CITY OF SANTA ANA
<br />v_o
<br />TABLE R602.3(1)
<br />FASTENING SCHEDULE
<br />ITEM
<br />DESCRIPTION OF BUILDING ELEMENTS
<br />NUMBER AND a bPE
<br />OF FASTENER
<br />SPACING AND LOCATION
<br />FLOOR
<br />4-8d box (22" x 0.113"); or
<br />21
<br />Joist to sill, top plate or girder
<br />3-8d common (22" x 0.131"); or3-1Od box (3" x 0.128"); or
<br />Toe nail
<br />3-3" x 0.131" nails
<br />8d box (22" x 0.113")
<br />4" o.c. toe nail
<br />22
<br />Rim joist, band joist or blocking to sill or top
<br />8d common (22" x 0.131"); or
<br />plate (roof applications also)
<br />10d box (3" x 0.128"); or
<br />6" o.c. toe nail
<br />3" x 0.131" nails
<br />3-8d box (22" x 0.113"); or
<br />23
<br />1" x 6" subfloor or less to each joist
<br />2-8d common (22" x 0.131"); or3-10d box (3" x 0.128"); or
<br />Face nail
<br />2 staples, 1" crown, 16 ga., 1j" long
<br />24
<br />„
<br />2 subfloor to joist or girder
<br />3-16d box (32" x 0.135"); or
<br />2-16d 32" 0.162"
<br />Blind and face nail
<br />common x
<br />25
<br />2" planks (plank & beam - floor & roof)
<br />3-16d box (32" x 0.135"); or1»
<br />2-16d (32 0.162")
<br />At each bearing, face nail
<br />common x
<br />3-16d common (32" x 0.162")
<br />4-10 box (3" x 0.128"), or
<br />26
<br />Band or rim joist to joist
<br />4-3" x 0.131" nails; or
<br />End nail
<br />4-3" x 14 ga. staples, i" crown
<br />Nail each layer as follows:
<br />20d common (4" x 0.192"); or
<br />32" o.c. at top and
<br />bottom and staggered.
<br />10d box (3" x 0.128"); or
<br />24" o.c. face nail at top
<br />3" x 0.131" nails
<br />and bottom staggered on
<br />27
<br />Built-up girders and beams, 2-inch lumber layers
<br />opposite sides
<br />And:
<br />2-20d common (4" x 0.192"); or
<br />Face nail at ends and
<br />3-10d box (3" x 0.128"); or
<br />at each splice
<br />3-3" x 0.131" nails
<br />4-16d box (31' x 0.135"); or
<br />28
<br />Ledger strip supporting joists or rafters
<br />3-16d common (3j" x 0.162"); or
<br />4-10d box (3" x 0.128"); or
<br />At each joist or
<br />rafter, face nail
<br />4-3" x 0.131" nails
<br />29
<br />Bridging to joist
<br />2-10d (3" x 0.128")
<br />Each end, toe nail
<br />SPACING OF FASTENERS
<br />ITEM
<br />DESCRIPTION OF
<br />NUMBER AND a b, c
<br />Edges
<br />Intermediate
<br />BUILDING ELEMENTS
<br />TYPE OF FASTENER
<br />g h
<br />(inches)
<br />supports
<br />(inches)
<br />WOOD STRUCTURAL PANELS, SUBFLOOR, ROOF AND INTERIOR WALL SHEATHING TO FRAMING
<br />AND PARTICLEBOARD WALL SHEATHING TO FRAMING
<br />[SEE TABLE R602.3(3) FOR WOOD STRUCTURAL PANEL EXTERIOR WALL SHEATHING TO WALL FRAMING]
<br />30
<br />3" Ills
<br />6d common (2" x 0.113") nail (subfloor, wall)'
<br />6
<br />12'
<br />8 2
<br />8d common (2j" x 0.131") nail (roof)
<br />31
<br />32" - 1"
<br />8d common nail (22" x 0.131")
<br />6
<br />12'
<br />32
<br />11" 1Il"
<br />$
<br />10d common (3" x 0.148") nail; or
<br />6
<br />12
<br />8d (22" x 0.131") deformed nail
<br />Other wall sheathing9
<br />33
<br />2" structural cellulosic fiberboard sheathing
<br />12 galvanized roofing nail, 16 head diameter,
<br />3
