Laserfiche WebLink
D <br />II <br />1.32900 <br />0.47400 <br />1.06300 <br />0.53700 <br />DATE:11/14/2024 <br />JOB NO: MLB24-1210 <br />DESIGNED BY: HK <br />CHECKED BY: GB <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />DA <br />T <br />E <br />RE <br />V <br />BY <br />1 3 4 5 <br />- <br />2 <br />- <br />- <br />MLB CONSULTING AND <br />ENGINEERING, INC <br />7918 FOOTHILL BLVD <br />SUNLAND, CA 91040 <br />(818) 521-6342 <br />INFO@MLBENGINEERING.ORG <br />4703 W McFadden <br />Ave Santa Ana, CA <br />92704 <br />DATE:11/14/2024 <br />JOB NO: MLB24-1210 <br />DESIGNED BY: HK <br />CHECKED BY: GB <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />DA <br />T <br />E <br />RE <br />V <br />BY <br />1 3 4 5 <br />- <br />2 <br />- <br />- <br />MLB CONSULTING AND <br />ENGINEERING, INC <br />7918 FOOTHILL BLVD <br />SUNLAND, CA 91040 <br />(818) 521-6342 <br />INFO@MLBENGINEERING.ORG <br />4703 W McFadden <br />Ave Santa Ana, CA <br />92704 <br />STRUCTURAL - GENERAL NOTES <br />GENERAL REQUIREMENTS <br />GOVERNING CODE: THE DESIGN AND CONSTRUCTION OF THIS PROJECT IS GOVERNED BY THE “CALIFORNIA <br />BUILDING CODE (CBC)”, 2022 EDITION, HEREAFTER REFERRED TO AS THE CBC, AS ADOPTED AND MODIFIED BY <br />THE COUNTY OF LOS ANGELES, UNDERSTOOD TO BE THE AUTHORITY HAVING JURISDICTION (AHJ). <br />REFERENCE STANDARDS: REFER TO CHAPTER 35 OF 2022 CBC. WHERE OTHER STANDINGS ARE NOTED IN THE <br />DRAWINGS, USE THE LATEST EDITION OF THE STANDARD UNLESS A SPECIFIC DATE IS INDICATED. <br />REFERENCE TO A SPECIFIC SECTION IN CODE DOES NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE <br />WITH THE ENTIRE STANDARD. <br />DEFINITIONS: THE FOLLOWING DEFINITIONS COVER THE MEANINGS OF CERTAIN TERMS USED IN THESE <br />NOTES: <br />·“ARCHITECT/ENGINEER” - THE ARCHITECT OF RECORD AND THE STRUCTURAL/CIVIL ENGINEER OF <br />RECORD. <br />·“STRUCTURAL/CIVIL ENGINEER OF RECORD” (SER) OR (EOR) - THE STRUCTURAL/CIVIL ENGINEER WHO IS <br />LICENSED TO STAMP & SIGN THE STRUCTURAL DOCUMENTS FOR THE PROJECT. THE SER IS <br />RESPONSIBLE FOR THE DESIGN OF THE PRIMARY STRUCTURAL SYSTEM. <br />·“SUBMIT FOR REVIEW” - SUBMIT TO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR TO FABRICATION OR <br />CONSTRUCTION. <br />·“PER PLAN” - INDICATED REFERENCES TO THE STRUCTURAL PLANS, ELEVATIONS AND STRUCTURAL <br />GENERAL NOTES. <br />·“ENGINEER OF RECORD”(EOR) - A PROFESSIONAL ENGINEER (PE OR SE), LICENSED IN THE STATE WHERE <br />THE PROJECT IS LOCATED, (TYPICALLY THE SER). DOCUMENTS STAMPED AND SIGNED BY THE EOR <br />SHALL BE COMPLETED BY OR UNDER THE DIRECT SUPERVISION OF THE EOR. <br />·“BIDDER-DESIGNED” - COMPONENTS OF THE STRUCTURE THAT REQUIRE THE GENERA; CONTRACTOR, <br />SUBCONTRACTOR, OR SUPPLIER WHO IS RESPONSIBLE FOR THE DESIGN, FABRICATION AND <br />INSTALLATION OF SPECIALTY-ENGINEERED ELEMENTS IDENTIFIED IN THE CONTRACT DOCUMENTS TO <br />RETAIN THE SERVICES OF AN SSE. SUBMITTALS OF “BIDDER-DESIGNED” ELEMENTS SHALL BE STAMPED <br />AND SIGNED BY THE SSE. <br />SPECIFICATIONS: REFER TO THE PROJECT SPECIFICATIONS ISSUED AS PART OF THE CONTRACT