GRADING GENERAL NOTES <br />1.ALL GRADING SHALL COMPLY WITH THE LATEST CBC CHAPTERS 18 AND 33, AND APPENDIX J AND THE SANTA ANA MUNICIPAL <br />CODE. A CITY GRADING PERMIT IS REQUIRED FOR GRADING. <br />2.GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY GRADING INSPECTOR. A PRE-GRADING MEETING ON <br />THE SITE IS REQUIRED BEFORE STARTING OF GRADING WITH THE FOLLOWING PEOPLE PRESENT: GRADING CONTRACTOR, <br />DESIGN CIVIL ENGINEER, GEOTECHNICAL ENGINEER, GRADING INSPECTOR AND WHEN REQUIRED, THE ARCHAEOLOGIST AND <br />PALEONTOLOGIST. THE REQUIRED INSPECTIONS FOR GRADING WILL BE EXPLAINED AT THIS MEETING. <br />3.AN APPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. <br />4.THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO VERIFY COMPLIANCE WITH THE PLANS, <br />SPECIFICATIONS, CODE AND ANY SPECIAL CONDITIONS OF THE PERMIT WITHIN HIS PURVIEW. <br />5.THE GEOTECHNICAL ENGINEER SHALL PERFORM PERIODIC INSPECTIONS AND SUBMIT A COMPLETE REPORT AND MAP UPON <br />COMPLETION OF THE ROUGH GRADING. THE COMPACTION REPORT AND APPROVAL FROM THE GEOTECHNICAL ENGINEER <br />SHALL INDICATE THE TYPE OF FIELD TESTING PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH THE METHOD OF OBTAINING <br />THE IN-PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING, AND SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT <br />MAXIMUM DENSITY DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF THE MAXIMUM DENSITY CURVES BY <br />THE FIELD TECHNICIAN. <br />6.CUT AND FILL SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1) EXCEPT WHERE <br />SPECIFICALLY APPROVED OTHERWISE. <br />7.FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90% RELATIVE DENSITY. AGGREGATE BASE FOR ASPHALTIC <br />AREAS SHALL BE COMPACTED TO MINIMUM OF 95% RELATIVE DENSITY. MAXIMUM DENSITY SHALL BE DETERMINED BY UNIFORM <br />BUILDING CODE STANDARD NO. 70-1 OR APPROVED EQUIVALENT, AND FIELD DENSITY BY UNIFORM CODE STANDARD NO. 70-2 <br />OR APPROVED EQUIVALENT. <br />8.THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET OR MORE WITHOUT THE NECESSARY PERMIT <br />FROM THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY. <br />9.ALL CUT SLOPES SHALL BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE GEOTECHNICAL ENGINEER TO <br />DETERMINE IF ANY SLOPE STABILITY PROBLEM EXISTS. SHOULD EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS OR <br />POTENTIAL GEOLOGICAL HAZARDS, THE GEOTECHNICAL ENGINEER SHALL SUBMIT A RECOMMENDED TREATMENT TO THE CITY <br />ENGINEER FOR APPROVAL. <br />10.THE PERMITTEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER ACTIVE SITES AT LEAST TWICE DAILY. <br />11.THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE RESPONSIBILITY OF THE PERMITTEE. <br />12.GRADING OPERATIONS, INCLUDING MAINTENANCE OF EQUIPMENT, WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE OF HUMAN <br />OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 8:00 P.M. AND 7:00 A.M. ON WEEKDAYS, INCLUDING <br />SATURDAY, OR ANY TIME ON SUNDAY OR A FEDERAL HOLIDAY. (CITY OF SANTA ANA MUNICIPAL CODE SECTION 18-314) <br />13.THE PERMITTEE SHALL GIVE REASONABLE NOTICE TO THE OWNER OF ADJOINING LANDS AND BUILDINGS PRIOR TO <br />BEGINNING EXCAVATIONS, WHICH MAY AFFECT THE LATERAL AND SUBJACENT SUPPORT OF THE ADJOINING <br />PROPERTY. THE NOTICE SHALL STATE THE INTENDED DEPTH OF