My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2350 S Pullman St-Phase I-DEF 1-Concrete Foundation Underpinning - Plan
PBA
>
Building
>
ProjectDox
>
P
>
Pullman St
>
2350 S Pullman St
>
2350 S Pullman St-Phase I-DEF 1-Concrete Foundation Underpinning - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:02:31 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20184030
30147790
40139535
101120904
101120905
101120906
Full Address
2350 S Pullman St
Street Number
2350
Street Direction
S
Street Name
Pullman
Street Suffix
St
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Import Agent
Created:
2/24/2026 5:02 AM
Modified:
2/12/2026 9:25 AM
Text:
http://www.webbersmith.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEFERRED SUBMITTALS <br />• TEMPORARY TENT - FULL DESIGN BY MANUFACTURER TO BE SUBMITTED BY GC FOR PERMIT <br />BUILDING <br />• <br />• <br />• <br />• <br />• <br />M.E.P.R. & FIRE SPRINKLER DISTRIBUTION SUPPORTS AND SEISMIC BRACING <br />CONCRETE FOUNDATION UNDERPINNING SUPPORTS AND TEMPORARY BRACING OF THE EXISTING <br />BUILDING STRUCTURE. <br />TEMPORARY TENT STRUCTURE <br />EXTERIOR AND INTERIOR COLD-FORMED STEEL FRAMING (NOT DESIGNED BY EOR). <br />MECHANICAL ROOFTOP EQUIPMENT SUPPORTS <br />STRUCTURAL <br />• <br />• <br />FIRE SPRINKLER SYSTEM <br />EXPANSION JOINT <br />FIRE PROTECTION <br />• EXPANSION JOINT <br />REFRIGERATION <br />• EXPANSION JOINT <br />MECHANICAL <br />• <br />• <br />FIRE ALARM <br />EXPANSION JOINT <br />ELECTRICAL <br />- TO BE PERMITTED SEPARATELY <br />1973 <br />THE PROJECT CONSISTS OF A 1,714 SQUARE FEET FOOTPRINT ADDITION TO THE EXISTING BAKERY AND STORAGE FACILITY. THE <br />ADDITION CONSISTS OF A NEW SHIPPING/RECEIVING DOCK. PHASE 2 TO FOLLOW. <br />THIS PROJECT WILL INCLUDE A 48 SQ FT CANOPY OVER THE LOADING DOCK, A 1950 SQ FT TEMPORARY ENCLOSURE, EQUIPMENT <br />PADS, ROOF MOUNTED MECHANICAL EQUIPMENT, SCREENING FOR THE LOADING DOCK AND ELECTRICAL EQUIPMENT, AND 26'-6" OF <br />RETAINING WALL. <br />SITE WORK (OUTSIDE OF W/S SCOPE) WILL INCLUDE PARKING LOT RECONFIGURATION INCLUDING 61 PARKING SPACES, 6 LIGHT <br />STANDARDS, AND 108'-0" OF RETAINING WALL. <br />THE TWO PHASES WILL BE SUBMITTED FOR PERMITS SEPARATELY. THE PHASING IS INDICATED ON THE LIFE SAFETY PLANS ALONG <br />WITH THE CONSTRUCTION EGRESS PATHS. THIS SET OF DOCUMENTS WILL DETAIL THE PROPOSED PHASE 1 ADDITION AND <br />CONSTRUCTION. <br />EXISTING - B, F-1, S-1 ADDITION - S-1 <br />92705 <br />Pullman Aspire Bakery Addition - PHASE 1 <br />Original Use Year of Construction <br />Building/ Tenant space interior completion (renovation)Change of Use/ Occupancy <br />AdditionFirst Time Interior Completion (Up-Fit) <br />RenovationNew Building <br />INTERNATIONAL FIRE CODE, 2021 EDITION AS AMENDED IN 2022 CALIFORNIA FIRE CODE <br />EXISTING BUILDING: <br />NEW BUILDING: <br />BUILDING CODE(S): <br />Building Description: <br />PROJECT SUMMARY <br />STATECOUNTYCITY <br />STATEPRIVATECITY/ COUNTY <br />E-Mail:Phone: <br />Zip Code: <br />Code Enforcement Jurisdiction: <br />Owned By: <br />Proposed Use: <br />Address: <br />Name of Project: <br />BUILDING CODE SUMMARY <br />Owner/ Authorized Agent: <br />2350 Pullman Street, Santa Ana, CA <br />UNIFORM MECHANICAL CODE, 20121EDITION