Laserfiche WebLink
CITY OF SANTA ANA <br />mrting-andIDvrfdirtg�g e n c y <br />HDU 2 (TYP) <br />3,4�51W <br />4X4 POST 3,4 <br />Oz-S-oz o2 s-02 <br />HDU 2 (TYP) <br />4X4 POST A.B. 448" Min <br />EX. SLAB TO BE EPDXY - - - - - - <br />7�\ <br />PROTECTED FROM � %1 � O p F- o <br />MOISTURE 14' - 0" �' N <br />7 <br />PROVIDE REDGARD I 5 X v <br />WATERPROOFING AND 02-S-02 <br />CRACK PREVENTION I W <br />MEMBRANE <br />ICC4ESR-141310 <br />I ,n <br />I o i s 1 1I <br />N Ex. 1' - 0" I 02 O- 2 <br />`- `: • ' - footing <br />I <br />EX. SLAB TO BE <br />3,4 I EPDXY PROTECTED I ` <br />02-S-02 I 5 FROM MOISTURE <br />N o <br />I <br />HDU 2 (TYP)'CO <br />4X4 POST <br />"- 02-S-02 <br />Ex. 1' - 0" <br />footing <br />HDU 2 (TYP) ¢j " % t. ••.+ • ^a . ..�:•. <br />4X4 POST I - <br />*G.C. to verify <br />3,4 I 6 ex. footing r '6 19-0) <br />02-s-02 X 01,3 <br />° " I <br />° <br />c 02-S-023 G' •d•" 13 02-$-02 i <br />02-S-o ti <br />tyT .`V New1-0„ , <br />=° NEW 4" CONC. SLAB - d - footing <br />Im > <br />to <br />New 1'- 0" a Eo 0 <br />footin °' 1 1 3 HDU 2 (TYP) <br />9 <br />• � 02-5-02 a a' "a 02-5-02 4X4 POST <br />�z.� - - - <br />_ 5/8" A.B. @48" Min' a ;a - - <br />1,3 1,3 <br />02-S-02 �1� 02-S-02 <br />4'-0" 7HDU <br />0"4'-0" <br />HDU 2 (TYP) <br />4X4 POST 4X4 POST <br />2 <br />24"x24" Deep <br />pad w/(3) 44 "CONTRACTOR TO VERIFY THE SIZE OF <br />Bars each way EXISTING FOOTING <br />**HOLDOWNS TO BE USED: HDU2 <br />Foundation Plan <br />1 /4" = 1'-0" <br />02S 02 <br />9 HDU 2 (TYP) <br />2(2X4) POST <br />02-S-02 <br />14'-0" <br />HDU <br />2 (TYP) 1 <br />2(2X4) POST <br />N. 4x4 HDR <br />3, i2O <br />2 <br />< x <br />' Ex. 2x C.J.@16" O.0 <br />= N <br />TO REMAIN <br />0 <br />5 <br />III <br />ZJ 1 <br />k02-S-02/ <br />N. 4x4 HDR' <br />5 ` <br />02-s-02 <br />02-S-02 N �� <br />0 <br />w <br />o td <br />r- N <br />HDU 2 (TYP) <br />+� <br />N. 4x4 HDR <br />cc n N <br />= N <br />2(2X4) POST <br />Ex. 2x R.R.@16" O.0 <br />02-s-02 <br />TO REMAIN ' <br />HDU 2 (TYP) <br />„ + ^a • wv <br />2(2X4) POST <br />Ex. 2x R.R.@16" O.0 <br />o *G.C. to verify <br />IZT ex. roof framing TO REMAIN <br />z <br />7 7 <br />0 <br />02-S-02 New 2x10 ridge oz-s-oz <br />�- <br />N <br />New 2x10 C.J.@16" O.0 <br />a~ <br />>a <br />11 <br />New 2x8 R.R.@16" O.0 <br />o ~ <br />02�� <br />New 2x8 R.R.@16" O.0 <br />o0 o N <br />9 <br />= N <br />�1 0 7 oz-8-02 1 2 <br />02\ S-OZ/ 02-S-02 02-S-02 <br />N. 4x4 HDR N. 4x4 HDR <br />CC <br />1 1 = = 1 <br />HDU 2 (TYP) <br />4'-0" 4'-0" C° `x 4'-0" <br />2(2X4) POST <br />HDU 2 (TYP) HDU 2 (TYP) 11 4x6 HDR <br />2(2X4) POST 2(2X4) POST <br />2 <br />9 <br />OFraming Plan <br />1 /4" = 1'-0" <br />*G.C. TO VERIFY EX. ROOF FRAMING <br />MINIMUM FOUNDATION CONSTRUCTION REQUIREMENTS <br />1. Depth of foundations below the natural grade shall not be less than 18 <br />inches. <br />2. Continious foundations shall be reinforced with at least four continuous #4 <br />reinforcing bars, two #4 bars at the top and two #4 bars at the bottom <br />3. Slab construction shall be minimum 4" thick, reinforced with -4 bars at 18" <br />on center each way <br />4. Doweling of the new foundations and slabs into the existing foundations and <br />slabs shall be required. Dowels shall be a minimum of 6" into the existing <br />concrete and shall extend a minimum of 24" into the new concrete. Dowels <br />shall be minimum #3 bars at 18" on center or #4 bars at 24" on center <br />EPDXY BASE PROCEDURE <br />1. DRILL HOLE 1/8 0 LARGER THAN ANCHOR <br />2. CLEAN HOLE WITH BRUSH AND <br />COMPRESSED AIR <br />3. PLACE ROD AT BOTTOM OF HOLE OF SILL <br />Simpson Set XP Epoxy -Tie (ICC-ESR #2508) <br />4. GROUNT WITH FLOWABLE EPDXY FLUSH <br />TO TOP <br />5. DEPUTY INSPECTION REQUIRED FOR <br />PROPER HOLDOWN INSTALLATION AND <br />INTEGRITY OF (E) CONCRETE <br />6. ALLOW 24 HR. CURE BEFORE <br />TIGHTENING NUT <br />TYP. ANCHOR BOLTS <br />BOLT <br />DIAMETER <br />D <br />MINIMUM EMBEDMENT <br />VERT. <br />ANCHOR BOLTS <br />HORIZ. <br />ANCHOR BOLTS <br />1/2" <br />7" <br />5" <br />5/8" <br />7" <br />5" <br />3/4" <br />7" <br />5" <br />7/8" <br />8" <br />6" <br />1. <br />9„ <br />T' <br />1 1 /8" <br />10" <br />8" <br />*USE: 5/8 ANCHOR BOLTS 10" LONG <br />EMBEDDED 7", 12" @ ENDS OF SILL & 6-0" O.0 <br />W/ 3" X 3" X 1/4" PLATE WASHER. <br />TABLE R602.3(1) <br />FASTENERSCHEDULE FORSTRUCTURAL MEMBERS <br />ITEM <br />DESCRIPTION OF BUILDING ELEMENTS <br />NUMBER AND TYPE OF <br />NUNU FASTENER <br />SPACING OF FASTENERS <br />ROOF <br />1 <br />Blocking between joist or rafters to top plate, toe nail <br />3-8d (2 1 /2"x0.113") <br />- <br />2 <br />Ceiling joists to plate, toe nail <br />3-8d (2 1/2"x0.113") <br />- <br />3 <br />Ceiling joists not attached to parallel rafter, laps over partitions, face <br />nail <br />3-10d <br />- <br />4 <br />Collar tie rafter, face nail or 1 1/4"x20 gage ridge strap <br />3-10d (3"x0.128") <br />- <br />5 <br />Rafter to plate, toe nail <br />2-16d(3 1/2"x 0.135") <br />- <br />6 <br />Roof rafters to ridge, valley or hip rafters: <br />toe nail <br />face nail <br />4-16d(3 1 /2"x0.135") <br />3-16d(3 1/2"x0.135") <br />- <br />WALL <br />7 <br />Built-up corner studs <br />10d (3"4.128") <br />24" o.c. <br />8 <br />Built-up header, two pieces with 1/2" spacer <br />16d (3 1/2"x0.135") <br />16" o.c. along each edge <br />9 <br />Continued header, two pieces <br />16d (3 1/2"x0.135") <br />16" o.c. along each edge <br />10 <br />Continued header to stud, toe nail <br />4-8d (2 1/2"x0.113") <br />- <br />11 <br />Double studs, face nail <br />10d (3"x0.128") <br />24" o.c. <br />12 <br />Double top plate, face nail <br />10d (3"4.128") <br />24" o.c. <br />13 <br />Double top plate, minimum 48-inch offset of end joints, <br />face nail in lapped area <br />8-16d (3 1/2"x0.135") <br />- <br />14 <br />Sole plate to joist or blocking, face nail <br />16d (3 1/70.135") <br />16" o.c. <br />15 <br />Sole plate to joist or blocking at bated wall panels <br />3-16d (3 1/2"4.135") <br />16" o.c. <br />16 <br />stud to sole plate, toe nail <br />3-8d ( 2 1/2"x0.113") <br />- <br />17 <br />Top or sole plae to stud, end nail <br />2-16d (3 1/2"x0.135") <br />- <br />18 <br />Top plates, laps at comers and intersections, face nail <br />2-10d (3 "x0.128") <br />- <br />19 <br />1" brace to each stud and plate, face nail <br />2-8d (2 1/2"x0.113") <br />2 staples 1 3/4" <br />- <br />- <br />20 <br />1"x6" sheathing to each bearing, face nail <br />2-8d (2 1/2"x0.113") <br />2 staples 1 3/4" <br />- <br />- <br />21 <br />1"x8" sheathing to each bearing, face nail <br />2-8d (2 1/2"x0.113") <br />3 staples 1 3/4" <br />- <br />- <br />22 <br />Wider than 1 "x8" shearing to each bearing, face nail <br />3-8d (2 1 /2"x0.113") <br />4 staples 1 3/4" <br />- <br />- <br />FLOOR <br />23 <br />Joist to sill or girder, toe nail <br />3-8d (2 1 /2"x0.113") <br />- <br />24 <br />1 "x6" subfloor or less to each joist, face nail <br />2-8d (2 1 /2"x0.113") <br />2 staples 1 3/4" <br />- <br />- <br />25 <br />2" subfloor to joist or girder, blind and face nail <br />2-16d (3 1/2"x0.135") <br />- <br />26 <br />Rim joist to