Laserfiche WebLink
VV <br />INSTALL NEW 8' X 10' X 3" PRECAST SLAB ON TOP 7'-10" X 4'-10" X <br />3'-6" D PRECAST BOX SECTION SET ON TOP A 6"D X 12"W <br />CONCRETE FOOTING. REFERENCE "SOUTHERN CALIFORNIA <br />EDISON (SCE) - UNDERGROUND STRUCTURES STANDARDS <br />(UGS).pdf" REFER TO SS 530 PRECAST SLAB BOX FOR 3 PHASE <br />PAD-MOUNTED TRANSFORMERS UP TO 1,000 KVA SECTION <br />BEGINNING ON PAGE 363. <br />EX. POLE 4453986E TO BE REMOVED BY SCE. <br />REFER TO SOUTHERN CALIFORNIA EDISON <br />COMPANY DESIGN/DWG.NO. 1144583_0.01. <br />REMOVE/ABANDON SERVICE LATERAL. <br />REMOVE SERVICE ENTRANCE <br />CONDUCTORS. CAP/SEAL RACEWAYS. <br />REMOVE TRANS./VAULT. <br />EX. SERVICE ENTRY, METERING, DISCONNECT, AND <br />DISTRIBUTION SECTIONS. DEMOLISH METERING AND MAIN <br />BOLTED PRESSURE SWITCH. INSTALL CUSTOM UL LISTED <br />TERMINATION SECTION MATCHING THE DISTRIBUTION BUSSING. <br />INSTALL NEW METERING AND 1200A INSULATED CASE CIRCUIT <br />BREAKER IN NEMA 3R ENCLOSURE W/BOTTOM ENTRY LINE SIDE <br />CONNECTIONS AND TOP EXIT LOAD SIDE CONNECTIONS. <br />INSTALL NEW CONCRETE ENCASED SECONDARY FEEDER (4 <br />SETS OF 4"C, EACH W/4-350 KCMIL & #3/0G). <br />INSTALL NEW SURFACE MOUNTED SECONDARY FEEDER (4 <br />SETS OF 3" C, EACH W/4-350 KCMIL & #3/0G). <br />NEW 1000 KVA SERVICE TRANSFORMER BY SCE. <br />NEW SERVICE LATERALS BY SCE <br />(TRANSMISSION DIVISION). <br />TO NEW PULL BOX X5539788. <br />REFER TO SOUTHERN <br />CALIFORNIA EDISON <br />COMPANY DESIGN/DWG. <br />NO. 1144583_0.01. <br />(1) INSTALL 5" CONDUIT FROM PRIMARY <br />SECTION OF VAULT. PROVIDE BEND FOR <br />SCE INSTALLATION. COORDINATE <br />REQUIREMENTS WITH SCE AND PROVIDE <br />CONCRETE ENCASEMENT PER SCE <br />STANDARDS. <br />REMOVABLE BOLLARD. COORDINATE BARRIER PROTECTION <br />REQUIREMENTS WITH "SCE UNDERGROUND INSPECTOR" AND <br />OBTAIN PRE-APPROVAL PRIOR TO EQUIPMENT AND BOLLARD <br />INSTALLATION. <br />PROTECTIVE BOLLARD/SCREENING LAYOUT <br />IS PRELIMINARY AND FOR BIDDING <br />PURPOSES ONLY. COORDINATE BARRIER <br />PROTECTION REQUIREMENTS WITH "SCE <br />UNDERGROUND INSPECTOR" AND OBTAIN <br />PRE-APPROVAL PRIOR TO EQUIPMENT AND <br />BOLLARD INSTALLATION. <br />3' - 7" <br />LOCATE BUILDING PENETRATION AND EXISTING SITE LIGHTING <br />CIRCUIT. REMOVE ASSOCIATED BRANCH CIRCUITING BACK TO <br />SOURCE. EXTEND SITE LIGHTING CIRCUIT (3/4"C, 2#10, #10G) <br />FROM NEW BREAKER TO NEW 12" X 12" QUAZITE JUNCTION BOX <br />INSTALLED FLUSH WITH GRADE. CONTROL SITE LIGHTING <br />CIRCUIT VIA NEW TIME CLOCK SPECIFIED IN CIVIL DESIGN. <br />EXTEND SITE LIGHTING CIRCUIT (3/4"C, 2#8, <br />& #10G) FROM NEW 12" X 12" QUAZITE <br />JUNCTION BOX TO NEW FIXTURE <br />LOCATIONS. REFER TO CIVIL SITE PLAN <br />AND LIGHTING DESIGN BY OTHERS <br />INCLUDING FINAL LOCATIONS OF FIXTURES. <br />POLE W/SINGLE HEAD LIGHTING FIXTURE. VERIFY POLE BASE, <br />POLE HEIGHT AND MOUNTING DETAILS WITH DESIGN BY <br />OTHERS (TYPICAL OF 3 LOCATIONS). <br />BUILDING MOUNTED SITE LIGHTING FIXTURE. <br />VERIFY MOUNTING HEIGHT AND DESIGN <br />WITH OTHERS. CONNECT TO SAME CONTROL <br />CIRCUIT AS POLE MOUNTED LIGHTING <br />HEADS (3/4"C, 2#8, & #10G) VIA EXTERIOR <br />LIGHTING CONTROL SYSTEM. <br />LOCATE BUILDING PENETRATION AND EXISTING SITE LIGHTING <br />CIRCUIT. <br />LOCATE AND DEMOLISH EXISTING LIGHTING IN THIS AREA. <br />REMOVE ASSOCIATED BRANCH CIRCUITING BACK TO SOURCE. <br />EXTEND NEW CIRCUIT (3/4"C, 2#8, #10G) FROM NEW BREAKER <br />TO NEW 12" X 12" QUAZITE JUNCTION BOX INSTALLED FLUSH <br />WITH GRADE. CONTROL SITE LIGHTING CIRCUIT VIA NEW TIME <br />CLOCK SPECIFIED IN CIVIL DESIGN. EXTEND BRANCH CIRCUIT <br />(3/4"C, 2#8, #10G) TO NEW FIXTURE LOCATIONS. REFER TO <br />CIVIL SITE PLAN AND LIGHTING DESIGN BY OTHERS INCLUDING <br />FINAL LOCATIONS OF FIXTURES. <br />POLE W/SINGLE HEAD LIGHTING FIXTURE. VERIFY <br />POLE BASE, POLE HEIGHT AND MOUNTING DETAILS <br />WITH DESIGN BY OTHERS (TYPICAL OF 2 LOCATIONS). <br />PROVIDE SCREENING SYSTEM INTEGRATED <br />WITH BOLLARD PROTECTION. <br />NEW 12" X 12" QUAZITE JUNCTION BOX. INSTALL FLUSH WITH <br />GRADE. <br />PROVIDE NEW BUILDING PENETRATION IN THIS APPROXIMATE <br />LOCATION FOR NEW CIRCUITS (DRAIN PUMP/ FUTURE PUMP/ <br />IRIGATION SYS.) ASSOCIATED WITH CIVIL DESIGN BY OTHERS . <br />IRRIGATION SYSTEM LOCATION - REFER TO CIVIL DESIGN BY <br />OTHERS. EXTEND 20A/1P 120V CIRCUIT FROM PANEL "L10". <br />VERIFY LOAD, VOLTAGE DROP, AND PENETRATION <br />REQUIREMENTS PRIOR TO INSTALLATION. <br />INCOMING <br />SECTION OF <br />EXISTING <br />NEMA 1 <br />SWITCHGEAR. <br />NEW 1000KVA SERVICE TRANSFORMER BY <br />SCE (13.2KV PRIMARY / 480/277V SECONDARY). <br />NEW 5" SERVICE CONDUIT AND BEND. CONNECT <br />TO NEW UNDERGROUND SERVICE LATERAL BY <br />SCE (TRANSMISSION DIVISION). PROVIDE <br />CONCRETE ENCASEMENT PER SCE STANDARDS. <br />METERING & 1200A INSULATED CASE CIRCUIT <br />BREAKER IN NEMA 3R ENCLOSURE. <br />CONTRACTOR'S SUBMITTAL IS TO BE <br />PROVIDED AS SOON AS POSSIBLE AND <br />UTILITY PRE-APPROVAL IS REQUESTED IN <br />ORDER TO MINIMIZE DELAY IN SCHEDULING <br />THE NEW SERVICE INSTALLATION. <br />NEW 8' X 10' X 3" PRECAST SLAB. <br />NEW 4'-10" X 3'-6" D PRECAST <br />BOX SECTION. <br />NEW 6"D X 12"W CONCRETE FOOTING. <br />METERING AND <br />DISCONNECT <br />SECTION OF <br />EXISTING <br />NEMA 1 <br />SWITCHGEAR. <br />DISTRIBUTION <br />SECTION OF <br />EXISTING <br />NEMA 1 <br />SWITCHGEAR. <br />SCE TO REMOVE 1000KVA SERVICE <br />TRANSFORMER (13.2KV PRIMARY / 480/277V <br />SECONDARY). <br />PULL EXISTING SERVICE CONDUCTORS, <br />ABANDON/CAP/SEAL UNDERGROUND <br />CONDUITS. <br />REMOVE PRECAST SLAB. <br />REMOVE PRECAST BOX SECTION. <br />REMOVE CONCRETE FOOTING. <br />GRADE. <br />EXISTING SERVICE LATERAL & EXISTING POLE <br />LINE TO BE REMOVED/ABANDONNED BY SCE.NEW SERVICE CONDUCTORS (4 SETS OF <br />CONCRETE ENCASED 4" CONDUITS) EACH <br />CONTAINING (4) 350 KCMIL AND #3/0G. <br />NEW FEEDER (4 SETS OF 3" CONDUITS) EACH <br />CONTAINING (4) 350 KCMIL AND #3/0G. <br />NEW CONCRETE SLAB. <br />INCOMING <br />METERING <br />OUTGOING <br />EX. SERVICE ENTRY, METERING, DISCONNECT, AND <br />DISTRIBUTION SECTIONS. DEMOLISH METERING <br />AND MAIN BOLTED PRESSURE SWITCH. INSTALL <br />CUSTOM UL LISTED TERMINATION SECTION <br />MATCHING THE DISTRIBUTION BUSSING. <br />MAIN BREAKER <br />E-400-1 <br />A <br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET NUMBER <br />THE INFORMATION CONTAINED ON THIS AND ANY <br />RELATED DOCUMENT SHALL NOT BE USED FOR <br />ANY PURPOSE OTHER THAN THE CONVEYANCE <br />OF INFORMATION FOR THE STATED CLIENT AND <br />PROJECT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF THE ENGINEER. <br />ANY INFORMATION TRANSFERRED OR UTILIZED <br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR <br />REFERENCE ONLY <br />WEBBER/SMITH Associates, Inc. <br />20 Wright Avenue <br />Lititz, Pennsylvania 17543 <br />Phone: 717.625.4140 <br />Email: info@webbersmith.com <br />SHEET TITLE: <br />FOR <br />DRAWING STATUS <br />FINAL <br />PROJECT NUMBER <br />www.webbersmith.com <br />SEAL <br />ES100-1 <br />DLJ <br />SEL <br />3/8/2024 <br />ELECTRICAL SITE <br />PLAN <br />2350 Pullman WSS OCTA Aspire <br />Bakeries <br />2350 Pullman Street <br />Santa Ana, CA 92705 <br />CA <br />5387 <br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved <br />2350 <br />Pullman,LLC <br /> 1" = 20'-0"ES100-1 <br />1 ELECTRICAL SITE PLAN - PHASE 1 <br />NO SCALEES100-1 <br />A SERVICE ENTRANCE RISER DIAGRAM <br />LOAD SUMMARY TABLE (KVA) <br />EXISTING PEAK LOAD <br />BUILDING EXPANSION <br />ELECTRIC VEHICLE STATIONS <br />ANTICIPATED PEAK LOAD <br />500 <br />109 <br />0 <br />614 <br />SITE LIGHTING 5 <br />NO. DATE DESCRIPTION <br />A 3/8/2024 ELECTRICAL UTILITY DESIGN <br />B 04/02/2024 ISSUED FOR PERMIT AND <br />CONSTRUCTION <br />B <br />B <br />B <br />B <br />B <br />B <br />REGISTEREDPROFESSIONALENGINEER24467 <br />STEPHEN E LASLO <br />STATE OF CALIFORNIAELECTRICAL <br />4/2/24 <br />2350 S Pullman St - <br />Phase I3/4/2025