DOCUMENTS <br />FOR INFORMATION SUPPLEMENTAL TO THESE DRAWINGS <br />OTHER DRAWINGS: REFER TO THE ARCHITECTURAL, MECHANICAL. ELECTRICAL, CIVIL, AND PLUMBING <br />DRAWINGS FOR ADDITIONAL INFORMATION INCLUDING BUT NOT LIMITED TO: DIMENSIONS, ELEVATIONS, <br />SLOPES, DOOR AND WINDOW OPENINGS, NON-BEARING WALLS, STAIRS, FINISHES, DRAINS, WATERPROOFING, <br />RAILINGS, ELEVATORS, CURBS, DEPRESSIONS, MECHANICAL UNIT LOCATIONS, AND OTHER NON-STRUCTURAL <br />ITEMS. <br />STRUCTURAL DETAILS: THE STRUCTURAL DRAWINGS ARE INTENDED TO SHOW THE GENERAL CHARACTER AND <br />EXTENT OF THE PROJECT AND ARE NOT INTENDED TO SHOW ALL DETAILS OF THE WORK. USE ENTIRE DETAIL <br />SHEETS AND SPECIFIC DETAILS REFERENCED IN THE PLANS AS “TYPICAL” WHEREVER THEY APPLY. <br />SIMILARLY, USE DETAILS ON ENTIRE SHEETS WITH “TYPICAL' IN THE SAME NAME WHEREVER THEY APPLY. <br />STRUCTURAL RESPONSIBILITIES: THE STRUCTURAL/CIVIL ENGINEER IS RESPONSIBLE FOR THEIR STRENGTH <br />AND STABILITY OF THE PRIMARY STRUCTURE IN ITS COMPLETED FORM. <br />COORDINATION: THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DETAILS AND ACCURACY OF THE <br />WORK; FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND DIMENSIONS; FOR SELECTING <br />FABRICATION PROCESSES; FOR TECHNIQUES OF ASSEMBLY; AND FOR PERFORMING WORK IN A SAFE AND <br />SECURE MANNER. <br />PRE-CONSTRUCTION MEETINGS: THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING PRE-CONSTRUCTION <br />MEETINGS PRIOR TO COMMENCING WORK. PRE-CON MEETINGS, SCHEDULED APPROXIMATELY TWO WEEKS <br />PRIOR FROM THE START OF THE RELEVANT WORK, ARE REQUIRED FOR THE FOLLOWING PHASES OF <br />CONSTRUCTION: POST-TENSIONED SLABS, STRUCTURAL STEEL AND CONCRETE. ATTENDEES FOR <br />PRE-CONSTRUCTION MEETING ARE TO INCLUDE CONTRACTOR, RELEVANT SUBCONTRACTORS, <br />FABRICATORS, INSPECTORS, ARCHITECT/ENGINEER, AND REPRESENTATIVE OF THE AUTHORITY HAVING <br />JURISDICTION WHERE REQUIRED. MEETING AGENDAS ARE TO INCLUDE REVIEW OF THE WORK SCOPE, <br />PROJECT SCHEDULE RELEVANT TO THE WORK, CONTACT INFORMATION OF RESPONSIBLE PARTIES, <br />INSPECTION POINTS, REVIEW OF MATERIALS AD ANY SPECIAL CASES OR ISSUES, PROCEDURES FOR <br />CLARIFICATIONS IF REQUIRED, TESTING AND ACCEPTANCE, ETC. <br />MEANS, METHODS AND SAFETY REQUIREMENTS: THE CONTRACTOR IS RESPONSIBLE FOR THE MEANS AND <br />METHODS OF CONSTRUCTION AND ALL JOB RELATED SAFETY STANDARDS SUCH AS OSHA AND DOSH <br />(DEPARTMENT OF OCCUPATIONAL SAFETY AND HEALTH). CONTRACTOR IS RESPONSIBLE TO ADHERE TO <br />OSHA REGULATIONS. BOLTING AND FIELD WELDING AT ALL MEMBER CONNECTIONS IS TO BE COMPLETED <br />PRIOR TO THE RELEASE OF THE MEMBER FROM THE HOISTING MECHANISM UNLESS REVIEWED AND <br />APPROVED BY THE GENERAL CONTRACTOR'S TEMPORARY BRACING AND SHORING DESIGN ENGINEER. <br />BRACING/SHORING DESIGN ENGINEER: THE CONTRACTOR SHALL AT HIS DISCRETION EMPLOY AN SSE, A <br />REGISTERED PROFESSIONAL ENGINEER FOR THE DESIGN OF ANY TEMPORARY BRACING AND SHORING. <br />TEMPORARY SHORING, BRACING: THE CONTRACTOR IS RESPONSIBLE FOR THE STRENGTH AND STABILITY OF <br />THE STRUCTURE DURING CONSTRUCTION