Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />40 <br />Mixing In Place <br />This work consists of mixing in place the pulverized asphalt concrete, underlying base <br />material, and subgrade soil with Portland Cement and water; then spreading, compacting, <br />trimming, and curing the mixture to the lines, grade, and elevation as established by the <br />Project Plans and Special Provisions. <br />The cement treated mixture shall be constructed utilizing a machine or a combination of <br />machines that will produce results meeting all the requirements herein. The mixing <br />machine(s) shall be equipped with controlled water distributing equipment and water <br />shall be applied under pressure. Leakage of water shall not be permitted. Care shall be <br />exercised to avoid the addition of any excess water. Such equipment shall be approved <br />by the Engineer prior to use. <br />The treated mixture shall be uniform throughout and at least one pass of the mixing <br />equipment shall be made before mixing water is added to the material. <br />The engineer shall be the sole judge as to the number of passes required by the mixing <br />equipment prior to the addition of the mixing water. <br />The percentage of moisture to be added to the pulverized material during the mixing <br />operation shall be the amount necessary to assure a uniform and intimate mixture of the <br />materials. It shall not exceed by more than one percent the optimum moisture content as <br />determined by California Test 312. <br />Subsequent to the addition of water, sufficient passes shall be made by the mixing <br />equipment to produce a uniformly treated material. Uniformity will be determined <br />initially by sampling and testing at variable depths and locations within the treated <br />material. <br />The number of required passes may be adjusted from time to time by the Engineer based <br />upon subsequent sampling and testing of the completed mixture. The engineer shall be <br />the sole judge as to the number of passes required by the mixing equipment following the <br />addition of the mixing water. <br />Where mixing equipment requires windrow operations, the material to be treated shall be <br />shaped and sized prior to the addition of cement. The windrow shall be limited to such <br />size that all material can be passed through the mixing machine at each operation. The <br />tops of windrowed material shall be flattened or slightly trenched to receive the cement. <br />Following the final mixing operation, the treated mixture shall be spread to the required <br />lines, grade, and elevation as shown on the plans. <br />Compacting and Finishing <br />The length of treated sections shall be regulated by the Contractor such that final <br />compaction of the mixture to the specified density shall be completed within 2-1/2 hours <br />after the initial application of water during the mixing operation. <br />505 E Central Ave <br />#B11/6/2024