EXCAVATION AND WHEN EXCAVATION COMMENCES. THE <br />ADJOINING OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS ON THE PERMITTED PROPERTY TO <br />PROTECT HIS STRUCTURE, IF HE SO DESIRES, UNLESS OTHERWISE PROTECTED BY LAW. <br />14.ALL EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN OPEN TO HANDLE THE STORM WATER; HOWEVER, IN <br />ANY CASE, THE PERMITTEE SHALL BE HELD LIABLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. <br />15.APPROVED EROSION PROTECTION DEVICES SHALL BE PROVIDED AND MAINTAINED DURING THE RAINY <br />SEASON AND SHALL BE IN PLACE AT THE END OF EACH DAY'S WORK. PROPER EROSION CONTROL MEASURES MUST BE SHOWN ON <br />THE PLANS. <br />16.CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY <br />WASTES OR POLLUTANTS OFF THE SITES. <br />DISCHARGES OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR PERFORMANCE AND <br />COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER <br />QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS <br />SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR 117 AND 302. <br />POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, <br />SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES <br />OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC RADIATOR OR BATTERY FLUIDS; FERTILIZERS, <br />VEHICLES/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES <br />FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING; AND SUPERCHLORINATED POTABLE WATER LINE <br />FLUSHINGS. <br />DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED TEMPORARY AREA <br />ON-SITE, PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH <br />LOCAL, STATE, AND FEDERAL REQUIREMENTS. <br />17.DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS <br />PROHIBITED. DEWATERING OF NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE <br />ELIMINATION SYSTEM (NPDES) PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD. <br />18.ALL DIRT, SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC STREETS DURING ANY GRADING, HAULING, OR <br />EXPORT OPERATIONS SHALL BE IMMEDIATELY CLEANED UP BY THE DEVELOPER, HIS CONTRACTOR, SUBCONTRACTORS, OR <br />AGENTS TO THE SATISFACTION OF THE CITY ENGINEER. FAILURE TO DO SO WILL BE CAUSE FOR STOPPING ALL SUCH GRADING, <br />HAULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS THE STREETS ARE CLEANED. <br />19.ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED OR SHOULD MAINTAIN A LEAST <br />TWO FEET OF FREEBOARD IN ACCORDANCE WITH THE REQUIREMENTS OF CVC SECTION 23114. <br />20.CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES TO PUBLIC PROPERTIES THAT ARE CAUSED BY THE <br />WORK ON-SITE. REPAIR MUST BE COMPLETED TO THE SATISFACTION OF THE CITY ENGINEER. <br />21.MINIMUM ASPHALT PAVEMENT SECTIONS SHALL BE: <br />·3”AC/6”AB - PARKING AISLES <br />·4”AC/8”AB - DRIVES [COMMERCIAL] <br />·4”AC/12”AB - DRIVES [INDUSTRIAL] <br />·3” A.C. OVER 4” A.B. - PARKING STALLS [MULTI-FAMILY] <br />·3” A.C. OVER 8” A.B. - DRIVE AISLES [MULTI-FAMILY] <br />22.EARTHWORK VOLUMES: <br />CUT 700 CUBIC YARDS FILL 475 CUBIC YARDS NET 225 CUBIC YARDS <br />23.IF THE NET VOLUMES EXCEED 500 CUBIC YARDS, THE CONTRACTOR MUST SUBMIT A HAUL TRUCK ROUTE TO THE CITY FOR <br />APPROVAL. HAUL ROUTE SHALL INCLUDE THE LOCATION OF BORROW AND/OR DISPERSAL SITE, ALL STREETS INCLUDED IN THE <br />ROUTE, THE