Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />89 <br />to the most likely point of interference and unless blocked by an impassable <br />obstruction, shall end at the closest upstream or downstream manhole or <br />cleanout structure. Under no circumstances shall the contractor deliver to <br />the City a video of a survey that was otherwise abandoned. If the camera <br />cannot pass the entire sewer reach from its point of insertion, the reach shall <br />be inspected from both directions. The consultant shall notify the City <br />immediately of any such obstruction so that it may be repaired or mitigated by <br />the City and/or the contractor and complete inspection of the pipe may <br />proceed. <br />Television inspection of sewer mains with high volumes of flow (pipe running <br />1/3 full or more) may, with prior consent of the City, be done at night between <br />the hours of 10 p.m. and 5 a.m. No added compensation shall be allowed for <br />night work. Notwithstanding, the consultant shall always use whatever <br />mechanical means are available, including modification or changing of <br />the camera wheels or treads, to insure that the image is recorded in an <br />upright, un-rotated position. The City reserves the right to reject any <br />videotape where changes in the orientation of the camera could have been <br />corrected by such modifications or by performing the work during periods of <br />low flow. <br />CCTV inspections shall be delivered in an electronic format (CD/DVD) to the <br />Engineer for review and approval. <br />Cost for video inspection if required, shall be considered as included in other <br />bid items. <br />4.16 PULL BOXES <br />Pull boxes shall conform to the provisions in Section 86-1.02C, “Pull Boxes,” and <br />Section 87-1.03C, “Installation of Pull Boxes,” of the Caltrans Standard Specifications, <br />Caltrans Standard Plan ES-8, and these Special Provisions. <br />Pull boxes' size shall be Number 6 except where shown otherwise on the plan or as <br />directed by the Traffic Engineer. Bottoms shall be bedded in crushed rock. Pull boxes <br />shall not be grouted. Pull boxes shall be polymer concrete reinforced with heavy-weave <br />fiberglass and plastic lining. Pull box covers shall be lightweight (Christy Fibrelyte, or <br />approved equal). <br />Pull boxes adjacent to Traffic Signal poles shall have 10 foot ground rod with ground <br />clamp and shall be fastened to bare grounding conductor from Traffic Signal pole. <br />New pull boxes shall not be installed within any curb access ramp. No new pull box shall <br />be located within five feet of a water meter or fire hydrant. <br />Replace sidewalk in-kind to match existing material, color, and pattern, from score mark <br />to score mark after pull boxes have been installed. <br />505 E Central Ave <br />#B11/6/2024