My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />58 <br />F. PROPORTIONING DURING THE COLD RECYCLING OPERATION <br />Asphalt shall be metered or weighed into the mass of the cold milled material using a <br />mass flow, Coriolis Effect, type meter that will accurately measure the amount of <br />asphalt to within 0.2 percent of the amount required by the mix design or as adjusted <br />in the field. <br />G. CIREAM EQUIPMENT <br />General <br />CIREAM equipment shall be capable of milling and crushing or sizing the existing <br />asphalt pavement. The equipment used for mixing the cold millings with the liquid <br />asphalt and water shall be capable of producing a homogeneous and uniformly coated <br />recycled pavement mixture. The equipment used for placement of the recycled <br />pavement mixture shall be capable of placement to the lines, grades, and requirements <br />specified in these special provisions and shown on the plans. The Contractor shall <br />have available on the site of the work all equipment and materials to be used for <br />recycling operations. <br />CIREAM Equipment <br /> <br />1. Pavement Milling Machine <br /> <br />The pavement milling machine shall be self-propelled. The milling equipment <br />shall be capable of removing the existing pavement to the depths shown in the <br />plans. Milling equipment shall be equipped with automatic depth controls <br />capable of maintaining the cutting depth to within ¼-inch of the desired depth, <br />and shall have a positive means for controlling cross slope. The milling operation <br />shall not disturb or damage the underlying material. The use of a heating device <br />to soften the pavement will not be permitted. <br /> <br />2. Crushing or Sizing Equipment <br /> <br />Crushing or sizing equipment shall be capable of producing reclaimed asphalt <br />pavement to the size required prior to mixing millings with liquid asphalt. <br /> <br />3. Mixing and Proportioning Equipment <br /> <br />The CCPR mixing plant shall be capable of mixing the cold milled reclaimed <br />asphalt pavement, liquid asphalt, and water to produce a completely and <br />uniformly mixed, homogeneous recycled pavement mixture. <br /> <br />4. Pugmill <br /> <br />The CCPR mixing plant shall have a continuous pugmill mixer with a belt scale <br />or integrated microprocessor control system to control the mass of the cold milled <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.