Laserfiche WebLink
CITY OF SANTA ANA <br />v_o <br />TABLE R602.3(1) <br />FASTENING SCHEDULE <br />ITEM <br />DESCRIPTION OF BUILDING ELEMENTS <br />NUMBER AND a bPE <br />OF FASTENER <br />SPACING AND LOCATION <br />FLOOR <br />4-8d box (22" x 0.113"); or <br />21 <br />Joist to sill, top plate or girder <br />3-8d common (22" x 0.131"); or3-1Od box (3" x 0.128"); or <br />Toe nail <br />3-3" x 0.131" nails <br />8d box (22" x 0.113") <br />4" o.c. toe nail <br />22 <br />Rim joist, band joist or blocking to sill or top <br />8d common (22" x 0.131"); or <br />plate (roof applications also) <br />10d box (3" x 0.128"); or <br />6" o.c. toe nail <br />3" x 0.131" nails <br />3-8d box (22" x 0.113"); or <br />23 <br />1" x 6" subfloor or less to each joist <br />2-8d common (22" x 0.131"); or3-10d box (3" x 0.128"); or <br />Face nail <br />2 staples, 1" crown, 16 ga., 1j" long <br />24 <br />„ <br />2 subfloor to joist or girder <br />3-16d box (32" x 0.135"); or <br />2-16d 32" 0.162" <br />Blind and face nail <br />common x <br />25 <br />2" planks (plank & beam - floor & roof) <br />3-16d box (32" x 0.135"); or1» <br />2-16d (32 0.162") <br />At each bearing, face nail <br />common x <br />3-16d common (32" x 0.162") <br />4-10 box (3" x 0.128"), or <br />26 <br />Band or rim joist to joist <br />4-3" x 0.131" nails; or <br />End nail <br />4-3" x 14 ga. staples, i" crown <br />Nail each layer as follows: <br />20d common (4" x 0.192"); or <br />32" o.c. at top and <br />bottom and staggered. <br />10d box (3" x 0.128"); or <br />24" o.c. face nail at top <br />3" x 0.131" nails <br />and bottom staggered on <br />27 <br />Built-up girders and beams, 2-inch lumber layers <br />opposite sides <br />And: <br />2-20d common (4" x 0.192"); or <br />Face nail at ends and <br />3-10d box (3" x 0.128"); or <br />at each splice <br />3-3" x 0.131" nails <br />4-16d box (31' x 0.135"); or <br />28 <br />Ledger strip supporting joists or rafters <br />3-16d common (3j" x 0.162"); or <br />4-10d box (3" x 0.128"); or <br />At each joist or <br />rafter, face nail <br />4-3" x 0.131" nails <br />29 <br />Bridging to joist <br />2-10d (3" x 0.128") <br />Each end, toe nail <br />SPACING OF FASTENERS <br />ITEM <br />DESCRIPTION OF <br />NUMBER AND a b, c <br />Edges <br />Intermediate <br />BUILDING ELEMENTS <br />TYPE OF FASTENER <br />g h <br />(inches) <br />supports <br />(inches) <br />WOOD STRUCTURAL PANELS, SUBFLOOR, ROOF AND INTERIOR WALL SHEATHING TO FRAMING <br />AND PARTICLEBOARD WALL SHEATHING TO FRAMING <br />[SEE TABLE R602.3(3) FOR WOOD STRUCTURAL PANEL EXTERIOR WALL SHEATHING TO WALL FRAMING] <br />30 <br />3" Ills <br />6d common (2" x 0.113") nail (subfloor, wall)' <br />6 <br />12' <br />8 2 <br />8d common (2j" x 0.131") nail (roof) <br />31 <br />32" - 1" <br />8d common nail (22" x 0.131") <br />6 <br />12' <br />32 <br />11" 1Il" <br />$ <br />10d common (3" x 0.148") nail; or <br />6 <br />12 <br />8d (22" x 0.131") deformed nail <br />Other wall sheathing9 <br />33 <br />2" structural cellulosic fiberboard sheathing <br />12 galvanized roofing nail, 16 head diameter, <br />3 <br />6 <br />or 1" crown staple 16 ga., 1" long <br />34 <br />32" structural cellulosic fiberboard sheathing <br />1j" galvanized roofing nail, 16 head diameter, <br />3 <br />6 <br />or 1" crown staple 16 ga., 1J" long <br />35 <br />„ <br />2 sheathings <br />12" galvanized roofing nail; staple galvanized, <br />7 <br />7 <br />gypsum <br />12" long; 14" screws, Type W or S <br />36 <br />8" sheathings <br />1J" galvanized roofing nail; staple galvanized, <br />7 <br />7 <br />gypsum <br />18 long screws, Type W or S <br />Wood structural panels, combination subfloor underlayment to framing <br />6d deformed (2„ x 0.120;") nail; or <br />37" <br />and less <br />8d common (22 x 0.131) nail <br />6 <br />12 <br />38" <br />- Ills <br />8d common (22" x 0.131") nail; or <br />6 <br />12 <br />8d deformed (21' x 0.120") nail <br />39 <br />10d common (3" x 0.148" ) nail; or <br />6 <br />12 <br />8d deformed (22" x 0.120") nail <br />TABLE R602.3(1) <br />FASTENING SCHEDULE <br />ITEM <br />DESCRIPTION OF BUILDING ELEMENTS <br />NUMBER AND a bPE <br />OF FASTENER <br />SPACING AND LOCATION <br />WALL <br />16d common (32" x 0.162") <br />24" o.c. face nail <br />8 <br />Stud to stud (not at braced wall panels) <br />10d box (3 x 0.128» ); or <br />„ <br />3" x 0.131" nails <br />16 o.c. face nail <br />Stud to stud and abutting studs at intersecting <br />16d box (32" x 0.135"); or <br />3" x 0.131" nails <br />12" o.c. face nail <br />9 <br />wall corners (at braced wall panels) <br />16d common (32" x 0.162") <br />16" o.c. face nail <br />16d common (32" x 0.162") <br />16" o.c. each edge face nail <br />10 <br />Built-up header (2" to 2" header with 1/2" spacer) <br />16d box (32" x 0.135") <br />12" o.c. each edge face nail <br />5-8d box (22" x 0.113"); or <br />11 <br />Continuous header to stud <br />4-8d common (22" x 0.131"); or <br />Toe nail <br />4-10d box (3" x 0.128") <br />16d common (32" x 0.162") <br />16" o.c. face nail <br />12 <br />Top plate to top plate <br />10d box (3" x 0.128"); or <br />„ <br />12 face <br />3" x 0.131" nails <br />o.c. nail <br />Double top plate splice for SDCs A-D2 with <br />8-16d common (32" x 0.162"); or <br />seismic braced wall line spacing < 25' <br />12-16d box (32" x 0.135"); or <br />12-10d box (3" x 0.128"); or <br />Face nail on each side of end <br />13 <br />12-3" x 0.131" nails <br />joint (minimum 24" lap splice <br />length each side of end joint) <br />Double top plate splice SDCs Do, D1 , or D2 ; <br />1 <br />12-16d (3" x 0.135") <br />and braced wall line spacing >_25' <br />2 <br />16d common (32" x 0.162") <br />16" o.c. face nail <br />14 <br />Bottom plate to joist, rim joist, band joist or <br />16d box (32" x 0.135"); or <br />blocking>, <br />panels) <br />(not at braced wall p ) <br />3" 0.131" <br />12 o.c. face nail <br />x nails <br />Bottom plate to joist, rim joist, band joist or <br />3-16d box (32" x 0.135"); or <br />1» <br />3 each 16" o.c. face nail <br />15 <br />blocking (at braced wall