Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br /> PROJECT TITLE <br /> <br />16 <br />The following table shows the required minimal thickness of steel plate bridging for a given <br />trench width: <br /> Trench Width Minimum Plate Thickness <br /> 1 foot-11 inches ¾ inch <br /> 2 feet-7 inches 7/8 inch <br /> 3 feet-5 inches 1 inch <br /> 5 feet-3 inches 1 ¾ inch <br />A Rough Road sign (W8-8) with black lettering on an orange background shall be used in <br />advanced of steel plate bridging. This is to be used along with any other required construction <br />signing. <br />SECTION 6 - PROSECUTIONAND PROGRESS OF THE WORK <br />6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK <br />6-1.1 Construction Schedule <br />Add the following to this subsection: <br />A working day shall be defined as outlined below, and the Contractor’s activities shall be <br />confined accordingly: <br />1. From 9:00 a.m. to 3:00 p.m., Monday through Friday, for work requiring temporary <br />lane closures, i.e. those having less than a 24-hour duration, and for work at major <br />intersections. As an alternative, construction at major intersections may be permitted <br />on Fridays, at night or on weekends, at the discretion of the Engineer. <br />2. From 7:00 a.m. to 5:00 p.m., Monday through Friday, within work areas having either <br />no lane closures or having continuous lane closures, i.e. 24-hour closures lasting more <br />than one day. For work in, or adjacent to, residential areas, work shall not commence <br />prior to 8:00 a.m. <br />Deviation from these hours/days shall not be permitted without the prior consent of the Engineer, <br />except in emergencies involving immediate hazard to persons or property, or as specified <br />otherwise. <br />Holidays as herein referred to shall be deemed to be: <br /> New Year’s Day <br /> Martin Luther King Day <br /> President’s Day <br /> Memorial Day <br /> Independence Day <br /> Labor Day <br /> Veteran’s Day <br /> Thanksgiving Day and the day after <br /> Christmas Eve through New Year’s Day <br />In addition to the holidays listed above, the City has a holiday moratorium; refer to City of Santa <br />Ana Standard Plan No. 1160. <br />505 E Central Ave <br />#B11/6/2024