AND SHALL PROVIDE SHORING, BRACING AND OTHER ELEMENTS <br />REQUIRED TO MAINTAIN STABILITY UNTIL THE STRUCTURE IS COMPLETE. IT IS THE CONTRACTOR'S <br />RESPONSIBILITY TO BE FAMILIAR WITH THE WORK REQUIRED IN THE CONSTRUCTION DOCUMENTS AND THE <br />REQUIREMENTS FOR EXECUTING IT PROPERLY. <br />CONSTRUCTION LOADS: LOADS ON THE STRUCTURE DURING CONSTRUCTION SHALL NOT EXCEED THE DESIGN <br />LOADS AS NOTED IN THE DESIGN CRITERIA & LOADS BELOW OR THE CAPACITY OF PARTIALLY COMPLETED <br />CONSTRUCTION AS DETERMINED BY THE CONTRACTOR'S SSE FOR BRACING/SHORING. <br />CHANGES IN LOADING: THE CONTRACTOR HAS THE RESPONSIBILITY TO NOTIFY THE SER OF ANY <br />ARCHITECTURAL, MECHANICAL, ELECTRICAL, OR PLUMBING LOAD IMPOSED ONTO THE STRUCTURE THAT <br />DIFFERS FROM, OR THAT IS NOT DOCUMENTED ON THE ORIGINAL CONTRACT DOCUMENTS <br />(ARCHITECTURAL/STRUCTURAL/MECHANICAL/ELECTRICAL OR PLUMBING DRAWINGS). PROVIDE <br />DOCUMENTATION OF LOCATION, LOAD, SIZE AND ANCHORAGE OF ALL UNDOCUMENTED LEADS IN EXCESS OF <br />400 POUNDS. PROVIDE MARKED-UP STRUCTURAL PLAN INDICATING LOCATIONS OF ANY NEW EQUIPMENT OR <br />LOADS. SUBMIT PLANS TO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR TO INSTALLATION. <br />NOTE PRIORITIES: PLAN AND DETAIL NOTES AND SPECIFIC LOADING DATA PROVIDED ON INDIVIDUAL PLANS <br />AND DETAIL DRAWINGS SUPPLEMENTS INFORMATION IN THE STRUCTURAL GENERAL NOTES. <br />DISCREPANCIES: IN CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, <br />PLANS/DETAILS OR REFERENCE STANDARDS, THE ARCHITECT/ENGINEER SHALL DETERMINE WHICH SHALL <br />GOVERN. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE <br />PROCEEDING WITH THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN THE CONTRACT DOCUMENTS, THE <br />CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN THE PRICE THE MOST EXPENSIVE WAY OF <br />COMPLETING WORK, UNLESS PRIOR TO THE SUBMISSION OF THE PRICE, THE CONTRACTOR ASKS FOR A <br />DECISION FROM THE ARCHITECT AS TO WHICH SHALL GOVERN. ACCORDINGLY, ANY CONFLICT BETWEEN THE <br />CONTRACT DOCUMENTS SHALL NOT BE A BASIS FOR ADJUSTMENT IN THE CONTRACT PRICE. <br />SITE VERIFICATION: THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE. <br />CONFLICTS BETWEEN THE DRAWINGS AND ACTUAL SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION <br />OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. <br />ADJACENT UTILITIES: THE CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL ADJACENT UNDERGROUND <br />UTILITIES PRIOR TO EARTHWORK FOUNDATIONS, SHORING, AND EXCAVATION. ANY UTILITY INFORMATION <br />SHOWN ON THE DRAWINGS AND DETAILS IS APPROXIMATE AND NOT NECESSARILY COMPLETE. <br />ALTERNATES: ALTERNATE PRODUCTS OF SIMILAR STRENGTH, NATURE AND FORM FOR SPECIFIED ITEMS MAY <br />BE SUBMITTED WITH ADEQUATE TECHNICAL DOCUMENTATION (PROPER TEST REPORT, ETC.) TO THE <br />ARCHITECT/ENGINEER FOR REVIEW. ALTERNATE MATERIALS THAT ARE SUBMITTED WITHOUT ADEQUATE <br />TECHNICAL DOCUMENTATION OR THAT SIGNIFICANTLY DEVIATE FROM THE DESIGN INTENTS OF MATERIALS <br />SPECIFIED MAY BE RETURNED WITHOUT REVIEW. ALTERNATES THAT