panel) <br />2-16d common (32 x 0.162); or <br />2 each 16" o.c. face nail <br />4-3" x 0.131" nails <br />4 each 16" o.c. face nail <br />4-8d box (22 " x 0.113"); or <br />3-16d box (3j" x 0.135"); or <br />4-8d common (22" x 0.131"); or <br />Toe nail <br />4-1Od box (3" x 0.128"); or <br />4-3" x 0.131" nails <br />16 <br />Top or bottom plate to stud <br />1 <br />3-16d box (32„ x 0.135» ); or <br />2-16d common (32" x 0.162"); or <br />End nail <br />3-1Od box (3" x 0.128"); or <br />3-3" x 0.131" nails <br />3-10d box (3" x 0.128"); or <br />17 <br />Top plates, laps at corners and intersections <br />2-16d common (32" x 0.162"); or <br />Face nail <br />3-3" x 0.131" nails <br />3-8d box (22" x 0.113"); or <br />18 <br />1" brace to each stud and plate <br />2-8d common (22" x 0.131"); or2-1Od box (3" x 0.128"); or <br />Face nail <br />2 staples 14" <br />3-8d box (22" x 0.113"); or <br />19 <br />1"x 6" sheathing to each bearing <br />2-8d common (22" x 0.131"); or <br />2-1 Od box (3 X 0.128 ); or <br />Face nail <br />2 staples, 1" crown, 16 ga., 13" long <br />3-8d box (22" x 0.113"); or <br />3-8d common (22" x 0.131"); or <br />3-10d box (3" x 0.128"); or <br />3 staples, 1" crown, 16 ga., 1i" long <br />20 <br />1"x 8" and wider sheathing to each bearing <br />Face nail <br />Wider than 1" x 8" <br />4-8d box (22" x 0.113"); or <br />3-8d common (22" x 0.131"); or <br />3-1Od box (3" x 0.128"); or <br />4 staples, 1" crown, 16 ga., 1j" long <br />#4 DOWELS @ 36" oc, <br />12" TO (N) & 6"TO (E) <br />FOOTING W/ SET EPDXY <br />CONT. SPEC. INSP. REQ'D <br />(E) 2x STUDS ® 16"oc <br />4x POST <br />(N) SLAB (N) 5/8" 0 ANCHOR PER SHR <br />"A34" CLIP PER PLAN WALL W/ 10" MIN EMBEDMENT <br />2 SIDES BELOW TOP OF SLAB EPXOY <br />TO PLATE TO (E) FOOTING W/ SIMPSON <br />EPDXY SET ET-22. <br />x <br />III= I=11 <br />o z 2" (E) FOOTING <br />NEW SLAB PER PLAN I (E) FOOTING <br />POST AT CONTINUOUS FOOTING J ANCHOR TO EXISTING FOUNDATION <br />SHEAR WALL SHEAR WALL AT SHEAR WALL <br />PER PLAN PANELS AROUND OPENING PER PLAN <br />\ <br />HDR/BM 3 <br />SHEAR WALL OPENING <br />\\ i <br />3 <br />x <br />i\ <br />i <br />i <br />1. 2x STUDS @ 16" OC <br />2. 2x BLOCKING ALONG ENTIRE LENGTH OF STRAP. 5 <br />3. SIMPSON CS14 STRAP ON ENTIRE LENGTH OF SHEAR WALL. <br />4. PLYWOOD SHEAR WALL PER PLAN, APPLY AT EACH SIDE OF <br />WINDOW AND ALSO AT ABOVE AND BELOW WINDOW OPENING. <br />U 5. SILL FLAIL NAILING OR BOL I ING PER SHEAR WALL SCHEDULE. <br />6. HOLD-DOWN PER PLAN. <br />L <br />D <br />D <br />i) <br />TABLE R602.3(1) <br />FASTENING SCHEDULE FOOTNOTES <br />a. Nails are smooth -common, box or deformed shanks except where otherwise stated. Nails used for fra ing and sheathing <br />connections shall have minimum average bending yield strengths as shown: 80 ksi for shank diameter of 0.192 inch (20d <br />common nail), 90 ksi for shank diameters larger than 0.142 inch butnot larger than 0.177 inch, and 10 ksi for shank Ap <br />diameters of 0.142 inch or less. b. Staples are 16 gage wire and have a minimum 7/16-inch on