Laserfiche WebLink
HYD <br />FINISHED FLOOR <br />133.72 <br />P I V <br />FDC <br />OCASA CHARTER SCHOOL <br />GRADING & UTILITY PLANS FOR DP NO. 2025-04R <br />1820 E. FIRST STREET <br />APN: 402-211-08 <br />CITY OF SANTA ANA, CA <br />PROJECT DIRECTORY <br />PROJECT OWNER: <br />RED HOOK CAPITAL PARTNERS <br />2120 E. GRAND AVE., SUITE 135 <br />EL SEGUNDO, CA 90245 <br />SURVEY: <br />BOUNDARY SURVEYING & MAPPING INC. <br />2102 BUSINESS CENTER DRIVE <br />IRVINE, CA 92612 <br />PHONE: (503) 990-4613 <br />RESPONSIBLE CIVIL ENGINEER: <br />RANDY CHAPMAN, P.E. <br />CCE DESIGN ASSOCIATES, INC. <br />771 E. DAILY DRIVE, SUITE 120 <br />CAMARILLO, CA 93010 <br />PHONE: (805) 738-5434 <br />SOILS ENGINEER: <br />GEOTECHNICAL PROFESSIONALS INC. <br />5736 CORPORATE AVENUE <br />CYPRESS, CA 90630 <br />CONTACT: JAMES E. HARRIS <br />PHONE: (714) 220-2211 <br />LANDSCAPE ARCHITECT: <br />MJS LANDSCAPE ARCHITECT <br />507 30TH STREET <br />NEWPORT BEACH, CA 92663 <br />CONTACT: MARK SCHATTINGER <br />PHONE: (949) 675-9964 <br />ARCHITECT: <br />RAFAEL FRANCO & ASSOCIATES, INC. <br />12345 VENTURA BLVD., SUITE H <br />STUDIO CITY, CA 91604 <br />CONTACT: ARTHUR FERNANDEZ <br />PHONE: (818) 754-2030 <br />MEP ENGINEER: <br />TX ENGINEERING <br />112 E AMERIGE AVENUE #131 <br />FULLERTON, CA 92832 <br />CONTACT: THOMAS XU <br />PHONE: (213) 295-5532EARTHWORK CALCULATIONS <br />EARTHWORK QUANTITIES: <br />CUT:700 CUBIC YARDS <br />FILL:475 CUBIC YARDS <br />NET:225 CUBIC YARDS (CUT) <br />NOTE: <br />EARTHWORK QUANTITIES PRESENTED HEREON ARE FOR PERMITTING PURPOSES ONLY, CONTRACTOR IS <br />RESPONSIBLE FOR DETERMINING THEIR OWN EARTHWORK QUANTITIES FOR BIDDING PURPOSES. <br />PROJECT IMPERVIOUS CALCULATIONS <br />PROJECT AREA = 100,201 SF (2.30 AC) <br />EXISTING LANDSCAPE AREA TO REMAIN = 12,082 SF (0.28 AC) <br />PROPOSED LANDSCAPE AREA = 2,581 SF (0.06 AC) <br />TOTAL LANDSCAPE AREA = 14,663 SF (0.34 AC) <br />PRE-CONSTRUCTION IMPERVIOUS AREA = 82,893 SF (1.90 AC) <br />PRE-CONSTRUCTION PERVIOUS AREA = 17,308 SF (0.40 AC) <br />POST-CONSTRUCTION IMPERVIOUS AREA = 85,133 SF (1.95 AC) <br />POST-CONSTRUCTION PERVIOUS AREA = 15,068 SF (0.35 AC) <br />PROJECT SITE <br />E 1ST ST <br />I-5 55 <br />E MAIN ST <br />ZO <br />O <br /> <br />L <br />N <br />CA <br />B <br />R <br />I <br />L <br />L <br />O <br /> <br />P <br />A <br />R <br />K <br /> <br />D <br />R <br />DEMOLITION/CONSTRUCTION CALCULATIONS <br />PERVIOUS CALCULATIONS <br />LANDSCAPE AREA REMOVED = 1,374 SF - REPLACED BY PERVIOUS PLAYGROUND AREA <br />LANDSCAPE AREA REMOVED = 124 SF - REPLACED BY PERVIOUS CONCRETE <br />ASPHALT AREA REMOVED = 1,573 SF - REPLACED BY LANDSCAPE <br />ASPHALT AREA REMOVED = 1,890 SF - REPLACED BY PERVIOUS CONCRETE <br />ASPHALT AREA REMOVED = 1,100 SF - REPLACED BY PERVIOUS PLAYGROUND AREA <br />CONCRETE AREA REMOVED = 124 SF - REPLACED BY PERVIOUS PLAYGROUND AREA <br />CONCRETE AREA REMOVED = 1,008 SF - REPLACED BY LANDSCAPE <br />IMPERVIOUS CALCULATIONS <br />LANDSCAPE AREA REMOVED = 2,077 SF - REPLACED BY CONCRETE/HARDSCAPE <br />LANDSCAPE AREA REMOVED = 113 SF - REPLACED BY ASPHALT <br />ASPHALT AREA REMOVED = 1,937 SF - REPLACED BY CONCRETE/HARDSCAPE <br />CONCRETE AREA REMOVED = 152 SF - REPLACED BY ASPHALT <br />CONCRETE AREA REMOVED = 703 SF - REPLACED BY HARDSCAPE/NEW CONCRETE <br />WQMP CALCULATION: PROJECT SITE CREATES AND/OR REPLACES 4,982 SF OF IMPERVIOUS AREA. <br />Underground Service Alert <br />of Southern California <br />Know what's below. <br />before you dig.Call <br />R <br />DESCRIPTION <br />SHEET INDEX <br />SHEET NAMESHEET NUMBER <br />TITLE SHEET -1 <br />REMOVAL/DEMOLITION PLAN RA014 <br />6 GRADING PLAN GA01 <br />9 EROSION CONTROL PLAN EA01 <br />10 EROSION CONTROL DETAILS ED01 <br />PREPARED UNDER THE SUPERVISION OF: <br />APPROVALS: <br />RANDY A CHAPMAN R.C.E. NO.: C69614 DATE <br />FOR PUBLIC SEWER AND WATER FACILITIES ONLY <br />APPROVED BY: <br />ARMANDO FERNANDEZ, P.E. DATE <br />ACTING DEPUTY PUBLIC WORKS DIRECTOR/ <br />WATER RESOURCES MANAGER <br />PROJECT SITE <br />BENCHMARK NO.: SA-335-06 ELEV.: 132.783' NAVD88 <br />DESCRIBED BY OCS 2006 - FOUND 4" OCS ALUMINUM BENCHMARK DISK STAMPED "SA-335-06", SET IN THE <br />NORTHWEST CORNER OF A 4.0 FT. BY 4.5 FT. CONCRETE CATCH BASIN. MONUMENT IS LOCATED IN THE <br />NORTHEAST PORTION OF THE INTERSECTION OF ELK ST. AND FIRST ST. 45 FT. NORTH OF THE CENTERLINE OF <br />FIRST STREET AND 50 FT. EAST OF THE CENTERLINE OF ELK ST., LEVEL WITH THE SIDEWALK <br />BENCHMARK <br />BEARINGS AND DISTANCES ARE BASED ON THE CENTERLINE OF EAST 1ST AVENUE, FROM CENTERLINE SHOWN <br />HEREIN, BEING N89°41'35"E 739.02' SHOWN IN MM 1005 47-50 AS N89°41'35"W 719.10. <br />BASIS OF BEARING <br />THAT PORTION OF LAND LOCATED WITHIN THE CITY OF SANTA ANA, THE COUNTY OF ORANGE, STATE OF <br />CALIFORNIA, AS DESCRIBED BELOW: <br />PARCEL 1: <br />LOT 2 OF TRACT NO. 24, IN THE CITY OF SANTA ANA, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN <br />ON A MAP RECORDED IN BOOK 9, PAGE 23 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, <br />CALIFORNIA. EXCEPTING THEREFROM THAT PORTION LYING SOUTHWESTERLY OF THE NORTHEASTERLY LINE <br />OF THE LAND DESCRIBED IN A DEED TO THE STATE OF CALIFORNIA, RECORDED DECEMBER 22, 1953 IN BOOK <br />2637, PAGE 506 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM THE NORTHERLY 289.0 FEET OF THE <br />WESTERLY 230.0 FEET OF SAID LOT 2. <br />PARCEL 2: <br />THE PORTION OF LOT 4 OF TRACT NO. 24, AS SHOWN ON A MAP RECORDED IN BOOK 9, PAGE 23 OF <br />MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA, DESCRIBED AS FOLLOWS: <br />BEGINNING AT THE NORTHEASTERLY CORNER OF SAID LOT 4; THENCE ALONG THE EASTERLY