AS AMENDED IN 2022 CALIFORNIA MECHANICAL CODE <br />Shell Building <br />Santa Ana <br />INTERNATIONAL BUILDING CODE, 2021 EDITION AS AMENDED IN 2022 CALIFORNIA BUILDING CODE <br />NATIONAL ELECTRICAL CODE, 2020 EDITION AS AMENDED IN 2022 CALIFORNIA ELECTRICAL CODE <br />THE EXISTING BUILDING AND NEW ADDITION PHASES WILL BE CLASSIFIED AS A TYPE IIB, NON-SEPARATED BUILDING, <br />FULLY SPRINKLERED, WITH MIXED OCCUPANCIES OF F-1, S-1, AND B. <br />INTERNATIONAL ENERGY CONVERSATION CODE, 2021 EDITION AS AMENDED IN 2022 CALIFORNIA ENERGY CODE <br />2022 CALIFORNIA BUILDING STANDARDS CODE <br />UNIFORM PLUMBING CODE, 2021 EDITION AS AMENDED IN 2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />ASHRAE 90.1-2019 AS AMENDED IN 2022 CALIFORNIA ENERGY CODE <br />CITY OF SANTA ANA MUNICIPAL CODE REQUIREMENTS <br />2350 Pullman LLC <br />F-1 AND S-1 <br />% Glazed Wall Area Energy Cost BudgetPerformance <br />THERMAL ENVELOPE: <br />Method of Compliance: SEE ENERGY ANALYSIS (If Applicable) <br />ENERGY REQUIREMENTS: <br />Prescriptive <br />ENERGY SUMMARY <br />SEE COM-Check ENERGY ANALYSIS <br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET NUMBER <br />THE INFORMATION CONTAINED ON THIS AND ANY <br />RELATED DOCUMENT SHALL NOT BE USED FOR <br />ANY PURPOSE OTHER THAN THE CONVEYANCE <br />OF INFORMATION FOR THE STATED CLIENT AND <br />PROJECT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF THE ENGINEER. <br />ANY INFORMATION TRANSFERRED OR UTILIZED <br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR <br />REFERENCE ONLY <br />WEBBER/SMITH Associates, Inc. <br />20 Wright Avenue <br />Lititz, Pennsylvania 17543 <br />Phone: 717.625.4140 <br />Email: info@webbersmith.com <br />SHEET TITLE: <br />FOR <br />DRAWING STATUS <br />FINAL <br />PROJECT NUMBER <br />www.webbersmith.com <br />SEAL <br />G-001-1 <br />RBF <br />EJE <br />04/02/2024 <br />COVER SHEET <br />2350 PULLMAN ASPIRE BAKERY <br />2350 PULLMAN STREET <br />SANTA ANA, CA 92705 <br />CA2350 PULLMAN,LLC <br />2350 PULLMAN ASPIRE BAKERY <br />2350 PULLMAN STREET <br />SANTA ANA, CA 92705 <br />5387 <br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved <br />2350 <br />PULLMAN,LLC <br />SHEET INDEX - BUILDING <br />SHEET <br />NUMBER SHEET NAME <br />Building <br />BD100-1 DEMOLITION AND ALTERATION FLOOR PLAN <br />BS-100-1 BUILDING SITE PLAN <br />B-100-1 OVERALL FLOOR PLAN <br />B-101-1 ENLARGED FLOOR PLAN <br />BR100-1 OVERALL ROOF PLAN <br />BR101-1 ENLARGED ROOF PLAN <br />B-200-1 BUILDING ELEVATIONS & SECTIONS <br />B-300-1 WALL SECTIONS <br />B-400-1 DETAILS <br />B-401-1 DETAILS PLAN, BASE & CURB <br />B-402-1 DETAILS ROOF <br />B-500-1 ENLARGED TEMPORARY TENT PLAN <br />B-600-1 DOOR SCHEDULE, ROOM SCHEDULE AND DOOR DETAILS <br />B-901-1 COLOR BUILDING ELEVATIONS <br />SHEET INDEX - GENERAL <br />SHEET <br />NUMBER SHEET NAME <br />General <br />G-001-1 COVER SHEET <br />G-002-1 ABBREVIATIONS AND SYMBOLS <br />G-003-1 LIFE SAFETY PLAN <br />G-004-1 LIFE SAFETY PLAN - DURING CONSTRUCTION <br />G-005-1 CODE REVIEW <br />SHEET INDEX - STRUCTURAL <br />SHEET <br />NUMBER SHEET NAME <br />S-001-1 GENERAL STRUCTURAL NOTES <br />S-002-1 SPECIAL INSPECTION TABLES <br />S-003-1 CONCRETE PIER AND FOOTING SCHEDULES AND TYPICAL FOUNDATION