diameter crown width. FOR PER <br />c. Nails shall be spaced at not more than 6 inches on center at all supports where spans are 48 inches pr greater. <br />d. Four -foot by 8-foot or 4-foot by 9-foot panels shall be applied vertically. <br />e. Spacing of fasteners not included in this table shall be based on Table R602.3(2). Master ID: <br />f. Where the ultimate design wind speed is 130 mph or less, nails for attaching wood structural panel roo s athi g to gable end <br />wall framing shall be spaced 6inches on center. Where the ultimate design wind speed is greater than 1 0 I$ for <br />attaching panel roof sheathing to intermediate supports shall be spaced 6 inches on center for minimu 48-inch distance from <br />ridges, eaves and gable end walls; and 4 inches on center to gable end wall framing. <br />g. Gypsum sheathing shall conform to ASTM C1396 and shall be installed in accordance with GA 253. Fiberboard sheathing shall <br />conform to ASTM C208. <br />h. Spacing of fasteners on floor sheathing panel edges applies to panel edges supported by framing members and required blocking <br />and at floor perimeters only. Spacing of fasteners on roof sheathing panel edges applies to panel edges supported by framing <br />members and required blocking. Blocking of roof or floor sheathing panel edges perpendicular to the framing members need not <br />be provided except as required by other provisions of this code. Floor perimeter shall be supported by framing members or solid <br />blocking. <br />i. Where a rafter is fastened to an adjacent parallel ceiling joist in accordance with this schedule, provide two toe nails on one <br />side of the rafter and toe nails from the ceiling joist to top plate in accordance with this schedule. The toe nail on the <br />opposite side of the rafter shall not be required. <br />TABLE R602.3(1) <br />FASTENING SCHEDULE <br />ITEM <br />DESCRIPTION OF BUILDING ELEMENTS <br />NUMBER AND a bPE <br />OF FASTENER <br />SPACING AND LOCATION <br />ROOF <br />4-8d <br />box (22" x 0.113"); or <br />1 <br />Blocking between ceiling joists or rafters to top plate <br />3-8d <br />3-10d <br />common (22" x 0.131 "); or <br />box (3 x 0.128» ); or <br />Toe nail <br />3-3" <br />x 0.131" nails <br />4-8d <br />box (22" x 0.113"); or <br />2 <br />Ceiling joists to top plate <br />3-8d <br />3-10d <br />common (22" x 0.131"); or <br />box (3 x 0.128 ); or <br />Per joist, toe nail <br />3-3" <br />x 0.131" nails <br />Ceiling joist not attached to parallel rafter, laps <br />4-10d <br />box (3" x 0.128"); or <br />3 <br />over partitions [see Sections R802.3.1, R802.3.2 <br />3-16d <br />common (32" x 0.162"); or <br />Face nail <br />and Table R802.5.1(9)] <br />4-3" <br />x 0.131" nails <br />Ceiling joist attached to parallel rafter (heel joint) <br />4 <br />[see Sections R802.3.1 and R802.3.2 and Table <br />Table <br />R802.5.1(9) <br />Face nail <br />R802.5.1(9)] <br />5 <br />Collar tie to rafter, face nail or 1" x 20 ga. <br />4-10d <br />3-10d <br />box (3" x 0.128"); or <br />common (3" x 0.148"); or <br />Face nail each rafter <br />ridge strap to rafter <br />4-3" <br />x 0.131" nails <br />3-16d <br />box nails (32" x 0.135"); or <br />2 toe nails on one side and <br />6 <br />Rafter or roof truss to plate <br />3-1Od <br />common nails (3" x 0.148"); or <br />1 toe nail on opposite side <br />4-1Od <br />box (3 x 0.128 ); or <br />of each rafter or truss' <br />4-3" <br />x 0.131" nails <br />4-16d <br />(32" x 0.135"); or <br />3-1Od <br />common (32" x 0.148"); or <br />4-1Od <br />box (3" x 0.128"); or <br />Toe nail <br />Roof rafters to ridge, valley or hip rafters or roof <br />4-3" <br />x 0.131" nails <br />7 <br />rafter to minimum 2" ridge beam <br />3-16d <br />box (32" x 0.135"); or <br />2-16d <br />common (32" x 0.162"); or <br />End nail <br />3-10d <br />box (3" x 0.128"); or <br />3-3" <br />x 0.131" nails <br />HOLDOWN <br />MODEL <br />ANCHOR <br />DIA. <br />MIN. EDGE <br />DIST. <br />MIN. EMBED. <br />DEPTH <br />HOLE <br />DIAMETER <br />STUD <br />BOLTS <br />SIMPSON <br />EPDXY ET-22 <br />SIMP. HDU2 <br />SSTB16 OR <br />5/8" THREADED ROD <br />1 <br />10" <br />5/8" + 1/16" <br />6-SDS3 <br />L.A. R.R. <br />SIMP. HDU4 <br />5/8" THREAD DR ROD <br />1 <br />12" <br />5/8" + 1/16" <br />10-SDS3 <br />#25185 <br />NEW 4 x 4 POST <br />AS PER PLAN <br />BP 5/8 BEARING - <br />PLATE LARR #25293 <br />P.T. SILL PLATE <br />SHEAR WALL <br />PANEL AS PER <br />PLAN <br />SIMPSON HILDOWN AS PER <br />PLAN AND ABLE ABOVE <br />SIMPSON EI <br />LARR #252 <br />INSPECTION <br />HOLDOWN TO EXISTING FOUNDATION <br />XY-SET <br />CONT. <br />EQUIRED <br />2 <br />HOLDOWN <br />MODEL <br />ANCHOR DIAMETER <br />MIN. EDGE <br />DIST. <br />MIN. EMBED. <br />DEPTH <br />HOLE <br />DIAMETER <br />Tensile <br />Value #25528 <br />BEARING <br />PLATE <br />SIMP. HDU2 <br />SSTB16 OR <br />5/8" THREADED ROD <br />1 3/4" <br />12 5/8" <br />5/8" + 1/16" <br />2306# <br />21/'21/2" <br />X 3° <br />SIMP. HDU4 <br />5/8 STB16ADEDR ROD <br />1 3/4" <br />1 12 5/8" <br />5/8" + 1/16" <br />3424# <br />2 1/2` 3' x'1/2" <br />NEW 44 <br />POST - <br />BP 5/8 <br />BEARING <br />PLATE LARR <br />#25293 F <br />P.T. SILL <br />PLATE- <br />0 <br />w <br />m <br />w EXTERIOR - <br />GROUND <br />z LEVEL <br />SHEAR WALL <br />PANEL AS PER <br />PLAN <br />SIMPSON HDA AS PER PLAN <br />AND TAB_E ABOVE SIMPSON <br />"SSTB" PER PLAN LARR #25248 <br />OSTRAPS at SHEAR WALL OPENING O HOEDOWN O <br />moved <br />T ISSUANC <br />/ QROFESS/§v \ <br />A K ` �G <br />LU C64806 rn <br />EXP 6/30/2025 <br />V <br />�F OF//CAL�FO� <br />Q <br />[-1 <br />w <br />N <br />W <br />U <br />on <br />(\ J <br />o'6 <br />LLJ <br />Q <br />i <br />�N- <br />J <br />Q <br />Z <br />WOOvo <br />LIJ <br />O <br />C/nnQQ <br />H <br />CL- <br />LLJ <br />I'D <br />0 <br />U <br />0 <br />R// <br />W <br />=co00 <br />I+i <br />W <br />o <br />q <br />Wz <br />� <br />�o <br />w <br />w <br />W <br />Q <br />DRAWN BY: <br />F.L. <br />CHECK'D BY: <br />F.L. <br />SCALE: <br />AS NOTED <br />JOB NO.: <br />PCN #: <br />SHEET <br />SN2 <br />Yi <br />