Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />61 <br />Compacting of the recycled pavement mixture shall be completed using rollers <br />meeting the requirements of these special provisions. The rolling pattern shall be <br />changed and a new rolling pattern shall be established when: <br /> Relative compaction cannot meet the requirements of these specifications. <br /> There are changes in recycled pavement mixture or proportions. <br /> There are changes in placement equipment or procedures. <br /> There is a significant change in temperature or weather conditions or <br />controlling factor. <br /> There is major displacement and/or cracking of the recycled pavement <br />mixture. <br />The final compacted surface of the recycled pavement mixture shall be free of ruts, <br />bumps, indentations, raveling, irregularities, or segregation and shall meet the <br />smoothness requirements of these specifications. Cold recycled asphalt concrete that <br />does not conform to these special provisions shall be reworked, re-compacted, or <br />removed and replaced at the Contractor's expense. <br />Initial Compaction <br />After compaction but prior to opening the roadway to traffic, the average in -place <br />density shall be determined based upon nuclear gage readings at random locations. <br />During in-place density testing of the compacted recycled pavement, the nuclear <br />gauge shall be set to the recycled section thickness. The average in-place density <br />shall be used to calculate the relative compaction for each lot. The relative <br />compaction shall be not less than 95 percent or greater than 105 percent of the <br />maximum density obtained in the test strip as required in these special provisions. If <br />additional rolling does not achieve relative compaction, a new rolling pattern shall be <br />established such that a new maximum density is determined. However, care should <br />be taken not to over-roll the mat based on visual observations of check cracking or <br />shoving. <br />After initial compaction has been achieved, and prior to opening the recycled <br />pavement mixture to traffic, the Contractor shall apply a fog seal of dilute (1:1) SS-1h <br />emulsion or equivalent at a rate of 0.08 to 0.12 gallon per square yard to all areas <br />opened to traffic. Immediately following application of the fog seal, the cold in -place <br />recycled pavement surface shall be covered with sand at a rate of 1.0 to 2.0 pounds <br />per square yard. The exact rate will be determined by the Contractor. Excess sand <br />shall be removed from the pavement surface by sweeping. Sand shall be free from <br />clay or organic material. <br />The recycled pavement shall remain in place prior to placement of the final surface <br />seal either: <br /> For a minimum of two (2) days and until there is less than 1.5 percent <br />moisture remaining in the cold in-place recycled pavement mixture; or <br /> A minimum of ten (10) days without rainfall. <br />505 E Central Ave <br />#B11/6/2024