top plate, toe nail (roof applications also) <br />8d (2 1 /2"x0.113") <br />6" o.c. <br />27 <br />2" planks (planks & beam -floor & roof) <br />2-16d (3 1/2"x0.135") <br />at each bearing <br />28 <br />Built-up girders and beams, 2-inch lumber layers <br />14d (3"x0.128") <br />Nail each layer as follows: 32" o.c. <br />at top and bottom and staggered. <br />Two nails at ends and at each splice. <br />29 <br />Ledger strip supporting joists or rafters <br />3-16d (3 1 /2"x0.135") <br />FAach joist or rafter <br />TABLE R602.3(1) continued <br />FASTENER SCHEDULE FOR STRUCTURAL MEMBERS <br />ITEM <br />DESCRIPTION OF BUILDING <br />MATERIALS <br />DESCRIPTION OF FASTENER b,c,e <br />SPACING OF FASTENERS <br />EDGES <br />(INCHES) <br />INTERMEDIATE c,e SUPPOF <br />Wood structural panels, subfloor, roof and interior wall sheathing to framing and particleboard wall sheathing to framing <br />30 <br />3/8" - 1 /2" <br />common 2"x0.1 mmon �1 "1 nail nail(subfloorwall) 8d <br />( ) (roof) <br />6 <br />12 g <br />31 <br />5/16 1 /2 <br />6d common (2"4.113") nail (subfloor wall) 8d <br />common (2"x0.131 ") nail (roof) <br />6 <br />12 g <br />32 <br />19/32" - 1 " <br />8d common (2"4.131 ") <br />6 <br />12 g <br />33 <br />1 1 /8" - 1 1 /4" <br />10d common (3"x0.148") nail or 8d (2 <br />1/2"x0.131")deformed nail <br />6 <br />12 <br />Other wall sheathing <br />34 <br />1/2" structural cellulosic <br />fiberboard sheathing <br />1/2" galvanized roofing nail. 7/16" crown or 1" crown staple <br />16 ga. 1 1 /4" long <br />3 <br />6 <br />35 <br />25/32" structural cellulosic <br />fiberboard sheathing <br />1 3/4" galvanized roofing nail. 7/16" crown or 1" crown staple <br />16 ga. 1 1/2" long <br />3 <br />6 <br />36 <br />112" gypsum sheathing d <br />1 112" galvanized roofing nail : staple galvanized, 1 1/2" long; 1 <br />5/8" screws. Type W or S <br />7 <br />7 <br />37 <br />5/8" gypsum sheathing d <br />1 3/4" galvanized roofing nail ; staple galvanized, 1 5/8" long; 1 <br />5/8 screws. Type W or S <br />7 <br />7 <br />Wood structural panels, combination subfloor underlayment to framing <br />38 <br />3/4" and less <br />6d deformed (2"x0.120") nail or 8d <br />common (21/2"x 0.131") nail <br />6 <br />12 <br />39 <br />7/811- 1 „ <br />8d deformed (2 1 /2"x0.131 ") nail or 8d <br />deformed (2 1/2"x 0.120") nail <br />6 <br />12 <br />40 <br />1 1/8"- 1" <br />10d common (3"x0.148") nail or 8d <br />deformed (2 1/2"x 0.120") nail <br />6 <br />12 <br />TS (INCHES) <br />AFAV <br />4 <br />VILDERS INC <br />core nierciat* multifamily R residenticit <br />,-.THIS DESIGN AND DRAWINGS, ARE <br />HT PROTECTED AND ARE <br />TH EXCLUSIVE PROPERTY OF J&C BUILDERS INC, <br />THEY SHALL BE <br />NO USED, MODIFIED DUPLICATED IN <br />ASSIGNED TO A THIRD PARTY WITHOUT <br />THE WRITTEN AUTHORIZATION <br />OF J&C BUILDERS INC. <br />CONSULTANTS <br />OWNER <br />Juan Silva <br />949-232-3265 <br />CONTACT PERSON <br />Jose Zambrano <br />1117 SANTA FE AVE. #100 <br />LONG BEACH CA 90813 <br />MOBILE: 562 522 3549 <br />EMAIL: info@jchomebuilders.net <br />DESIGNER <br />J&C BUILDERS INC <br />1117 SANTA FE AVE. #100 <br />LONG BEACH CA 90813 <br />MOBILE: 562 522 3549 <br />EMAIL: info@jchomebuilders.net <br />T-24 <br />No. Description Date <br />APPROVAL STAMP <br />Convert 360 ft2 garage <br />+ 150 ft2 Add for a total <br />of 510 ft2 A D U <br />909 S Pacific Ave, <br />Santa Ana, CA 92703 <br />UNDATION & FRAMING <br />PLAN <br />Project number 0001 <br />Date 02-13-2025 <br />Drawn by J&C Builders <br />Checked by <br />02-S-01 <br />ANCE <br />