My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />39 <br />The asphalt concrete surfacing and underlying base materials shall be pulverized such <br />that 100 percent of the material will pass a two-inch sieve and a minimum of 90-percent <br />will pass a one and one-half-inch sieve. All materials other than rock and pulverized <br />asphalt concrete shall be broken up such that these materials will pass a one inch sieve. <br />The pulverized material shall be shaped and rolled to the specified cross sections. The <br />Engineer shall check and verify the conformance of the material to the lines, grade, and <br />elevation as shown on the plans, prior to beginning cement treatment. <br />Trimming and disposal of excess material, if required, will be performed on the intimate <br />mixture of pulverized asphalt concrete, base materials and subgrade soil prior to cement <br />treatment. <br />Portland cement shall be Type II Modified, conforming to the requirements of Section <br />201-1.2.1 "Portland Cement,” of the Standard Specifications. Pozzolanic material shall <br />not be substituted for Portland Cement. <br />Water shall conform to the provisions in Section 201-1.2.3, "Water,” of the Standard <br />Specifications. <br />Cement Application <br />Cement shall be uniformly spread by mechanical equipment at a spread rate necessary to <br />meet the cement content specified on the plans for the various areas to be treated. <br />The cement content shall be 5% (five-percent) based on the dry unit weight of the <br />pulverized material. The dry unit weight of the pulverized material shall be determined <br />by California Test 312 (Design and Testing of Classes A and B Cement Treated <br />bases). The Engineer may order an increase or decrease in the specified cement content <br />when conditions warrant such action. For cost estimate purposes, use 130 pounds/cubic <br />feet for the dry unit weight of pulverized material. <br />The quantity of Portland cement added to the pulverized material for cement treatment <br />shall meet the following requirements when evaluated in conformance with the <br />provisions in Section 400-1.4, Statistical Testing, of the Standard Specifications. <br />1. The average of the test results for the cement content from each sampling station <br />shall vary no more than 0.6-percent under not more than 1.0-percent over the <br />specified cement content. <br />2. The moving average of the test results shall be at least the specified cement <br />content. <br />Cement shall not be spread upon the prepared material more than one hour prior to the <br />mixing operation. No traffic other than the mixing equipment shall be allowed to pass <br />over the spread cement until the mixing operation is completed. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.