<br />6
<br />or 1" crown staple 16 ga., 1" long
<br />34
<br />32" structural cellulosic fiberboard sheathing
<br />1j" galvanized roofing nail, 16 head diameter,
<br />3
<br />6
<br />or 1" crown staple 16 ga., 1J" long
<br />35
<br />„
<br />2 sheathings
<br />12" galvanized roofing nail; staple galvanized,
<br />7
<br />7
<br />gypsum
<br />12" long; 14" screws, Type W or S
<br />36
<br />8" sheathings
<br />1J" galvanized roofing nail; staple galvanized,
<br />7
<br />7
<br />gypsum
<br />18 long screws, Type W or S
<br />Wood structural panels, combination subfloor underlayment to framing
<br />6d deformed (2„ x 0.120;") nail; or
<br />37"
<br />and less
<br />8d common (22 x 0.131) nail
<br />6
<br />12
<br />38"
<br />- Ills
<br />8d common (22" x 0.131") nail; or
<br />6
<br />12
<br />8d deformed (21' x 0.120") nail
<br />39
<br />10d common (3" x 0.148" ) nail; or
<br />6
<br />12
<br />8d deformed (22" x 0.120") nail
<br />TABLE R602.3(1)
<br />FASTENING SCHEDULE
<br />ITEM
<br />DESCRIPTION OF BUILDING ELEMENTS
<br />NUMBER AND a bPE
<br />OF FASTENER
<br />SPACING AND LOCATION
<br />WALL
<br />16d common (32" x 0.162")
<br />24" o.c. face nail
<br />8
<br />Stud to stud (not at braced wall panels)
<br />10d box (3 x 0.128» ); or
<br />„
<br />3" x 0.131" nails
<br />16 o.c. face nail
<br />Stud to stud and abutting studs at intersecting
<br />16d box (32" x 0.135"); or
<br />3" x 0.131" nails
<br />12" o.c. face nail
<br />9
<br />wall corners (at braced wall panels)
<br />16d common (32" x 0.162")
<br />16" o.c. face nail
<br />16d common (32" x 0.162")
<br />16" o.c. each edge face nail
<br />10
<br />Built-up header (2" to 2" header with 1/2" spacer)
<br />16d box (32" x 0.135")
<br />12" o.c. each edge face nail
<br />5-8d box (22" x 0.113"); or
<br />11
<br />Continuous header to stud
<br />4-8d common (22" x 0.131"); or
<br />Toe nail
<br />4-10d box (3" x 0.128")
<br />16d common (32" x 0.162")
<br />16" o.c. face nail
<br />12
<br />Top plate to top plate
<br />10d box (3" x 0.128"); or
<br />„
<br />12 face
<br />3" x 0.131" nails
<br />o.c. nail
<br />Double top plate splice for SDCs A-D2 with
<br />8-16d common (32" x 0.162"); or
<br />seismic braced wall line spacing < 25'
<br />12-16d box (32" x 0.135"); or
<br />12-10d box (3" x 0.128"); or
<br />Face nail on each side of end
<br />13
<br />12-3" x 0.131" nails
<br />joint (minimum 24" lap splice
<br />length each side of end joint)
<br />Double top plate splice SDCs Do, D1 , or D2 ;
<br />1
<br />12-16d (3" x 0.135")
<br />and braced wall line spacing >_25'
<br />2
<br />16d common (32" x 0.162")
<br />16" o.c. face nail
<br />14
<br />Bottom plate to joist, rim joist, band joist or
<br />16d box (32" x 0.135"); or
<br />blocking>,
<br />panels)
<br />(not at braced wall p )
<br />3" 0.131"
<br />12 o.c. face nail
<br />x nails
<br />Bottom plate to joist, rim joist, band joist or
<br />3-16d box (32" x 0.135"); or
<br />1»
<br />3 each 16" o.c. face nail
<br />15
<br />blocking (at braced wall panel)
<br />2-16d common (32 x 0.162); or
<br />2 each 16" o.c. face nail
<br />4-3" x 0.131" nails
