Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />34 <br />Evaluation of Sand Equivalent and Cleanness Value results shall conform to the <br />provisions of Subsections 200-1.4 and 200-1.5. <br />All cement to be used or furnished on this Project shall be Type II low alkaline Portland <br />cement conforming to ASTM C150. <br />1.13 CONCRETE CURBS, GUTTERS, WALKS, RAMPS, DRIVEWAY APPROACHES, <br />ALLEY APRONS, AND CROSS GUTTERS <br />This Section shall conform to Sections 201, 303 and 400 of the Standard Specifications <br />and these Special Provisions. <br />Curbs and/or gutters to be constructed shall match existing in all dimensions and shall <br />conform to City of Santa Ana Standard Plan No. 1101. Reconstructed curb and gutters <br />shall be constructed so the top of curb matches the sidewalk surface elevation. When the <br />plans do not show replacement limit stations, the Engineer shall approve replacement <br />limits. Prior to acceptance of the curb and gutter construction by the Engineer, a flow test <br />shall be conducted by the Contractor in the presence of the Engineer. <br />Curb depressions for driveway approaches and sidewalk thickness across driveway shall <br />be in accordance with City of Santa Ana Standard Plan No. 1112 in lieu of dimensions <br />indicated in Section 303-5.1.3 of the Standard Specifications. <br />Alley and alley apron shall conform to City of Santa Ana Standard Plan No. 1111. <br />All culvert openings encountered when replacing curb and gutter shall be reconstructed <br />per City of Santa Ana Standard Plan No. 318 or 319. <br />During construction of driveway approaches, the Contractor shall maintain access to each <br />business at all times. In some cases, construction of one-half of a driveway approach at a <br />time may be required. <br />Sidewalks in the parkway designated for replacement shall be replaced at the same width <br />as existing unless otherwise specified and shall conform to City of Santa Ana Standard <br />Plan No. 1104. Sidewalk replacement shall include removing all existing materials <br />below existing sidewalk to make necessary to construct new sidewalk. <br />Curb ramps shall conform to City of Santa Ana Standard Plan No. 1122 unless otherwise <br />specified. <br />All new concrete shall be placed within five (5) working days after removal of existing <br />concrete. <br />All concrete work shall be finished in texture, scoring, banding in generally the same <br />manner as the adjacent existing improvements, unless specified. <br />505 E Central Ave <br />#B11/6/2024