Laserfiche WebLink
DATE:11/14/2024 <br />JOB NO: MLB24-1210 <br />DESIGNED BY: HK <br />CHECKED BY: GB <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />DA <br />T <br />E <br />RE <br />V <br />BY <br />1 3 4 5 <br />- <br />2 <br />- <br />- <br />MLB CONSULTING AND <br />ENGINEERING, INC <br />7918 FOOTHILL BLVD <br />SUNLAND, CA 91040 <br />(818) 521-6342 <br />INFO@MLBENGINEERING.ORG <br />4703 W McFadden <br />Ave Santa Ana, CA <br />92704 <br />DATE:11/14/2024 <br />JOB NO: MLB24-1210 <br />DESIGNED BY: HK <br />CHECKED BY: GB <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />DA <br />T <br />E <br />RE <br />V <br />BY <br />1 3 4 5 <br />- <br />2 <br />- <br />- <br />MLB CONSULTING AND <br />ENGINEERING, INC <br />7918 FOOTHILL BLVD <br />SUNLAND, CA 91040 <br />(818) 521-6342 <br />INFO@MLBENGINEERING.ORG <br />4703 W McFadden <br />Ave Santa Ana, CA <br />92704 <br />P/BC 2017-024 <br />GENERAL NOTES FOR STRUCTURAL OBSERVATION <br />(1) Structural Observation is required for the structural system in accordance with the Information Bulletin <br />No. P/BC 2017-024. Structural Observation is the visual observation at the construction site of the <br />elements and connections of the structural system at significant construction stages, and the <br />complete structure for general conformance to the approved plans and specifications. Structural <br />Observation does not waive the responsibility for the inspections required of the building inspector <br />or the deputy inspector. <br />(2) The owner shall employ a State of California registered civil or structural engineer or licensed architect <br />to perform the Structural Observation. The Los Angeles Department of Building and Safety (LADBS) <br />requires the use of the engineer or architect, or his/her designee responsible for the structural design <br />who are independent of the contractor. <br />(3) The Structural Observer shall provide evidence of employment by the owner or the owner’s <br />representative. A letter from the owner, the owner’s representative, or a copy of the agreement for <br />services shall be sent to the building inspector before the first site visit. <br />(4) The owner or owner's representative shall coordinate and call for a meeting between the engineer or <br />architect responsible for the structural design, Structural Observer, contractor, affected subcontractors <br />and deputy inspectors. The purpose of the meeting shall be to identify the major structural elements <br />and connections that affect the vertical and lateral load systems of the structure and to review <br />scheduling of the required observations. A record of the meeting shall be included in the first <br />observation report submitted to the building inspector. <br />(5) The Structural Observer shall perform site visits at those steps in the progress of the work that allow <br />for correction of deficiencies without substantial effort or uncovering of the work involved. At a <br />minimum, the listed significant construction stages on either the “Structural Observation/Significant <br />Construction Stages” form or the “Structural Observation Program and Designation of the Structural <br />Observer” form IN/Form.08 (Part 2) require a site visit and an observation report from the Structural <br />Observer. <br />(6) The Structural Observer shall prepare a report of the “Structural Observation Report Form” <br />IN/Form.08 (Part 1) for each significant stage of construction observed. The original of the Structural <br />Observation report shall be sent to the building inspector's office and shall be signed and sealed (wet <br />stamp) by the responsible Structural Observer. One copy of the observation report