br />Connection at B2: See Calculation C6 <br />This saddle connection attaches to a column that rises above deck. This saddle will <br />wrap around the two sides of the column with (3) 1" diameter F1554 Gr 55 rods <br />embeded 8" in HIT HY-200. This connection shows failure in shear breakout, but the <br />shear in this case is running parallel to the tension rebar in the concrete column. This <br />column has 4-#11 and 6-#8 bars spread out in it. A single #8 bar in tension can <br />carry the load transferred from the connection. <br />Page 4 <br />2677 N Main St - <br />101110159-60 & <br />20175958-5902/07/23