My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />82 <br /> A pullout drawer shall be installed in the cabinet cage. The drawer shall be <br />17” long by 12” long wide by 1 ¾ in. deep. It shall have a hinged top that <br />covers the storage box area and also provides a smooth surface to write on. <br />d. Door Ajar Switch <br />This switch shall be provided within the cabinet to trigger the Alarm #1(C1- <br />54) input of the controller whenever the front door is opened. This switch <br />shall be a normally closed switch connected to apply a logic ground signal to <br />the J11-F position of Input File J. <br />e. C11P Harness <br />A harness shall be provided to access the signals available on the 2070 <br />Controller’s C11S Connector. The harness shall be a minimum of 4 ft in <br />length. The harness wire bundle shall be provided with external protection <br />and routed on the Input Panel Side of the Cabinet. The harness shall be <br />connectorized and be of adequate length to properly mate with a 2070 <br />Controller’s C11S connector and the other end shall be terminated as called <br />out on the following table. All unused signals shall be made available on <br />termination points within the cabinet for future use. <br />C11P Pin assignment: <br />PIN SOURCE FUNCTION TERM <br />1 O8-1 OUTPUT #56 * <br />2 O8-2 OUTPUT #57 * <br />3 O8-3 OUTPUT #58 * <br />4 O8-4 OUTPUT #59 * <br />5 O8-5 OUTPUT #60 * <br />6 O8-6 OUTPUT #61 * <br />7 O8-7 OUTPUT #62 * <br />8 O8-8 OUTPUT #63 * <br />9 DC GND DC GND DCG <br />10 I4-1 6-Ø2 I4-W <br />11 I4-2 6-Ø4 I8-W <br />12 I4-3 6-Ø6 J4-W <br />13 I4-4 6-Ø8 J8-W <br />14 DC GND DC GND DCG <br />15 I7-1 FUT 1 I1-W <br />16 I7-2 FUT 2 I5-W <br />17 I7-3 FUT 3 J1-W <br />18 I7-4 FUT 4 J5-W <br />19 I7-5 INPUT # 52 * <br />PIN SOURCE FUNCTION DCG <br />20 I7-6 INPUT # 53 * <br />21 I7-7 INPUT # 54 * <br />22 I7-8 INPUT # 55 * <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.