shall be attached <br />to the approved plans. The copy attached to the plans shall be signed and sealed (wet stamp) by the <br />responsible Structural Observer or their designee. Copies of the report shall also be given to the <br />owner, contractor, and deputy inspector. Any deficiency noted on the observation report will become <br />the responsibility of the structural engineer or architect of record to verify its completion by the <br />Structural Observer. <br />(7) A final observation report must be submitted which shows that all observed deficiencies were resolved <br />and structural system generally conforms with the approved plans and specifications. The Los <br />Angeles Department of Building and Safety (LADBS) will not accept the structural work without the <br />final observation report and the correction of specific deficiencies noted during normal building <br />inspection. <br />(8) The Structural Observer shall provide the original stamped and signed “Structural Observation Report <br />Form” to the City of Los Angeles Department of Building and Safety Building Inspector. <br />(9) When there is a need to replace the Structural Observer of record, the owner shall: <br />a) Notify the building inspector in writing before the next inspection by submitting completed <br />“Structural Observation Program and Designation of the Structural Observer” form IN/Form.08 <br />(Part 2). <br />b) Call an additional preconstruction meeting, and <br />c) Furnish the replacement Structural Observer with a copy of all previous observation reports. <br />d) The new Structural Observer must be designated by the engineer or architect of record. <br />The replacement Structural Observer shall approve the correction of the original observed deficiencies <br />unless otherwise approved by plan check supervision. The policy of the Department shall be to correct <br />any properly noted deficiencies without consideration of their source. <br />(10) The engineer or architect of record shall develop all changes relating to the structural systems. The <br />building department shall review and approve all changes to the approved plans and specifications. <br />FOUNDATION <br />(required if the Structural Observer is <br />Signature License No. Date <br />_________________________________________________________ <br />individual is designated by me to be responsible for the Structural Observation. <br />I, the Architect or Engineer of record for the project, declare that the above listed firm or <br />DECLARATION BY ARCHITECT OR ENGINEER OF RECORD <br />different from the Architect or Engineer of Record) <br />Signature Date <br />________________________________________ <br />DECLARATION BY OWNER <br />I, the Owner of the project, declare that the above listed firm or individual is hired <br />Structural Observer. <br />STRUCTURAL OBSERVATION PROGRAM <br />AND DESIGNATION OF THE <br />STRUCTURAL OBSERVER <br />Owner:__________________ Architect:____________________ Engineer:_____________________ <br />Description of Work: <br />PROJECT ADDRESS: 4703 W MCFADDEN AVE PERMIT APPL. NO.:___________________ <br />(only checked items are required) <br />STRUCTURAL OBSERVATION <br />Firm or Individual to be responsible for the Structural Observation: <br />Name: Phone: (818) 521-6342 Calif. Registration: C76761 <br />DIAPHRAGMFRAMEWALL <br />Others: <br />Others: <br />Wood <br />Steel Deck <br />ConcreteSteel Moment Frame <br />Steel Braced Frame <br />Concrete Moment Frame <br />Masonry Wall Frame <br />Concrete <br />Masonry <br />Wood <br />Others: <br />Others: <br />Hillside Special Anchors <br />Stepp' g/Retain' g Foundation, <br />Caisson, Piles, Grade Beams <br />Mat Foundation <br />Footing, Stem Walls, Piers <br />by me to be the <br /> REQUIRED NOTES ON PLANS <br />MATERIAL SPECIFICATION & INSPECTIONS <br />1.CONTRACTORS RESPONSIBLE FOR THE CONSTRUCTION OF A WIND OR SEISMIC <br />FORCE RESISTING SYSTEM/COMPONENT LISTED IN <br />THE STATEMENT OF SPECIAL INSPECTION SHALL SUBMIT A WRITTEN <br />STATEMENT OF RESPONSIBILITY TO THE LADBS INSPECTORS AND THE OWNER <br />PRIOR TO THE COMMENCEMENT OF WORK ON SUCH SYSTEM OR <br />COMPONENT. (1704.4) <br />2.CONTINUOUS SPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS <br />REQUIRED FOR FIELD WELDING, POST-INSTALLED ADHESIVE ANCHORS <br />INSTALLED HORIZONTALLY OR UPWARDLY INCLINED TO RESIST TENSION <br />LOADS, SHOTCRETE PLACEMENT, CONCRETE STRENGTH f 'c > 2500 PSI, <br />SPRAYED-ON FIREPROOFING, ENGINEERED MASONRY, HIGH-LIFT GROUTING, , HIGH <br />LOAD DIAPHRAGMS AND SPECIAL MOMENT-RESISTING CONCRETE FRAMES, AND <br />HELICAL PILE FOUNDATIONS. (1705 & CHAPTERS 19, 21, AND 22) <br />3. FOUNDATION SILLS SHALL BE NATURALLY DURABLE OR PRESERVATIVE-TREATED <br />WOOD. (2304.12.1.4) <br />4.FIELD WELDING TO BE DONE BY WELDERS CERTIFIED BY THE LADBS FOR <br />(STRUCTURAL STEEL)(REINFORCING STEEL)(LIGHT GAUGE STEEL). CONTINUOUS <br />INSPECTION BY A DEPUTY INSPECTOR IS REQUIRED. <br />5. SHOP WELDS MUST BE PERFORMED IN A LADBS LICENSED FABRICATOR'S SHOP. <br />6. LADBS LICENSED FABRICATOR IS REQUIRED FOR (TRUSSES), (STRUCTURAL STEEL). <br />7. GLUED-LAMINATED TIMBERS MUST BE FABRICATED IN A LADBS LICENSED SHOP. <br />IDENTITY GRADE SYMBOL AND LAMINATION SPECIES PER 2018 NDS SUPPLEMENT <br />TABLE 5A. <br />8.PROVIDE LEAD HOLE 40%-70% OF THREADED SHANK DIAMETER AND FULL <br />DIAMETER FOR SMOOTH SHANK PORTION.\ <br />9.PERIODIC SPECIAL INSPECTION IS REQUIRED FOR WOOD SHEAR WALLS, SHEAR <br />PANELS, AND DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING, AND <br />OTHER FASTENING TO COMPONENTS OF THE SEISMIC FORCE RESISTING SYSTEM. <br />SPECIAL INSPECTION BY A DEPUTY INSPECTOR IS REQUIRED WHERE THE <br />FASTENER SPACING OF THE SHEATHING IS 4 INCHES ON CENTER OR LESS. <br />(1707.5.12.2) <br />10.SPECIAL ACTIVITY INSPECTION IS REQUIRED FOR (BUILDINGS OVER 5 STORIES OR <br />60' IN HEIGHT) (BUILDINGS OVER 50,000 SQ. FT. OF GROUND FLOOR AREA) <br />(BUILDING OVER 200,000 SQ. FT. OF TOTAL FLOOR AREA.) (1705.1.6) <br />11.A COPY OF THE LOS ANGELES RESEARCH REPORT AND/OR CONDITIONS OF <br />LISTING SHALL BE MADE AVAILABLE AT THE JOB SITE. <br />FOUNDATIONS AND GRADING <br />1.IF ADVERSE SOIL CONDITIONS ARE ENCOUNTERED, A SOILS INVESTIGATION <br />REPORT MAY BE REQUIRED. <br />SHEAR WALLS <br />1. HOLD-DOWN CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE APPROVED PLATE <br />WASHERS; AND HOLD-DOWNS SHALL BE FINGER TIGHT AND ½ WRENCH TURN <br />JUST PRIOR TO COVERING THE WALL FRAMING. CONNECTOR BOLTS INTO WOOD <br />FRAMING REQUIRE STEEL PLATE WASHERS ON THE POST ON THE OPPOSITE <br />SIDE OF THE ANCHORAGE DEVICE. PLATE SIZE SHALL BE A MINIMUM OF 0.299 <br />INCH BY 3 INCHES BY 3 INCHES. (2305.5) <br />2. ROOF DIAPHRAGM NAILING TO BE INSPECTED BEFORE COVERING". FACE GRAIN OF <br />PLYWOOD SHALL BE PERPENDICULAR TO SUPPORTS. FLOOR SHALL HAVE TONGUE <br />AND GROOVE OR BLOCKED PANEL EDGES. PLYWOOD SPANS SHALL CONFORM <br />WITH TABLE 2304.8(1). <br />3.ALL DIAPHRAGM AND SHEAR WALL NAILING SHALL UTILIZE COMMON NAILS OR <br />GALVANIZED BOX. <br />4. ALL BOLT HOLES SHALL BE DRILLED 1/32 TO 1/16" OVERSIZED. (NDS 12.1.3.2) <br />5.HOLD-DOWN HARDWARE MUST BE SECURED IN PLACE PRIOR TO FOUNDATION <br />INSPECTION. <br />S-0.14 <br />ST <br />R <br />U <br />C <br />T <br />U <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br />GEGAM BURNAZYAN <br />MLB CONSULTING AND ENGINEERING <br />SHALL BE ENGINEER OF RECORD <br />ADU