PROPOSED STAGING AREA AND THE MAXIMUM GROSS WEIGHT OF THE TRUCKS WHEN LOADED. <br />24.SUBMIT AN 8 ½” X 11” HAUL ROUTE MAP OF APPROPRIATE SCALE WHICH INDICATES THE LOCATION OF THE PROJECT SITE, <br />SHOWING STREETS AND DIRECTION OF HAULING UP TO AND INCLUDING THE END OF THE ROUTE. <br />25.PURSUANT TO ASSEMBLY BILL 3019, NO EXCAVATION PERMIT IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS <br />AN INQUIRY I.D. NUMBER FROM “UNDERGROUND SERVICE ALERT” (1-800-422-4133) AT LEAST TWO WORKING DAYS PRIOR TO <br />COMMENCING EXCAVATION. <br />26.SEPARATE PERMITS MUST BE OBTAINED FROM THE CITY BUILDING AND SAFETY DIVISION FOR THE CONSTRUCTION OF <br />RETAINING WALLS, LIGHT POLES, TRASH ENCLOSURES, ON-SITE PLUMBING AND ALL BUILDING STRUCTURES. <br />27.ALL FONTS ON PLANS SHOULD BE A MINIMUM OF 0.1”. <br />WATER GENERAL NOTES <br />1.CONSTRUCTION AND INSTALLATION OF ALL WATER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH <br />THE CITY OF SANTA ANA STANDARD PLANS AND SPECIFICATIONS. WHERE THE STANDARD PLANS ARE SILENT, <br />CONSTRUCTION AND INSTALLATION OF WATER MAINS AND APPURTENANCES SHALL CONFORM TO THE AMERICAN <br />WATER WORKS ASSOCIATION (AWWA) SPECIFICATIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS <br />CONSTRUCTION, 2012 EDITION. <br />2.CONSTRUCTION OF WATER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED <br />CONTRACTORS WITH A VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE. <br />3.NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF <br />CALIFORNIA AS A WATER DISTRIBUTION OPERATOR, SHALL BE ALLOWED TO OPERATE THE CITY'S WATER SYSTEM <br />VALVES. <br />4.NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF <br />CALIFORNIA AS A WATER DISTRIBUTION OPERATOR, SHALL SHUT WATER SERVICE OFF TO ANY CUSTOMER. <br />5.PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE CITY FOR REVIEW AND <br />APPROVAL "DISINFECTION AND FLUSHING PLAN" PER THE CITY OF SANTA ANA DESIGN GUIDELINES AND <br />STANDARD DRAWINGS. <br />6.ALL NEWLY CONSTRUCTED WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND TESTED IN <br />ACCORDANCE WITH AMERICAN WATER WORKS ASSOCIATION STANDARD C600'S, PRIOR TO CONNECTING TO THE <br />CITY'S WATER DISTRIBUTION SYSTEM. DISINFECTION TESTING RESULTS SHALL BE SUBMITTED TO THE WATER <br />RESOURCES DIVISION WHEN REQUIRED FOR REVIEW AND APPROVAL PRIOR TO CONNECTING TO THE CITY'S <br />WATER DISTRIBUTION SYSTEM. <br />7.WATER MAINS WILL BE HYDROSTATIC TESTED AT 200 PSI FOR 2 HOURS. NEW WATER MAINS CANNOT BE TEST <br />AGAINST AN EXISTING VALVE BUT CAN BE TESTED USING A TEST PLATE. <br />8.REQUESTS TO SHUT-DOWN THE WATER DISTRIBUTION SYSTEM FOR TIE-INS OR OTHER PURPOSES SHALL BE <br />COORDINATED WITH THE WATER RESOURCES DIVISION STAFF AT LEAST 2 WEEKS IN ADVANCE THROUGH THE <br />CITY INSPECTOR. ALL CUSTOMERS AFFECTED BY THE PROPOSED SHUTDOWN SHALL BE NOTIFIED IN WRITING 48 <br />HOURS IN ADVANCE BY THE CONTRACTOR. <br />9.THE CITY OF SANTA ANA WATER RESOURCES DIVISION CANNOT GUARANTEE A COMPLETE SHUTDOWN OF <br />EXISTING MAINS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND ISOLATION OF <br />CONSTRUCTION FOR TESTING OR ANY OTHER PURPOSES. <br />10.ALL FIRE HYDRANTS WHICH ARE OUT OF SERVICE OR NEW FIRE HYDRANTS WHICH HAVE NOT BEEN ACCEPTED <br />FOR SERVICE SHALL BE COVERED WITH A SACK INDICATING THAT THE HYDRANTS ARE NOT