REQUIRE SUBSTANTIAL EFFORT TO <br />REVIEW WILL NOT BE REVIEWED UNLESS AUTHORIZED BY THE OWNER. <br />MAIN WIND FORCE RESISTING SYSTEM <br />Ultimate Design Wind Speed, VULT (MPH) <br />Exposure Category <br />Internal Pressure Coefficient <br />Topographic Factor <br />Wind Analysis Procedure Used: <br />COMPONENT & CLADDING PRESSURES FOR DESIGN <br />Wall Cladding, Typical Zone <br />Wall Cladding, Edge Zone within 20 ft. of corners <br />Roof Cladding, Middle Zone <br />Roof Cladding, Edge Zone within 20 ft. of edge <br />Roof Cladding, Corner Zone within 20 ft. of corners <br />Cpi = <br />Kzt = <br />DESIGN CRITERIA <br />Risk Category of Building per 2022 CBC Table 1604.5 = <br />Site Classification per CBC 1613.3.2 & ASCE 7-16, CH. 20 <br />Site Class = <br />Seismic Design Category: <br />Seismic Importance Factor per ASCE 7-16 Table 1.5-2 <br />Spectral Response Acceleration (Short Period) <br />Spectral Response Acceleration (1-Second Period) <br />Spectral Design Response Coefficient (Short Period) <br />Spectral Design Response Coefficient (1-Second Period) <br />SDC = <br />IE = <br />SS = <br />S1 = <br />SDS = <br />SD1 = <br />SEISMIC FORCE RESISTING SYSTEMS: <br />Light-frame (wood) sheathed with wood structural panels <br />rated for shear resistance (Wood Shearwalls) <br />Response Modification Factor <br />System Overstrength Factor <br />Deflection Amplification Factor <br />Seismic Response Coefficient <br />Redundancy Factor <br />R = <br />Ω = <br />Cd = <br />Cs = <br />ρ = <br />Special Reinforced Concrete Shearwalls <br />R = <br />Ω = <br />Cd = <br />Cs = <br />ρ = <br />Response Modification Factor <br />System Overstrength Factor <br />Deflection Amplification Factor <br />Seismic Response Coefficient <br />Redundancy Factor <br />6.5 <br />2.5 <br />4 <br />1.3 <br />5 <br />2.5 <br />5 <br />1.3 <br />SEIMIC DESIGN: <br />DL (PSF) <br />DESIGN DEAD & LIVE LOADS <br />INSPECTIONS, QUALITY ASSURANCE, VERIFICATIONS AND TEST REQ's <br />INSPECTIONS: FOUNDATIONS, FOOTINGS, UNDER SLAB SYSTEMS AND FRAMING ARE SUBJECT TO INSPECTION <br />BY THE BUILDING OFFICIAL IN ACCORDANCE WITH CBC 110.3. CONTRACTOR SHALL COORDINATE ALL <br />REQUIRED INSPECTIONS WITH THE BUILDING OFFICIAL. <br />SPECIAL INSPECTIONS, VERIFICATIONS AND TESTS: SPECIAL INSPECTION, VERIFICATIONS AND TESTING SHALL <br />BE DONE IN ACCORDANCE WITH CBC CHAPTER 17 AND THE STATEMENT OF SPECIAL INSPECTIONS HEREIN <br />PER CBC SECTIONS 1704 AND 1705, INCLUDING 1705.11 FOR SEISMIC RESISTANCE FOR PROJECTS IN <br />SEISMIC DESIGN CATEGORIES C , D, E AND F AS APPLICABLE. <br />SPECIAL INSPECTION AGENCY AND SPECIAL INSPECTORS: OWNER SHALL RETAIN AN “APPROVED AGENCY” PER <br />CBC 1703 TO PROVIDE SPECIAL INSPECTIONS FOR THE PROJECT, SPECIAL INSPECTORS SHALL BE <br />QUALIFIED PERSONS PER CBC 1704.2.1. <br />STATEMENT OF SPECIAL INSPECTIONS: SPECIAL INSPECTIONS AND TESTING PER CBC SECTIONS 1704 AND 1705 <br />ARE REQUIRED FOR THE FOLLOWING: <br />FABRICATION SHOP INSPECTION: WHERE OFF-SITE FABRICATION OF GRAVITY LOAD BEARING MEMBERS <br />& ASSEMBLIES IS PERFORMED, SPECIAL