Laserfiche WebLink
EXISTING <br />BUILDING <br />NO WORK <br />PHASE 1 <br />ADDITION <br />AREA OF WORK <br />PHASE 1 <br />TEMPORARY <br />ENCLOSURE <br />SEE CIVIL CONSTRUCTION <br />DOCUMENTS FOR FULL <br />EXTENT OF SITE TO BE <br />COMPLETED <br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET NUMBER <br />THE INFORMATION CONTAINED ON THIS AND ANY <br />RELATED DOCUMENT SHALL NOT BE USED FOR <br />ANY PURPOSE OTHER THAN THE CONVEYANCE <br />OF INFORMATION FOR THE STATED CLIENT AND <br />PROJECT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF THE ENGINEER. <br />ANY INFORMATION TRANSFERRED OR UTILIZED <br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR <br />REFERENCE ONLY <br />WEBBER/SMITH Associates, Inc. <br />20 Wright Avenue <br />Lititz, Pennsylvania 17543 <br />Phone: 717.625.4140 <br />Email: info@webbersmith.com <br />SHEET TITLE: <br />FOR <br />DRAWING STATUS <br />FINAL <br />PROJECT NUMBER <br />www.webbersmith.com <br />SEAL <br />BS-100-1 <br />RBF <br />EJE <br />04/02/2024 <br />BUILDING SITE <br />PLAN <br />2350 PULLMAN ASPIRE BAKERY <br />2350 PULLMAN STREET <br />SANTA ANA, CA 92705 <br />CA <br />5387 <br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved <br />2350 <br />PULLMAN,LLC <br /> 1" = 20'-0"BS-100-1 <br />1 BUILDING SITE PLAN <br />1 2 <br />EXISTING FACILITY <br />NO WORK <br />KEY PLAN REFERENCE <br />NORTH <br />TRUE <br />NORTH <br />NO. DATE DESCRIPTION <br />A 04/02/2024 ISSUED FOR PERMIT AND <br />CONSTRUCTION <br />B 07/23/2024 BULLETIN #1 - PHASE 1 <br />C 11/05/24 BULLETIN #3 - PHASE 1 <br />B <br />NOTES: <br />GENERAL CONTRACTOR - WHITING TURNER (WT) <br />CIVIL ENGINEER - WHEELER & GRAY (WG) <br />BUILDING PLANS - WEBBER/SMITH ASSOCIATES (WS) <br />PLEASE REFER TO WG DOCUMENTS FOR INFORMATION TO BE PROVIDED BY THEM. <br />WT TO PROVIDE ALL INFORMATION AND COORDINATION AS REQUIRED. <br />C <br />C <br />01- <br />REGISTEREDP ROFESSIONALENGINEER67268RICHARDMAURICETHIBEAULT <br />STATEOF CALIFORNIACIVIL <br />11/5/24 <br />2350 S Pullman St - <br />Phase I3/4/2025