DETAILS <br />S-004-1 TYPICAL STRUCTURAL DETAILS <br />S-005-1 FLOOR SLAB SCHEDULE AND TYPICAL DETAILS <br />S-006-1 STRUCTURAL UPLIFT AND ROOF DECK ATTACHMENT PLAN <br />SB100-1 OVERALL FOUNDATION PLAN <br />SB101-1 ENLARGED FOUNDATION PLAN <br />SB101-1A ENLARGED EXISTING FOUNDATION UNDERPINNING AND RETAINING WALL FOUNDATION <br />PLAN <br />SB102-1 ENLARGED FLOOR SLAB PLAN <br />SB400-1 BASE PLATE DETAILS <br />SB401-1 FOUNDATION SECTIONS <br />SB402-1 FOUNDATION SECTIONS AND DETAILS <br />SF100-1 OVERALL ROOF FRAMING PLAN <br />SF101-1 ENLARGED ROOF FRAMING PLAN <br />SF101-1A ENLARGED CORNICE FRAMING PLAN <br />SF200-1 STRUCTURAL ELEVATIONS <br />SF201-1 STRUCTURAL ELEVATION DETAILS AND GIRT NOTES <br />SF401-1 STRUCTURAL SECTIONS <br />SF402-1 STRUCTURAL DETAILS <br />SHEET INDEX - FIRE PROTECTION <br />SHEET <br />NUMBER SHEET NAME <br />Fire Protection <br />F-001-1 OVERALL FIRE PROTECTION PLAN <br />SHEET INDEX - MECHANICAL <br />SHEET <br />NUMBER SHEET NAME <br />Mechanical <br />M-001-1 MECHANICAL COVER SHEET <br />M-002-1 CODE COMPLIANCE DOCUMENTS <br />M-100-1 FLOOR PLAN - MECHANICAL <br />M-601-1 MECHANICAL DETAILS AND SCHEDULES <br />SHEET INDEX - ELECTRICAL <br />SHEET <br />NUMBER SHEET NAME <br />Electrical <br />E-001-1 ELECTRICAL COVER SHEET <br />E-002-1 PROPOSED ONE-LINE DIAGRAM - PHASE 1 <br />ED050-1 FLOOR PLAN ELECTRICAL DEMOLITION <br />ES100-1 ELECTRICAL SITE PLAN - PHASE 1 <br />EL101-1 FLOOR PLAN LIGHTING <br />EP102-1 FLOOR PLAN POWER <br />ER100-1 OVERALL ROOF PLAN ELECTRICAL <br />E-400-1 ELECTRICAL DETAILS <br />E-401-1 ELECTRICAL DETAILS <br />E-601-1 ELECTRICAL PANEL SCHEDULES <br />E-602-1 ELECTRICAL SCHEDULES CERTIFICATE OF COMPLIANCE <br />SHEET INDEX - PENETRATIONS <br />SHEET <br />NUMBER SHEET NAME <br />Penetrations <br />I-001-1 ROOF & CEILING PENETRATION DETAILS <br />I-002-1 WALL PENETRATION DETAILS <br />SHEET INDEX - REFRIGERATION <br />SHEET <br />NUMBER SHEET NAME <br />R-001-1 REFRIGERATION COVER SHEET <br />RD100-1 FLOOR PLAN - DEMOLITION <br />RR100-1 ROOF PLAN - REFRIGERATION <br />NO. DATE DESCRIPTION <br />A 04/02/2024 ISSUED FOR PERMIT AND <br />CONSTRUCTION <br />B 09/04/2024 BULLETIN #2 - PHASE 1 <br />C 11/05/24 BULLETIN #3 - PHASE 1 <br />D 01/07/2025 BULLETIN #5R1 - PHASE 1 <br />PHASE 1 <br />SHEET INDEX - BY OTHERS - FOR REFRENCE ONLY <br />SHEET <br />NUMBER SHEET NAME <br />Building <br />A1-0 EXISTING SITE PLAN <br />A-2 EXISTING FLOOR PLAN <br />C-012 STRIPING PLAN <br />C-013 STRIPE DETAILS <br />C-700 PROPOSED SITE PLAN <br />FA-100 FIRE ACCESS PLAN COVER <br />FA-101 FIRE ACCESS PLAN <br />FA-102 FIRE ACCESS PLAN SPECS. <br />B <br />NOTE: <br />SEE G-003-1 & G-004-1 FOR LIFE SAFETY <br />PLANS AND OCCUPANCY LOADS <br />SEE G-005-1 FOR ADDITIONAL CODE <br />RELATED INFORMATION SUMMARY <br />C <br />D <br />00- <br />REGISTEREDP ROFESSIONALENGINEER67268 RICHARDMAURICETHIBEAULT <br />STATEOF CALIFORNIACIVIL <br />1/7/25 <br />Bldg #'s 101120904-06 <br />Elect #'s 20184030-31 <br />Plumb #30147790 <br />Mech # 40139535 <br /> <br />APPROVALS: <br />PLNG - N. Tran <br />BLDG/ELECT/MECH/PLUMB - CSG <br />POLICE - B. Martin <br />PUBLIC WORKS - B. Sarlak <br />2350 S Pullman St - <br />Phase I3/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.