INSPECTOR SHALL VERIFY THAT THE FABRICATOR COMPLIES <br />WITH CBC 1704.2. <br />SOILS & FOUNDATION CONSTRUCTION PER CBC SECTION 1705.6 <br />·PERIODIC INSPECTION OF SOILS EARTHWORK PER TABLE 1705.6 IS REQUIRED FOR: <br />o FOOTING SOIL BEARING SURFACED PRIOR TO PLACING ANY REINFORCING STEEL <br />o EXCAVATION DEPTH AND BEARING LAYER PRIOR TO PLACING ANY REINFORCING <br />STEEL. <br />o COMPACTED FILL MATERIAL CLASSIFICATION <br />o SUBGRADE PREPARATION PRIOR TO FILLING <br />·CONTINUOUS INSPECTION PER TABLE 1705.6 IS REQUIRED FOR: <br />o FILLING OPERATIONS TO SATISFY REQUIREMENTS OF CBC TABLE 1705.6 AND THE <br />GEOTECHNICAL REPORT LISTED UNDER SOILS AND FOUNDATIONS SECTION <br />o COMPACTED FILL DENSITY TESTING OF EACH LIFT THICKNESS AND MATERIAL <br />CLASSIFICATION <br />CONCRETE CONSTRUCTION PER CBC SECTION 1705.3 AND TABLE 1705.3 INCLUDING: <br />·PERIODIC INSPECTION REQUIRED FOR: <br />o SIZE AND PLACEMENT OF ALL REINFORCING STEEL AND PT TENDONS PRIOR TO THE <br />POUR <br />o PLACEMENT CLEARANCES AROUND REINFORCING STEEL AND PT TENDONS AT <br />EMBEDDED CONDUIT <br />o PLACING AND SIZE OF CAST-IN-PLACE BOLTS AND EMBEDDED FABRICATIONS PRIOR <br />TO THE POUR <br />o SHAPE, LOCATION AND DIMENSIONS OD MEMBERS FORMED <br />o USE OF THE REQUIRED DESIGN CONCRETE MIX <br />o MAINTENANCE OF SPECIFIC CURING TEMPERATURE AND TECHNIQUES <br />o VERIFICATION OF IN-SITU CONCRETE STRENGTH PRIOR TO REMOVAL OF SHORES AND <br /> FORMS FROM BEAMS AND STRUCTURAL SLABS <br />o VERIFICATION OF IN-SITU CONCRETE STRENGTH TO STRESSING OF PT TENDONS <br />·CONTINUOUS INSPECTION REQUIRED DURING THE <br />o PLACING OF REINFORCED CONCRETE FOR PROPER APPLICATION TECHNIQUES <br />o PLACING CONCRETE AROUND CAST-IN-PLACE BOLTS AND EMBEDS <br />o SAMPLING OF FRESH CONCRETE <br />o DETERMINATIONS OF SLUMP, AIR CONTENT AND TEMPERATURE <br />o GROUTING OPERATION OF POST-INSTALLED BOLTS AND EMBEDS <br />o PT TENDON STRESSING <br />SHOTCRETE CONSTRUCTION: PER CBC 1910 INCLUDING: <br />·CONTINUOUS INSPECTION REQUIRED DURING THE: <br />o SHOTCRETE PLACEMENT FOR THE PRECONSTRUCTION TEST PANEL (IF REQUIRED BY <br />THE AHJ OR THE EOR) <br />o TAKING OF CORE SPECIMENS FOR CONSTRUCTION SPECIMENS <br />o PLACING OF ALL PRODUCTION SHOTCRETE <br />STRUCTURAL MASONRY PER CBC SECTION 1705.4 AND 1705.12 <br />LEVEL A - MASONRY CONSTRUCTION PER TMS 402-11/ACI 530-11/ASCE 6-11 SECTION 1.19.1: <br />·PERIODIC INSPECTION REQUIRED FOR: <br />o SIZE, GRADE, PLACEMENT AND TYPE OF REINFORCING STEEL AND CONNECTORS <br />o PROPORTIONS OF SITE-PREPARED MORTAR <br />o PROTECTION OF MASONRY DURING COLD WEATHER (TEMP. BELOW 40 DEGREES F) <br />o PROTECTION OF MASONRY DURING HOT WEATHER (TEMP ABOVE 90 DEGREES F) <br />o COMPLIANCE WITH REQUIRED INSPECTION PROVISIONS OF THE CONSTRUCTION <br />DOCUMENTS AND THE APPROVED SUBMITTALS <br />STRUCTURAL STEEL PER CBC 1704.2.5.1 <br />A QUALIFIED SPECIAL INSPECTOR OF AN “APPROVED AGENCY” PROVIDING QUALITY <br />ASSURANCE (QA) SPECIAL INSPECTIONS FOR THE PROJECT SHALL REVIEW AND CONFIRM THE <br />FABRICATOR AND ERECTOR'S QUALITY CONTROL (QC) PROCEDURES