Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />65 <br />B. REMOVAL <br />Existing striping, pavement markings, curb marking and raised pavement markers <br />superseded by the plans shall be completely removed. All conflicting striping within <br />limit of project shall be removed even if not shown on the plan. <br />Removal of all traffic striping and pavement markings shall be by grinding. All traffic <br />striping may be removed by wet sandblasting with the Engineer’s approval. Existing <br />pavement markings, which are removed by sandblasting with the Engineer’s <br />approval, shall be completely removed to the satisfaction of the Engineer. All <br />removal areas shall be slurry sealed by rubberized slurry seal. Slurry seal shall cover <br />from lane line to lane line unless directed otherwise by the engineer. <br />C. TEMPORARY STRIPING <br />The Contractor shall install reflectorized chip seal markers (single for 4” line, double <br />for 8” line) at 20 feet on center when on a taper or curve, and at 40 feet on center <br />elsewhere within 24-hours after paving the street for a maximum duration of 10 <br />calendar days. Contractor shall install temporary traffic striping if final striping has <br />not been installed by the end of the tenth (10th ) calendar day after paving the street <br />per City of Santa Ana Standard Plan Nos. 1125B-1 & B-2 (without the raised <br />pavement markers).Temporary traffic striping shall be in place for a maximum <br />duration of twenty-one (21) calendar days after paving the street, thereafter, Final <br />Striping shall be installed. All temporary traffic striping shall be installed for the <br />proposed traffic lane line configuration and only after approval of cat-tracking <br />by the City Engineer. Public traffic shall not be allowed on any multilane arterial <br />street without reflectorized chip seal markers, or temporary or permanent traffic <br />striping. Contractor shall notify the Engineer when the temporary traffic striping <br />and/or chip seal markers are installed and shall maintain them until final striping is <br />completely installed. <br />Maximum length of work zone with reflectorized chip seal markers or striped with <br />temporary traffic striping shall not exceed 1 mile in length, unless directed otherwise <br />by the engineer. <br />D. FINAL STRIPING <br />All final stripes, legends, including limit lines, shall be permanently striped within the <br />timeframes specified in Section 2.02 C above, and during a period of favorable <br />weather when the pavement surface is dry and above 50 degrees Fahrenheit. <br />Any existing striping to remain including striping on cross streets, which is disturbed <br />during construction, shall be re-striped as necessary or as directed by the Engineer, <br />even if not shown on the channelization plans. <br />All striping and related roadside signage shall be in place prior to opening the lane(s) <br />to public traffic. <br />505 E Central Ave <br />#B11/6/2024