<br />4 each 16" o.c. face nail
<br />4-8d box (22 " x 0.113"); or
<br />3-16d box (3j" x 0.135"); or
<br />4-8d common (22" x 0.131"); or
<br />Toe nail
<br />4-1Od box (3" x 0.128"); or
<br />4-3" x 0.131" nails
<br />16
<br />Top or bottom plate to stud
<br />1
<br />3-16d box (32„ x 0.135» ); or
<br />2-16d common (32" x 0.162"); or
<br />End nail
<br />3-1Od box (3" x 0.128"); or
<br />3-3" x 0.131" nails
<br />3-10d box (3" x 0.128"); or
<br />17
<br />Top plates, laps at corners and intersections
<br />2-16d common (32" x 0.162"); or
<br />Face nail
<br />3-3" x 0.131" nails
<br />3-8d box (22" x 0.113"); or
<br />18
<br />1" brace to each stud and plate
<br />2-8d common (22" x 0.131"); or2-1Od box (3" x 0.128"); or
<br />Face nail
<br />2 staples 14"
<br />3-8d box (22" x 0.113"); or
<br />19
<br />1"x 6" sheathing to each bearing
<br />2-8d common (22" x 0.131"); or
<br />2-1 Od box (3 X 0.128 ); or
<br />Face nail
<br />2 staples, 1" crown, 16 ga., 13" long
<br />3-8d box (22" x 0.113"); or
<br />3-8d common (22" x 0.131"); or
<br />3-10d box (3" x 0.128"); or
<br />3 staples, 1" crown, 16 ga., 1i" long
<br />20
<br />1"x 8" and wider sheathing to each bearing
<br />Face nail
<br />Wider than 1" x 8"
<br />4-8d box (22" x 0.113"); or
<br />3-8d common (22" x 0.131"); or
<br />3-1Od box (3" x 0.128"); or
<br />4 staples, 1" crown, 16 ga., 1j" long
<br />#4 DOWELS @ 36" oc,
<br />12" TO (N) & 6"TO (E)
<br />FOOTING W/ SET EPDXY
<br />CONT. SPEC. INSP. REQ'D
<br />(E) 2x STUDS ® 16"oc
<br />4x POST
<br />(N) SLAB (N) 5/8" 0 ANCHOR PER SHR
<br />"A34" CLIP PER PLAN WALL W/ 10" MIN EMBEDMENT
<br />2 SIDES BELOW TOP OF SLAB EPXOY
<br />TO PLATE TO (E) FOOTING W/ SIMPSON
<br />EPDXY SET ET-22.
<br />x
<br />III= I=11
<br />o z 2" (E) FOOTING
<br />NEW SLAB PER PLAN I (E) FOOTING
<br />POST AT CONTINUOUS FOOTING J ANCHOR TO EXISTING FOUNDATION
<br />SHEAR WALL SHEAR WALL AT SHEAR WALL
<br />PER PLAN PANELS AROUND OPENING PER PLAN
<br />\
<br />HDR/BM 3
<br />SHEAR WALL OPENING
<br />\\ i
<br />3
<br />x
<br />i\
<br />i
<br />i
<br />1. 2x STUDS @ 16" OC
<br />2. 2x BLOCKING ALONG ENTIRE LENGTH OF STRAP. 5
<br />3. SIMPSON CS14 STRAP ON ENTIRE LENGTH OF SHEAR WALL.
<br />4. PLYWOOD SHEAR WALL PER PLAN, APPLY AT EACH SIDE OF
<br />WINDOW AND ALSO AT ABOVE AND BELOW WINDOW OPENING.
<br />U 5. SILL FLAIL NAILING OR BOL I ING PER SHEAR WALL SCHEDULE.
<br />6. HOLD-DOWN PER PLAN.
<br />L
<br />D
<br />D
<br />i)
<br />TABLE R602.3(1)
<br />FASTENING SCHEDULE FOOTNOTES
<br />a. Nails are smooth -common, box or deformed shanks except where otherwise stated. Nails used for fra ing and sheathing
<br />connections shall have minimum average bending yield strengths as shown: 80 ksi for shank diameter of 0.192 inch (20d
<br />common nail), 90 ksi for shank diameters larger than 0.142 inch butnot larger than 0.177 inch, and 10 ksi for shank Ap
<br />diameters of 0.142 inch or less. b. Staples are 16 gage wire and have a minimum 7/16-inch on diameter crown width. FOR PER
<br />c. Nails shall be spaced at not more than 6 inches on center at all supports where spans are 48 inches pr greater.