FOR <br />COMPLETENESS AND ADEQUACY RELATIVE TO AISC 360-10 CHAPTER N, THE AISC 303 CODE OF <br />STANDARD PRACTICE, AWS D1.1-2010 STRUCTURAL WELDING CODE AND CURRENT CBC CODE <br />REQUIREMENTS FOR THE FABRICATOR'S SCOPE WORK <br />o QA AGENCY PROVIDING SPECIAL INSPECTION AND NONDESTRUCTIVE TESTING NDT PER <br />AISC 360-10 SECTION N4 <br />o VERIFY FABRICATOR AND ERECTOR QUALITY CONTROL PROGRAM PER AISC 360-10 <br />SECTION N2 <br />o VISUAL WELDING INSPECTION OF WELDS BY BOTH QC AND QA PERSONNEL SHALL BE PER <br /> TABLED LISTED IN AISC 360 SECTION N5 <br />o INSPECTION TASKS FOR WELDING <br />§PRIOR TO WELDING PER AISC 360-10 TABLE N5.4-1 <br />§DURING WELDING PER AISC 360-10 TABLE N5.4-2 <br />§AFTER WELDING PER AISC 360-10 TABLE N5.4-3 <br />o NONDESTRUCTIVE TESTING (NDT) OF WELDS: <br />§NON-DESTRUCTIVE WELDING (NDT) OF WELDED JOINTS PER AISC 360-10 N.5 <br />§RISK CATEGORY FOR DETERMINATION OF EXTENT OF NDT PER AISC 360 N5.5B IS NOTED IN <br />THE DESIGN CRITERIA AND LOADS SECTION OF THESE GENERAL REQUIREMENTS <br />§NDT PERFORMED SHALL BE DOCUMENTED AND REPORTS SHALL} IDENTIFY THE TESTED <br />WELD PIECE MARK AND LOCATION IN THE PIECE <br />§FOR FIELD WORK, THE NDT REPORT SHALL IDENTIFY THE TESTED WELD BY LOCATION IN <br />THE STRUCTURE, PIECE MARK AND LOCATION IN THE PIECE <br />§FOR FIELD WORK, THE NDT REPORT SHALL IDENTIFY THE TESTED WELD BY LOCATION IN <br />THE STRUCTURE, PIECE MARK AND LOCATION IN THE PIECE <br />o INSPECTION TASKS FOR BOLTING PER AISC 360-10 SECTION N5.6 <br />§PRIOR TO BOLTING PER AISC 360-10 TABLE N5.6-1 (NOT REQUIRED FOR SNUG-TIGHT <br />JOINTS) <br />§DURING BOLTING PER AISC 360-10 TABLE N5.6-2 (NOT REQUIRED FOR SNUG-TIGHT JOINTS) <br />§AFTER BOLTING PER AISC 360-10 TABLE N5.6-3 <br />o ADDITIONAL INSPECTION TASKS PER AISC 360-10 SECTION N5.7 <br />o INSPECTION FOR COMPOSITE CONSTRUCTION SHALL BE DONE PER AISC 360-10 SECTION N6 <br />LL (PSF)AREAOCCUPANCY OR USE <br />Residential <br />Uninhabitable attics without storage <br />Uninhabitable attics with storage <br />Private Rooms and Corridors serving them <br />Balcony and Decks <br />Roofs <br />Ordinary flat, pitched, and curved roofs <br />Stair and exitway ways <br />One- and two-family dwellings only <br />Misc. <br />Handrails and guardrails <br />25 60 <br />15 20 <br />15 <br />15 <br />20 40 <br />10 <br />20 <br />20 40 <br />50 plf / <br />200 lbs30 <br />Exterior walls <br />Interior walls <br />WOOD-FRAMED WALLS 19 <br />14 <br />(1)Top rail shall be designed to resist 50 PLF line load or 200 ib point load applied in any direction at any point. <br />Intermediate rails (all those except the handrail), balusters and panel fillers shall be designed to withstand a <br />horizontally applied normal load of 50 LB on an area not to exceed 1 ft square. These three loads are to be <br />considered separately with worst case used for design. <br />(2) Place 300lb concentrated load over 2”x2” area at any point to produce maximum stress. Area load and concentrated <br />load are to be considered separately with worst case used for design <br />(3) Need