Laserfiche WebLink
RTU-1 <br />L10-1 <br />J <br />F <br />H6 <br /> <br />( <br />E <br />X <br />) <br />- <br />1 <br />4 <br />, <br />1 <br />6 <br />, <br />1 <br />8 <br />H6 <br /> <br />( <br />E <br />X <br />) <br />- <br />2 <br />6 <br />, <br />2 <br />8 <br />, <br />3 <br />0 <br />NOTE 1 <br />F <br />H6 <br /> <br />( <br />E <br />X <br />) <br />- <br />2 <br />0 <br />, <br />2 <br />2 <br />, <br />2 <br />4 <br />NOTE 1 <br />NOTE 2 <br />L1 <br />0 <br />- <br />1 <br />GFI WP <br />48"AFF <br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET NUMBER <br />THE INFORMATION CONTAINED ON THIS AND ANY <br />RELATED DOCUMENT SHALL NOT BE USED FOR <br />ANY PURPOSE OTHER THAN THE CONVEYANCE <br />OF INFORMATION FOR THE STATED CLIENT AND <br />PROJECT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF THE ENGINEER. <br />ANY INFORMATION TRANSFERRED OR UTILIZED <br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR <br />REFERENCE ONLY <br />WEBBER/SMITH Associates, Inc. <br />20 Wright Avenue <br />Lititz, Pennsylvania 17543 <br />Phone: 717.625.4140 <br />Email:info@webbersmith.com <br />SHEET TITLE: <br />FOR <br />DRAWING STATUS <br />FINAL <br />PROJECT NUMBER <br />www.webbersmith.com <br />SEAL <br />ER100-1 <br />DLJ <br />SEL <br />04/02/2024 <br />OVERALL ROOF <br />PLAN ELECTRICAL <br />2350 Pullman WSS OCTA Aspire <br />Bakeries <br />2350 Pullman Street <br />Santa Ana, CA 92705 <br />CA <br />5387 <br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved <br />2350 <br />Pullman,LLC <br /> 3/32" = 1'-0"ER100-1 <br />1 OVERALL ROOF PLAN ELECTRICAL - PHASE 1 <br />NOTES: <br />1. INSTALL 125A/3P BREAKER IN EXISTING PANEL H6 AND UPDATE PANELBOARD DIRECTORY. EXTEND POWER CIRCUITS TO CU-1 ON ROOF. EXTEND POWER <br />CIRCUITS FROM CU-1 ON ROOF TO EXISTING AIR UNITS. VERIFY FINAL SUPPORT REQUIREMENTS WITH REFRIGERATION SUBMITTALS, INCLUDING BREAKERS, <br />BRANCH CIRCUITING, VOLTAGE DROP, LOCATIONS, AND CIRCUIT ROUTING WITH REFRIGERATION CONTRACTOR. <br />2. REUSE 30A/3P BREAKER IN EXISTING PANEL H6 AND UPDATE PANELBOARD DIRECTORY. EXTEND POWER CIRCUIT TO RTU-1 ON ROOF.VERIFY FINAL <br />SUPPORT REQUIREMENTS WITH MECHANICAL SUBMITTALS, INCLUDING BREAKERS, BRANCH CIRCUITING, VOLTAGE DROP, LOCATIONS, AND CIRCUIT ROUTING <br />WITH MECHANICAL CONTRACTOR. <br />NO.DATE DESCRIPTION <br />A 04/02/2024 ISSUED FOR PERMIT AND <br />CONSTRUCTION <br />REGISTERED PROFESSIONAL ENGINEER24467 <br />STEPHEN E LASLO <br />STATE OF CALIFORNIA <br />4/2/24 <br />2350 S Pullman St - <br />Phase I3/4/2025