My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />66 <br />All striping and related roadside signage shall be in place prior to opening the lane(s) <br />to public traffic. <br />E. THERMOPLASTIC <br />Thermoplastic traffic stripes, pavement markings, crosswalks and limit lines shall <br />conform to the provisions in Sections 84-1, “General,” and 84-2, “Thermoplastic <br />Traffic Stripes and Pavement Markings,” of the Caltrans Standard Specifications and <br />these special provisions. <br />Specifications for glass beads shall be “8010-004 (Type II).” Glass beads shall be <br />premixed within the thermoplastic material prior to application and also applied to the <br />surface of the molten thermoplastic striping material immediately following the <br />application of the thermoplastic. <br />Thermoplastic material shall conform to the requirements of Caltrans Specification <br />No. PTH-02ALKYD, for Thermoplastic Traffic Striping Material, White and Yellow. <br />The binder material shall be Alkyd. Copies of the Caltrans Specification No. PTH- <br />02ALKYD are available at the Caltrans Transportation Laboratory, Sacramento, <br />California. Thermoplastic material shall conform to the requirements of Caltrans <br />Specification No. PTH-02ALKYD. <br />Thermoplastic material for traffic stripes shall be applied by extrusion method in <br />single uniform layer at the minimum thickness of 40 mils and not to exceed 50 mils. <br />The Contractor shall not begin work until a written notice to proceed has been issued <br />by the Engineer. The Contractor shall notify the City of Santa Ana - Public Works <br />Agency Engineer a minimum of two working days prior to beginning the work to <br />coordinate the work. A schedule of the streets to be re-striped for each day shall be <br />provided to the Engineer one full workday prior to striping or re-striping any streets. <br />The Contractor shall adjust the thermoplastic application rate as necessary to achieve <br />the thermoplastic application rate stated above prior to striping. Thermoplastic <br />application rate tests (up to and including 5 thermoplastic application rate tests per <br />day, including the thermoplastic application rate test at the start of each workday) <br />may be conducted at random times and locations throughout each workday at the <br />discretion of the Engineer. <br />Thermoplastic Application Rate Testing <br />The paint application rate shall be determined by passing the striper over a metal <br />plate while the paint application system is operating. The flow of glass beads shall <br />be stopped while passing over the metal plate. The Engineer shall measure <br />thickness of the applied thermoplastic immediately after application of <br />thermoplastic on the metal plate. Striping shall not continue if the proper <br />thickness of thermoplastic is not being applied. Adjustments and corrective <br />measures shall be applied to insure that the correct thickness of thermoplastic will <br />be applied. Testing of the thermoplastic application rate, as described above, will <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.