Laserfiche WebLink
SOLAREDGE BACKUP <br />INTERFACE BI-NUSGN-01 <br />200A RATED, 240V <br />NEMA 3R, UL LISTED <br />CONTROLLER <br />G <br />N <br />(E) BACKUP LOAD PANEL GE, <br />125A RATED, 120/240V <br />30A/2P <br />N <br />G <br />AUTO TRANSFORMER AUTO TRANSFER RELAY <br />L1 <br />L2 <br />N <br />G <br />3 <br />(N) SOLAR BREAKER <br />L1 L2 N G <br />(N) BACKUP BREAKER <br />240V, 100A/2P <br />1 2 <br />G <br />L1 <br />L2 <br />(14) JA SOLAR:JAM54S31 405/MR <br />405W MODULES <br />-+ <br />-++ <br />-+ <br />+++--- <br />2 <br />-+ <br />- <br />1 3 <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />STRING #1 <br />13 14 <br />SOLAREDGE POWER OPTIMIZERS S440 RATED <br />DC INPUT POWER - 440WATTS <br />MAXIMUM INPUT VOLTAGE - 60 VDC <br />MPPT RANGE - 8 TO 60 VDC <br />MAXIMUM SHORT CIRCUIT CURRENT - 14.5 ADC <br />MAXIMUM OUTPUT CURRENT - 15 ADC <br />STRING LIMITATIONS - 8 TO 25 OPTIMIZERS, <br />5700 WATTS STC PER STRING MAXIMUM <br />JUNCTION BOX, <br />600V, NEMA 3R, <br />UL LISTED LOAD GN <br />PV DISCONNECT(2 OF 2) <br />240V, 1ɸ, 3W <br />30A RATED <br />NEMA 3R (EATON DG221URB) <br />VISIBLE, LOCKABLE, <br />LABELED AC DISCONNECT <br />LOCATED WITHIN 10' OF <br />UTILITY METER <br />LINE <br />4 <br />SOLAREDGE: SE5700H-US <br />HOME HUB INVERTER <br />OUTPUT: 240 VAC, 24A <br />99% CEC WEIGHTED EFFICIENCY <br />NEMA 3R, UL LISTED, INTERNAL GFDI <br />WITH INTEGRATED DC DISCONNECT <br />3A <br />L1 <br />L2 <br />G <br />10 kWh <br />SOLAREDGE <br />ENERGY BANK <br />NOTE: ANY MULTIWIRE BRANCH <br />CIRCUITS RELOCATED ARE TO <br />BE IDENTIFIED, GROUPED, AND <br />EQUIPPED WITH A 2- <br />POLE OCPD BREAKER PER CEC <br />210.4(B,D). <br />"NOTE: ALL LOADS ARE <br />EXISTING AND MOVED <br />FROM MAIN PANEL" <br />NOTE: IF THE RELOCATED <br />LOADS EXTEND <br />MORE THAN 6 FEET, AFCI <br />PROTECTION <br />APPLIES PER 2019 CEC 210.12 <br />LOAD SIDE <br />INTERCONCECTION <br />AT MAIN PANEL PER <br />ART. 705.12 <br />L1 <br />L2 <br />G <br />N <br />(N) MAIN BREAKER TO <br />HOUSE 240 V, 200A/2P <br />(1 OF 2) <br />N <br />G <br />NL2L1 <br />TO UTILITY GRID <br />M BI-DIRECTIONAL <br />UTILITY METER <br />120/240V, 1ɸ, 3-W <br />(N) MAIN SERVICE <br />PANEL, <br />200A RATED, 240V <br />L1 <br />L2 <br />G <br />10 kWh <br />SOLAREDGE <br />ENERGY BANK <br />4 <br />INTERCONNECTION REF <br />705.12 BACKFEED <br />100A/2P <br />(E) BONDING JUMPER <br />PER NEC 250.92(A)(2) <br />NEW GROUNDING ELECRODES & <br />NEW AUXILLARY GROUNDING <br />ELECTRODE (6 FEET APART). REQ. <br />5/8" DIA. GROUNDING ROD WITH 8' <br />MIN. EMBEDMENT <br />MIN 6" BETWEEN <br />ELECTRODES <br />BOND COLD WATER <br />& GAS LINE <br />CEC 250.104 (A) & (B) <br />NOTE: <br />1. UPGRADE METER MAIN COMBO TO 200A RATED BUS <br />WITH 200A MAIN BREAKER. <br />2. NEW MSP WILL INSTALLATED IN THE SAME LOCATION <br />AS THAT OF EXISTING MSP. <br />L1 <br />L2 <br />N <br />G <br />3 <br />REV <br />SHEET NAME <br />SHEET SIZE <br />SHEET NUMBER <br />EL <br />V <br />I <br />S <br /> <br />M <br />A <br />R <br />T <br />I <br />N <br />E <br />Z <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />14 <br />2 <br />9 <br /> S <br />G <br />A <br />R <br />N <br />S <br />E <br />Y <br /> <br />S <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br />CA <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />ANSI B <br />11" X 17" <br />DATEDESCRIPTION <br />REVISIONS <br />PROJECT NAME & ADDRESS <br />DATE:05/05/2025 <br />DRAWN BY <br />ESR <br />MONA LEE SOLAR <br />D08/05/2025AHJ COMMENT <br />ELECTRICAL LINE <br />DIAGRAM <br />1 ELECTRICAL LINE DIAGRAM <br />PV-6 SCALE: NTS PV-6 <br />INSTALLER / ELECTRICIAN NOTE: <br />EC IS TO MEASURE VOLTAGE BEFORE STARTING WORK. <br />IF RESULT IS ANY OTHER VOLTAGE MEASURED THAN <br />120/240V IS OBSERVED, DO NOT PROCEED. CONTACT <br />ENGINEER. <br />GROUNDING & GENERAL NOTES: <br />1. A SECOND FACILITY GROUNDING ELECTRODE IS NOT REQUIRED PER [CEC <br />690.47(C)(3)] <br />2. PV INVERTER IS UNGROUNDED, TRANSFORMER-LESS TYPE. <br />3. DC GEC AND AC EGC TO REMAIN UNSPLICED, OR SPLICED TO EXISTING <br />ELECTRODE <br />4. ANY EXISTING WIRING INVOLVED WITH PV SYSTEM CONNECTION THAT IS <br />FOUND TO BE INADEQUATE PER CODE SHALL BE CORRECTED PRIOR TO FINAL <br />INSPECTION. <br />5. JUNCTION BOX QUANTITIES, AND PLACEMENT SUBJECT TO CHANGE IN THE <br />FIELD - JUNCTION BOX DEPICTED ON ELECTRICAL DIAGRAM REPRESENT WIRE <br />TYPE TRANSITIONS. <br />6. AC DISCONNECT NOTED IN EQUIPMENT SCHEDULE OPTIONAL IF OTHER <br />AC DISCONNECTING MEANS IS LOCATED WITHIN 5' OF SERVICE DISCONNECT. <br />7. RACEWAYS AND CABLES EXPOSED TO SUNLIGHT ON ROOFTOPS SHOULD BE <br />INSTALLED MORE THAN 7/8" ABOVE THE ROOF USING CONDUIT SUPPORTS. <br />8. ALL NEW SERVICE INSTALLATIONS AND REPLACEMENTS REQUIRE A <br />SURGE-PROTECTIVE DEVICE (SPD) IN ACCORDANCE WITH [CEC 230.67]. THE <br />SPD SHALL BE TYPE 1 OR TYPE 2 AND IS REQUIRED TO BE AN INTEGRAL PART OF <br />THE SERVICE EQUIPMENT OR LOCATED IMMEDIATELY ADJACENT THERETO. <br />INTERCONNECTION NOTES: <br />1. INTERCONNECTION SIZING, LIMITATIONS AND COMPLIANCE <br />DETERMINED IN ACCORDANCE WITH [CEC 705.12], AND [CEC 690.64]. <br />2. GROUND FAULT PROTECTION IN ACCORDANCE WITH [CEC 215.9], <br />[CEC 230.95] AND [CEC 690.5] <br />3. ALL EQUIPMENT TO BE RATED FOR BACKFEEDING. <br />4. PV BREAKER TO BE POSITIONED AT THE OPPOSITE END OF THE <br />BUSBAR RELATIVE TO THE MAIN BREAKER. <br />DISCONNECT NOTES: <br />1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN <br />THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE <br />CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY <br />THE UPPER TERMINALS) <br />2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY <br />PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH <br />RACKING NOTES: <br />1. BOND EVERY OTHER RAIL WITH #6 BARE COPPER <br />QTY CONDUCTOR INFORMATION CONDUIT TYPE CONDUIT <br />SIZE <br />(2) <br />N/A N/A <br />(1)1 BARE COPPER IN FREE AIR <br />PV WIRE/USE-2 <br />#6AWG - <br />#10AWG - <br />(2)#10AWG -CU,THWN-2 <br />EMT OR LFMC 3/4"(1)#8AWG -CU,THWN-2 GND2 <br />#10AWG - <br />#10AWG - <br />#10AWG - <br />(2)CU,THWN-2 <br />(1)CU,THWN-2 N <br />(1)CU,THWN-2 GND <br />EMT,LFMC OR PVC3 3/4" <br />#3AWG - <br />#3AWG - <br />#8AWG - <br />(2)CU,THWN-2 <br />(1)CU,THWN-2 N <br />(1)CU,THWN-2 GND <br />EMT,LFMC OR PVC 1''4 <br />DC SYSTEM SIZE: 5.670 KW DC <br />AC SYSTEM SIZE: 5.700 KW AC & 5.150 KW CEC AC <br />14 JA SOLAR: JAM54S31 405/MR 405W MONO MODULES WITH <br />14 SOLAREDGE:S440-5NC4ARS POWER OPTIMIZERS WITH <br />01 SOLAREDGE TECHNOLOGIES LTD. SE5700H-USMNBL75 (240V) INVERTER <br />02 SOLAREDGE TECHNOLOGIES LTD. ENERGY BANK 10 KWH <br />BATTERY BAT-10K1P <br />(01) STRING OF 14 MODULES ARE CONNECTED IN SERIES <br />NOTE- RELOCATE ALL LOADS FROM <br />MAIN PANEL TO BACKUP LOAD PANEL <br /> ELECTRICAL POWER SOURCE DISCONNECT SCHEDULE <br />ENERGY SOURCE <br />UTILITY SERVICE <br />PV SYSTEM <br />DISCONNECT # OF <br />1 OF 2 <br />2 OF 2 <br />DISCONNECTION <br />OPERATION/EQUIPMENT/DEVICE <br />UTILITY - 200A MAIN BREAKER <br />30A UTILITY NON-FUSED AC DISCONNECT <br />D <br />E <br />#8AWG - <br />#10AWG - <br />(2)CU,THWN-2 <br />(1)CU,THWN-2 GND EMT,LFMC OR PVC 3/4''3A <br />Green <br />Building <br />Engineer <br />#832