<br />d. Four -foot by 8-foot or 4-foot by 9-foot panels shall be applied vertically.
<br />e. Spacing of fasteners not included in this table shall be based on Table R602.3(2). Master ID:
<br />f. Where the ultimate design wind speed is 130 mph or less, nails for attaching wood structural panel roo s athi g to gable end
<br />wall framing shall be spaced 6inches on center. Where the ultimate design wind speed is greater than 1 0 I$ for
<br />attaching panel roof sheathing to intermediate supports shall be spaced 6 inches on center for minimu 48-inch distance from
<br />ridges, eaves and gable end walls; and 4 inches on center to gable end wall framing.
<br />g. Gypsum sheathing shall conform to ASTM C1396 and shall be installed in accordance with GA 253. Fiberboard sheathing shall
<br />conform to ASTM C208.
<br />h. Spacing of fasteners on floor sheathing panel edges applies to panel edges supported by framing members and required blocking
<br />and at floor perimeters only. Spacing of fasteners on roof sheathing panel edges applies to panel edges supported by framing
<br />members and required blocking. Blocking of roof or floor sheathing panel edges perpendicular to the framing members need not
<br />be provided except as required by other provisions of this code. Floor perimeter shall be supported by framing members or solid
<br />blocking.
<br />i. Where a rafter is fastened to an adjacent parallel ceiling joist in accordance with this schedule, provide two toe nails on one
<br />side of the rafter and toe nails from the ceiling joist to top plate in accordance with this schedule. The toe nail on the
<br />opposite side of the rafter shall not be required.
<br />TABLE R602.3(1)
<br />FASTENING SCHEDULE
<br />ITEM
<br />DESCRIPTION OF BUILDING ELEMENTS
<br />NUMBER AND a bPE
<br />OF FASTENER
<br />SPACING AND LOCATION
<br />ROOF
<br />4-8d
<br />box (22" x 0.113"); or
<br />1
<br />Blocking between ceiling joists or rafters to top plate
<br />3-8d
<br />3-10d
<br />common (22" x 0.131 "); or
<br />box (3 x 0.128» ); or
<br />Toe nail
<br />3-3"
<br />x 0.131" nails
<br />4-8d
<br />box (22" x 0.113"); or
<br />2
<br />Ceiling joists to top plate
<br />3-8d
<br />3-10d
<br />common (22" x 0.131"); or
<br />box (3 x 0.128 ); or
<br />Per joist, toe nail
<br />3-3"
<br />x 0.131" nails
<br />Ceiling joist not attached to parallel rafter, laps
<br />4-10d
<br />box (3" x 0.128"); or
<br />3
<br />over partitions [see Sections R802.3.1, R802.3.2
<br />3-16d
<br />common (32" x 0.162"); or
<br />Face nail
<br />and Table R802.5.1(9)]
<br />4-3"
<br />x 0.131" nails
<br />Ceiling joist attached to parallel rafter (heel joint)
<br />4
<br />[see Sections R802.3.1 and R802.3.2 and Table
<br />Table
<br />R802.5.1(9)
<br />Face nail
<br />R802.5.1(9)]
<br />5
<br />Collar tie to rafter, face nail or 1" x 20 ga.
<br />4-10d
<br />3-10d
<br />box (3" x 0.128"); or
<br />common (3" x 0.148"); or
<br />Face nail each rafter
<br />ridge strap to rafter
<br />4-3"
<br />x 0.131" nails
<br />3-16d
<br />box nails (32" x 0.135"); or
<br />2 toe nails on one side and
<br />6
<br />Rafter or roof truss to plate
<br />3-1Od
<br />common nails (3" x 0.148"); or
<br />1 toe nail on opposite side
<br />4-1Od
<br />box (3 x 0.128 ); or
<br />of each rafter or truss'
<br />4-3"
<br />x 0.131" nails
<br />4-16d
<br />(32" x 0.135"); or
<br />3-1Od
<br />common (32" x 0.148"); or
<br />4-1Od
<br />box (3" x 0.128"); or
<br />Toe nail
<br />Roof rafters to ridge, valley or hip rafters or roof
<br />4-3"
<br />x 0.131" nails
<br />7
<br />rafter to minimum 2" ridge beam
<br />3-16d
<br />box (32" x 0.135"); or
<br />2-16d
<br />common (32" x 0.162"); or
<br />End nail
<br />3-10d
<br />box (3" x 0.128"); or
<br />3-3"
<br />x 0.131" nails
<br />HOLDOWN
<br />MODEL
<br />ANCHOR
<br />DIA.
