My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />38 <br />All valve box frame and covers shall require PCC collars and shall be adjusted to finished <br />grade following paving operations. <br />PCC pavement for gate collars shall conform to Sections 400, 200, 201, and 302 of the <br />Standard Specifications and these Special Provisions. <br />PCC used for gate collars construction shall be minimum class 560-A-3250. In addition <br />to these minimum requirements, the concrete shall possess the following characteristics: <br /> Flexural strength at 28 days: 550 p.s.i. min. <br /> Flexural strength at 7 days: 430 p.s.i. min. <br /> Compressive strength at 7 days: 2500 p.s.i. min. <br />All cement to be used or furnished on this Project shall be Type II low alkaline Portland <br />Cement conforming to ASTM C150. <br />At any locations where the existing riser sleeve between the valve box and the valve- <br />operating nut is a 6” diameter pipe or smaller, the Contractor shall excavate and replace it <br />with an 8” diameter SCH. 40 PVC pipe. Backfill around riser pipe shall be compacted to <br />90 percent relative compaction. The riser sleeve shall be kept clean and free of dirt or <br />debris to provide clear access to the valve-operating nut. <br />AGENCY Manholes <br />AGENCY utility manhole frames and covers shall be adjusted to grade with PCC collar <br />in accordance with the respective Standard Plans. <br />The Contractor shall cooperate with the owners of any frames and covers and shall cover <br />and completely protect said frames and covers with heavy plastic or other suitable <br />material. <br />1.19 PULVERIZE & CEMENT-TREAT EXISTING ASPHALT CONCRETE, BASE, AND <br />SUBGRADE <br />General <br />This work shall conform to the Standard Specifications Section 301-3 “PORTLAND <br />CEMENT TREATED MIXTURES” and consist of pulverizing existing asphalt concrete <br />surfacing & underlying base materials, mixing with Portland cement & water, spreading <br />& compacting, and grading & curing the mixture to conform to the requirements <br />specified. <br />Materials <br />Existing asphalt concrete surfacing shall be ripped and pulverized with underlying base <br />materials and subgrade soil to the specified depths and widths in conformance to the <br />Project Plans and Special Provisions. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.