IN SERVICE. <br />11.MAINTAINING WATER SERVICE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR ANY SHUTDOWN <br />LASTING LONGER THAN FOUR (4) HOURS. METHOD OF PROVIDING TEMPORARY SERVICE MUST BE APPROVED BY <br />THE WATER RESOURCES DIVISION. THE WATER SHALL BE SAFE FOR DRINKING IN ACCORDANCE WITH STATE OF <br />CALIFORNIA WATER RESOURCES CONTROL BOARD (SWRCB) DRINKING WATER PROGRAM (DWP). <br />12.WATER METER WILL NOT BE INSTALLED NOR WATER TURNED ON UNTIL THE BACKFLOW DEVICES REQUIRED FOR <br />THE BUILDING AND IRRIGATION SYSTEMS HAVE BEEN INSTALLED, TESTED, APPROVED, AND CERTIFIED, AND <br />APPROVED AND SIGNED OFF BY THE CITY. CONTACT WATER RESOURCES DIVISION AT 714-647-3320. <br />13.ALL WATER MAINS SHALL BE AWWA C-900 PVC, DR14 PIPE OR AWWA C-151 DUCTILE IRON PIPE. ALL OTHER PIPE <br />MATERIALS REQUIRE SPECIAL REVIEW AND APPROVAL FROM THE WATER RESOURCES DIVISION. <br />14.WATER MAINS SHALL HAVE 36" MINIMUM COVER TO FINISHED GRADE. ANY DEVIATION FROM THIS REQUIREMENT <br />REQUIRES APPROVAL FORM THE WATER RESOURCES DIVISION. <br />15.CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES AND POINTS OF CONNECTION PRIOR TO <br />TRENCHING. <br />16.PRIVATE WATER APPURTENANCES SUCH AS BACKFLOW PREVENTORS, FIRE HYDRANTS AND STANDPIPES, AND <br />VALVES SHALL BE PAINTED AS FOLLOWS: <br />16.1.DOMESTIC WATER:BLUE <br />16.2.POTABLE IRRIGATION:GREEN <br />16.3.RECYCLED IRRIGATION:PURPLE <br />16.4.FIRE PROTECTION:OSHA SAFETY RED <br />17.DO NOT CUT OR SNAP CUT OR MILL ASBESTOS CEMENT PIPE. WHERE JOINING EXISTING ASBESTOS CEMENT PIPE, <br />EXPOSE SIX FEET IN EACH DIRECTION, LOOKING FOR THE NEAREST JOINT AND JOIN TO NEW PIPE WITH A <br />PROPERLY DIMENSIONED ADAPTER PER STANDARD PLAN 1443. <br />18.DO NOT TAP EXISTING MAINS WITHOUT THE PRESENCE OF A CERTIFIED WATER INSPECTOR. PRESSURE TEST <br />TAPPING SLEEVE IN THE PRESENCE OF A CERTIFIED WATER INSPECTOR BEFORE TAPPING EXISTING MAIN. <br />19.FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FILE ARE <br />DELIVERED TO AND ACCEPTED BY THE CITY'S INSPECTOR. SHOW ALL FIELD CHANGES ON RECORD DRAWINGS. <br />20.TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT AND SHALL BE NON-SKID. <br />21.WHEN PUBLIC WATER FACILITIES ARE LOCATED ON PRIVATE PROPERTY, EASEMENT DOCUMENTS ARE TO BE <br />SUBMITTED TO CITY FOR APPROVAL PRIOR TO A PERMIT BEING ISSUED. <br />22.ALL RECYCLED WATER PROJECTS REQUIRE REVIEW AND APPROVAL BY THE WATER RESOURCES DIVISION. <br />23.REMOVE FROM THE FIELD UPPER AND LOWER FIRE HYDRANT DRY BARREL AND 24"X36" IRON VAULT LID COVERS <br />AND DELIVER UNDAMAGED TO THE CITY WATER RESOURCES DIVISION YARD LOCATED AT 215 S. CENTER STREET. <br />PRIOR NOTIFICATION OF THE DELIVERY IS REQUIRED AT 714-647-3320. <br />24.WATER MAIN FITTINGS SHALL BE FLANGE OR MECHANICAL JOINTS ONLY, NO PUSH-ON JOINT FITTINGS ALLOWED. <br />25.CONTRACTOR SHALL NO REMOVE OR DISPOSE EXISTING WATER METERS. CONTRACTOR SHALL APPLY FOR AN <br />ABANDON WATER METER APPLICATION. CONTRACTOR SHALL CONTACT WATER RESOURCES DIVISION AT <br />714-647-3320 FOR EXISTING METER REMOVALS. <br />26.INSTALLATION OF NEW WATER METER SERVICE CURB STOP SHALL BE DONE AFTER INSPECTION OF NEW CURB <br />AND GUTTER OR AFTER CONTRACTOR HAS ESTABLISHED THE PROPOSED CURB GRADE BY STAKING OF THE <br />PROPOSED CURB. <br />PUBLIC WORKS AGENCY <br />REVISIONS REFERENCES <br />Underground Service Alert <br />of Southern California <br />Know what's below. <br />before you dig.Call <br />R <br />SEWER GENERAL NOTES <br />1.CONSTRUCTION AND INSTALLATION OF ALL SEWER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH <br />THE CITY OF SANTA ANA STANDARD PLANS AND SPECIFICATIONS. WHERE THE STANDARD PLANS ARE SILENT, <br />CONSTRUCTION AND INSTALLATION OF SEWER MAINS AND APPURTENANCES SHALL CONFORM TO THE STANDARD <br />SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 2012 EDITION. <br />2.CONSTRUCTION OF SEWER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED <br />CONTRACTORS WITH A VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE. <br />3.ALL NEWLY CONSTRUCTED SEWER MAINS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH <br />STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. ALL NEWLY CONSTRUCTED SEWER MAINS, <br />LATERALS AND MANHOLES MUST BE INSPECTED VIA CLOSED CIRCUIT TELEVISION CAMERA BY A NATIONAL <br />ASSOCIATION OF SEWER SERVICE COMPANIES (NASSCO) CERTIFIED TECHNICIAN AND VIDEO SUBMITTED IN A <br />DIGITAL FORMAT TO THE WATER RESOURCES DIVISION FOR REVIEW AND FINAL ACCEPTANCE OF WORK. <br />4.ALL SEWER MAINS SHALL BE VITRIFIED CLAY PLAY (VCP) OR PVC SDR-26 PIPE. ALL OTHER PIPE MATERIALS <br />REQUIRE SPECIAL REVIEW AND APPROVAL FROM THE WATER RESOURCES DIVISION. <br />5.TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT AND SHALL BE NON-SKID. <br />6.CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES AND POINTS OF CONNECTION PRIOR TO <br />TRENCHING. <br />7.WHEN PUBLIC SEWER FACILITIES ARE LOCATED ON PRIVATE PROPERTY, EASEMENT DOCUMENTS ARE TO BE <br />SUBMITTED TO CITY FOR APPROVAL PRIOR TO A PERMIT BEING ISSUED. <br />8.FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FORMAT ARE <br />DELIVERED TO AND ACCEPTED BY THE CITY'S INSPECTOR. SHOW ALL FIELD CHANGES ON RECORD DRAWINGS. <br />9.ALL SEWER REPAIRS SHALL BE ACCOMPLISHED USING STAINLESS STEEL DOUBLE BANDED COUPLINGS. <br />EROSION AND SEDIMENT CONTROL <br />1.ALL WORK SHALL BE IN ACCORDANCE WITH THE EROSION CONTROL PLANS, THE PROJECT'S STORM WATER <br />POLLUTION PREVENTION PLAN (SWPPP), AND THE RECOMMENDATION OF SOILS REPORT. <br />2.EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE DAILY <br />RAINFALL PROBABILITY EXCEEDS 40%. <br />3.EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY <br />SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO <br />FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL DEVICES AT ALL TIMES. <br />4.CONTROLS SHALL BE SET UP AND MAINTAINED AS CONSTRUCTION PROCEEDS. ADJUSTMENTS TO THE EROSION <br />CONTROL PLANS ARE ALLOWABLE AS REQUIRED AND APPROVED BY CITY. <br />5.ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL IMPLEMENT STRUCTURAL AND NONSTRUCTURAL BEST <br />MANAGEMENT PRACTICES (BMPS) IN CONFORMANCE WITH THE GUIDELINES OF THE CALIFORNIA STORM WATER <br />BMP HANDBOOKS. <br />6.AFTER A RAINSTORM, ALL SEDIMENT AND DEBRIS SHALL BE REMOVED FROM STREETS, BERMS AND DESILTING <br />BASINS, ANY GRADE SLOPE SURFACE PROTECTION MEASURES DAMAGED DURING A RAINSTORM SHALL BE <br />IMMEDIATELY REPAIRED. <br />7.THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO <br />PREVENT TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATED A HAZARDOUS CONDITION. <br />GENERAL NOTES <br />Behrooz Sarlak 12/15/2025