<br />MIN. EDGE
<br />DIST.
<br />MIN. EMBED.
<br />DEPTH
<br />HOLE
<br />DIAMETER
<br />STUD
<br />BOLTS
<br />SIMPSON
<br />EPDXY ET-22
<br />SIMP. HDU2
<br />SSTB16 OR
<br />5/8" THREADED ROD
<br />1
<br />10"
<br />5/8" + 1/16"
<br />6-SDS3
<br />L.A. R.R.
<br />SIMP. HDU4
<br />5/8" THREAD DR ROD
<br />1
<br />12"
<br />5/8" + 1/16"
<br />10-SDS3
<br />#25185
<br />NEW 4 x 4 POST
<br />AS PER PLAN
<br />BP 5/8 BEARING -
<br />PLATE LARR #25293
<br />P.T. SILL PLATE
<br />SHEAR WALL
<br />PANEL AS PER
<br />PLAN
<br />SIMPSON HILDOWN AS PER
<br />PLAN AND ABLE ABOVE
<br />SIMPSON EI
<br />LARR #252
<br />INSPECTION
<br />HOLDOWN TO EXISTING FOUNDATION
<br />XY-SET
<br />CONT.
<br />EQUIRED
<br />2
<br />HOLDOWN
<br />MODEL
<br />ANCHOR DIAMETER
<br />MIN. EDGE
<br />DIST.
<br />MIN. EMBED.
<br />DEPTH
<br />HOLE
<br />DIAMETER
<br />Tensile
<br />Value #25528
<br />BEARING
<br />PLATE
<br />SIMP. HDU2
<br />SSTB16 OR
<br />5/8" THREADED ROD
<br />1 3/4"
<br />12 5/8"
<br />5/8" + 1/16"
<br />2306#
<br />21/'21/2"
<br />X 3°
<br />SIMP. HDU4
<br />5/8 STB16ADEDR ROD
<br />1 3/4"
<br />1 12 5/8"
<br />5/8" + 1/16"
<br />3424#
<br />2 1/2` 3' x'1/2"
<br />NEW 44
<br />POST -
<br />BP 5/8
<br />BEARING
<br />PLATE LARR
<br />#25293 F
<br />P.T. SILL
<br />PLATE-
<br />0
<br />w
<br />m
<br />w EXTERIOR -
<br />GROUND
<br />z LEVEL
<br />SHEAR WALL
<br />PANEL AS PER
<br />PLAN
<br />SIMPSON HDA AS PER PLAN
<br />AND TAB_E ABOVE SIMPSON
<br />"SSTB" PER PLAN LARR #25248
<br />OSTRAPS at SHEAR WALL OPENING O HOEDOWN O
<br />moved
<br />T ISSUANC
<br />/ QROFESS/§v \
<br />A K ` �G
<br />LU C64806 rn
<br />EXP 6/30/2025
<br />V
<br />�F OF//CAL�FO�
<br />Q
<br />[-1
<br />w
<br />N
<br />W
<br />U
<br />on
<br />(\ J
<br />o'6
<br />LLJ
<br />Q
<br />i
<br />�N-
<br />J
<br />Q
<br />Z
<br />WOOvo
<br />LIJ
<br />O
<br />C/nnQQ
<br />H
<br />CL-
<br />LLJ
<br />I'D
<br />0
<br />U
<br />0
<br />R//
<br />W
<br />=co00
<br />I+i
<br />W
<br />o
<br />q
<br />Wz
<br />�
<br />�o
<br />w
<br />w
<br />W
<br />Q
<br />DRAWN BY:
<br />F.L.
<br />CHECK'D BY:
<br />F.L.
<br />SCALE:
<br />AS NOTED
<br />JOB NO.:
<br />PCN #:
<br />SHEET
<br />SN2
<br />Yi
<br />
|