not apply concurrently with other handrail and guardrail loads; applied over not more than 1 square foot <br />(4) Apply concentrated wheel load over 4.5”x4.5” square area <br />WIND DESIGN: <br />OCCUPANCY <br />WOOD CONSTRUCTION PER CBC SECTION 1705.5 & 1705.11.2: <br />·PERIODIC INSPECTION REQUIRED FOR VERIFICATION OF: <br />O SHEAR WALLS: ANCHOR BOLTS, HOLD DOWNS (HD) AND CONTINUOUS ROD TIE-DOWN SYSTEMS (TDS) <br />INCLUDING SQUASH BLOCKS, LPT SHEAR CONNECTORS, STRAP CONNECTORS, BOUNDARY EDGE NAILING, <br />PLATE NAILING, AND PANEL EDGE SHEAR NAILING FOR SIZE & SPACING WHERE FASTENER SPACING OF THE <br />SHEATHING IS 4 INCHES OR LESS. <br />O DIAPHRAGMS: BLOCKING, STRAP CONNECTIONS, BOUNDARY EDGE AND PANEL SHEAR NAILING SIZE & <br /> SPACING WHERE FASTENER SPACING OF THE SHEATHING IS 4 INCHES OR LESS <br />O MOISTURE CONTENT OF WOOD STUDS, PLATES, BEAMS AND JOISTS <br />O PROPER BOTTOM PLATES SIZES (2X AND 3X) AND PLATE WASHERS <br />O ROOF TRUSS 'HURRICANE' CLIPS. <br />POST-INSTALLED ANCHORS TO CONCRETE AND MASONRY: SHALL COMPLY WITH CBC SECTION 1703. INSPECTIONS <br />SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN THE APPROVED ICC EVALUATION REPORT AND AS <br />INDICATED BY THE DESIGN REQUIREMENTS SPECIFIED ON THE DRAWINGS. REFER TO THE POST INSTALLED ANCHORS <br />SECTION OF THESE NOTES FOR ANCHORS THAT ARE THE BASIS OF THE DESIGN. SPECIAL INSPECTOR SHALL VERIFY <br />ANCHORS ARE AS SPECIFIED IN THE POST INSTALLED ANCHORS SECTION OF THESE NOTES OR AS OTHERWISE SPECIFIED <br />ON THE DRAWINGS. SUBSTITUTIONS REQUIRE APPROVAL BY THE SER AND REQUIRE SUBSTANTIATING CALCULATIONS <br />AND CURRENT 2012 IBC RECOGNIZED ICC EVALUATION SERVICES (ES) REPORT. SPECIAL INSPECTOR SHALL DOCUMENT IN <br />THEIR SPECIAL INSPECTION REPORT COMPLIANCE WITH EACH OF THE ELEMENTS REQUIRED WITHIN THE APPLICABLE ICC <br />EVALUATION SERVICES (ES) REPORT <br />INSPECTION SUBMITTALS: SPECIAL INSPECTION REPORTS SHALL BE PROVIDED ON A WEEKLY BASIS. FINAL SPECIAL <br />INSPECTION REPORTS WILL BE REQUIRED BY EACH SPECIAL INSPECTION FIRM PER CBC 1704.2.4. SUBMIT COPIES OF ALL <br />INSPECTION REPORTS TO THE ARCHITECT/ENGINEER AND THE AUTHORITY HAVING JURISDICTION FOR REVIEW <br />STRUCTURAL OBSERVATION: STRUCTURAL OBSERVATION SHALL BE PROVIDED FOR STRUCTURES CLASSIFIED AS SEISMIC <br />DESIGN CATEGORY D, E AND F IN ACCORDANCE WITH CBC SECTION 1704.5 AND SECTION 107.3.4. STRUCTURAL <br />OBSERVATION SITE VISITS WILL BE AS FOLLOWS: PRIOR TO FIRST FOUNDATION POUR, DURING SHEAR WALL <br />CONSTRUCTION, PRIOR TO EACH UNIQUE ELEVATED SLAB POUR , PRIOR TO THE FIRST MILD REINFORCED SLAB, PRIOR <br />RO THE FIRST POST-TENSIONED SLAB AND SEVERAL PERIODIC VISITS THEREAFTER, PERIODICALLY DURING FLOOR AND <br />ROOF FRAMING AND AFTER ROOF DIAPHRAGM IS COMPLETE PRIOR TO ROOFING <br />CONTRACTOR RESPONSIBILITY: PRIOR TO ISSUANCE OF THE BUILDING PERMIT, THE CONTRACTOR IS REQUIRED <br />TO PROVIDE THE AUTHORITY HAVING JURISDICTION A SIGNED, WRITTEN ACKNOWLEDGEMENT OF THE <br />CONTRACTOR'S RESPONSIBILITIES ASSOCIATED WITH THE ABOVE SATEMENT OF SPECIAL INSPECTIONS <br />ADDRESSING THE REQUIREMENTS IN CBC SECTION 1704.4 CONTRACTOR IS REFERRED TO CBC SECTIONS <br />1705.11.5 AND 1705.11.6 FOR ARCHITECTURAL AND MEP BUILDING SYSTEMS THAT MAY BE SUBJECT TO <br />ADDITIONAL INSPECTIONS (BASED ON THE BUILDING'S DESIGNATED SEISMIC DESIGN CATEGORY LISTED IN THE <br />CRITERIA), INCLUDING ANCHORAGE OF HVAC DUCTWORK CONTAINING HAZARDOUS MATERIALS, PIPING <br />SYSTEMS AND MECHANICAL UNITS CONTAINING FLAMMABLE, COMBUSTIBLE OR HIGHLY TOXIC MATERIALS, <br />ELECTRICAL EQUIPMENT USED FOR EMERGENCY OR STANDBY POWER, EXTERIOR WALL PANELS AND <br />SUSPENDED CEILING SYSTEMS. <br />PREFABRICATED CONSTRUCTION: ALL PREFABRICATED CONSTRUCTION SHALL CONFORM TO CBC SECTION 1703. <br />SPECIAL INSPECTIONS (CBC 1705): <br />SPECIAL INSPECTION SHALL BE COMPLETED BY A DEPUTY INSPECTOR <br />LICENSED AND REGISTERED WITH THE GOVERNING BUILDING DEPT. <br />CONCRETE OVER 2500 PSI <br />ANCHORS INSTALLED IN CONCRETE <br />DRIVEN DEEP FOUNDATIONS <br />SMOKE CONTROL SYSTEM <br />OTHER <br />SHOTCRETE <br />P <br />P <br />P <br />C <br />C <br />C <br />C <br />P <br />P/C <br />C <br />C <br />C <br />P/C <br />* C: CONTINUOUS P: PERIODIC <br />CBC 1705.3 <br />POST INSTALLED ANCHORS / EPOXY <br />CBC TABLE 1705.3 <br />CBC TABLE 1705.3 <br />CBC TABLE 1705.3 <br />REINFORCING STEEL AND STEEL TENDONS CBC TABLE 1705.3 <br />STRUCTURAL STEEL <br />STRUCTURAL STEEL WELDING <br />CBC 1705.2 , 1705.12.1 <br />CBC 1705.2 <br />HIGH STRENGTH BOLTING CBC 1705.2 <br />MASONRY CONSTRUCTION CBC 1705.4 <br />HIGH-LOAD DIAPHRAGMS CBC 1705.5.1 <br />WOOD CONSTRUCTION CBC 1705.5, 1705.11.1 <br />COLD-FORMED STEEL CBC 1705.11.2 <br />CBC TABLE 1705.7 <br />SPRAY-APPLIED FIRE RESISTIVE MATERIALS <br />SOILS CBC TABLE 1705.6 <br />CBC TABLE 1705.14 <br />CBC TABLE 1705.18 <br />REMARKSITEMSCODE REFERENCE TYPE <br />SPECIAL INSPECTIONS <br />SEE ALSO ICC APPROVAL <br />SEE SOILS REPORT <br />P/C <br />P/C <br />P <br />SCOPE OF WORK <br />PROJECT TEAM <br />OWNER <br />ARCHITECT <br />CIVIL <br />ENGINEER <br />GEO <br />ENGINEER <br />ADU <br />MLB CONSULTING AND ENGINEERING <br />7918 FOOTHILL BLVD. <br />SUNLAND, CA 91040 <br />Phone: (818) 521-6342 <br />Phone: <br />SURVEYOR <br />Phone: <br />APPLICABLE BUILDING CODES <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA RESIDENTIAL CODE <br />2022 CALIFORNIA ELECTRIC CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA GREEN BUILDING STANDARDS <br />AMENDMENTS PER LOCAL CITY ORDINANCE <br />AMERICAN INSITUTE OF STEEL CONSTRUCTION, LATEST ADOPTED EDITION <br />NDS WOOD DESIGN MANUAL, LATEST ADOPTED EDITION <br />ASCE-7, LATEST ADOPTED EDITION <br />AISC SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS <br />ACI: BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND <br />COMMENTARY <br />2022 CBC <br />2022 CRC <br />2022 CEC <br />2022 CPC <br />2022 CMC <br />2022 CFC <br />CALGreen <br />AISC <br />NDS, NDS SUPPLEMENT, <br />SDPWS <br />ASCE7-16 <br />ACI 318-19 <br />AISC 341-16 S-0.10 <br />ST <br />R <br />U <br />C <br />T <br />U <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S