CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />60 <br />I. CONSTRUCTION <br />No CIREAM work shall be performed during wet conditions, nor started if rain is <br />imminent when the work is to be performed. No recycling work shall be performed <br />unless the pavement temperature is a minimum of 50°F. Recycling operations other <br />than compaction shall be completed a minimum of two (2) hours before sunset. <br />Where possible, ½ inch of existing asphalt concrete shall be protected in place during <br />the grinding process to avoid exposure of existing subgrade. On street segments <br />where it is not feasible to retain ½ inch of existing subgrade, the Contractor shall <br />reduce the milled section or replace the proposed section as directed by the Engineer. <br />In areas where the CIREAM method is utilized and the recycled pavement is to be <br />placed on the existing milled pavement surface, it shall be verified that the milled <br />surface is firm and unyielding and there are no subgrade failure areas beneath the <br />milled surface that might compromise the integrity of the recycled pavement. When <br />CIREAM pavement is placed on a milled surface or adjacent to structures such as <br />curbs, concrete gutters, swales, planters, etc., these contact surfaces shall be swept of <br />all loose material to create a dry clean surface. A tack coat of SS -1h emulsion or <br />equivalent (0.05 gallon per square yard minimum) shall be applied to surface areas <br />prior to placing the recycled pavement. <br />J. SPREADING AND COMPACTION <br />Prior to pick up or placement in the paver, remove and dispose of all visible oversized <br />crack filler in the cold milled material or in the recycled pavement mixture. When a <br />paving fabric is encountered during the recycling operation, the Contractor shall make <br />the necessary changes in equipment or operations so that incorporation of the <br />shredded fabric in the recycled material does not affect gradation, or inhibit placing or <br />compaction of the recycled material. No fabric piece incorporated into the recycled <br />section shall have any dimension exceeding a length of two (2”) inches. The <br />Contractor shall be required to remove and properly dispose of oversized pieces of <br />paving fabric as directed by the Engineer. The recycled pavement mixture shall be <br />graded and compacted to the depth, lines, and grades established by the plans or <br />Engineer and as required by these special provisions. <br />The recycled pavement mixture shall exit from the mixing chamber in a manner that <br />prevents particle segregation. Care shall be exercised while spreading to avoid <br />segregation, tearing, or scarring of the final compacted surface. <br />Rolling shall commence at a time interval following the milling, mix ing, and <br />spreading of the recycled pavement mixture as determined by the mix design or <br />directed by the Contractor. Time intervals shall be based on ambient temperatures, <br />weather, and type of liquid asphalt. When possible, rolling shall not be started or <br />stopped on uncompacted material. <br />505 E Central Ave <br />#B11/6/2024