LINE THEREOF, <br />SOUTH 0°05'25" WEST 127.56 FEET TO A CURVE, CONCAVE NORTHEASTERLY AND HAVING A RADIUS OF 1,920.00 <br />FEET; THENCE NORTHWESTERLY ALONG SAID CURVE, FROM A TANGENT BEARING NORTH 48°55'49" WEST <br />THROUGH AN ANGLE OF 1°37'24" AN ARC DISTANCE OF 54.40 FEET; THENCE NORTH 33°41'49" WEST 108.19 FEET <br />TO A POINT IN THE NORTHERLY LINE OF SAID LOT 4, DISTANCE WESTERLY THEREON 100.73 FEET FROM SAID <br />NORTHEASTERLY CORNER; THENCE EASTERLY ALONG SAID NORTHERLY LINE, 100.73 FEET TO THE POINT OF <br />BEGINNING. <br />EXCEPTING FROM SAID PARCEL 2, ALL MINERALS, OIL, GASES AND OTHER HYDROCARBONS BY WHATSOEVER <br />NAME KNOWN, THAT MAY BE WITHIN OR UNDER SAID PARCEL 2, WITHOUT, HOWEVER, THE RIGHT TO DRILL, DIG <br />OR MINE THROUGH THE SURFACE OF SAID LAND THEREFOR, AS RESERVED IN THE DEED RECORDED IN BOOK <br />4015, PAGE 522 OF OFFICIAL RECORDS, <br />ALSO EXPECTING FROM PARCELS 1 AND 2 THAT PORTION DESCRIBED AS PARCEL 72559-1 IN THE DEED TO THE <br />STATE OF CALIFORNIA RECORDED JANUARY 31, 1994 AS INSTRUMENT NO. 94-0072254 OF OFFICIAL RECORDS OF <br />SAID ORANGE COUNTY. <br />LEGAL DESCRIPTION <br />CONVERSION OF EXISTING FIVE-STORY OFFICE BUILDING INTO CHARTER SCHOOL. <br />PROJECT SCOPE <br />SOILS ENGINEER CERTIFICATION: <br />I HAVE REVIEWED AND APPROVE THIS GRADING PLAN. IT COMPLIES WITH ALL OF THE <br />REQUIREMENTS AND RECOMMENDATIONS PER GEOTECHNICAL REPORT DATED APRIL <br />25, 2025. <br />SIGNATURE DATE <br />FEMA ZONE X <br />AREA DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN. <br />FLOOD INFORMATION <br />GENERAL NOTES DP012 <br />PROJECT SITE <br />APN: 402-211-08 <br />APN: 402-211-09 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />F <br />R <br />E <br />E <br />W <br />A <br />Y <br />APN: 402-201-05 <br />(E) OFFICE <br />BUILDING <br />GRADING PERMIT NO. 50101547 <br />TOPOGRAPHIC SURVEY MAP TP013 <br />5 HORIZONTAL CONTROL PLAN HP01 <br />7 GRADING DETAILS & SECTIONS GD01 <br />8 UTILITY PLAN UT01 <br />SR #2504895 <br />PUBLIC WORKS AGENCY <br />GRADING & UTILITY PLAN <br />1820 EAST 1ST STREET <br />SANTA ANA, CA 92705 <br />PARCEL APN: 402-211-08 <br />JOB ADDRESS/PARCEL APN <br />REFERENCES <br />IMPROVEMENT PLANS NO. 11670, DATED 08-01-1980 <br />MASONRY WALL PUMP BUILDING PLANS NO. 67780, DATED 07-09-1991 <br />ALTA SURVEY PREPARED BY BOUNDARY SURVEY MAPPING INC., DATED 12-11-2024 <br />1ST STREET <br />PA <br />R <br />K <br /> <br />D <br />R <br />. <br />CA <br />B <br />R <br />I <br />L <br />L <br />O <br />11/6/2025 <br />R. <br />SOILS ENGINEER CERTIFICATION: <br />DATE <br />I HAVE REVIEWED AND APPROVE THIS GRADING PLAN. IT COMPLIES WITH ALL OF THE <br />REQUIREMENTS AND RECOMMENDATIONS PER GEOTECHNICAL REPORT DATED APRIL <br />25, 2025. <br />SIGNATURE <br />R.C.E 91562 11-6-2025 <br />11/25/25 <br />Behrooz Sarlak 12/15/2025