My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />88 <br />If a conduit is bored or jacked across existing sewer mains, the contractor shall conform <br />to the following requirements: <br />1. Pothole to determine location and depth of the sewer mains and laterals. <br />2. Visual confirmation by City Inspector shall be done during the boring/jacking of <br />the conduit across the sewer mains for any damages prior to back filling the <br />pothole. <br />3. If visual confirmation is not done, the contractor shall perform Video Inspection <br />of Sewer Mains and Laterals per the following specifications. <br />a. Video Inspection of Sewer Mains and Laterals <br />The contractor shall use CCTV equipment to verify that City sanitary sewer <br />mains have not been impacted. This includes all mains that appear on the plan <br />of construction drawings as possible points of interference, regardless of the <br />relative elevation of the sewer and what is believed to be the elevation of the <br />newly constructed facility. <br />The contractor shall use equipment specially designed and constructed for <br />sewer inspection and televising. The camera must have light sources of <br />suitable illumination output to provide a clear picture of the entire periphery <br />of pipe. The camera must be able to be rotated to a position that will assure <br />that the total periphery of the sewer is in focus at all times, regardless of the <br />diameter of the pipe being inspected. The camera, transport system, and other <br />components of the video system shall be capable of producing a picture <br />adequate for the purposes of the inspection as stated herein. Video runs <br />showing condensation or submersion of the lens, poor or out-of-focus images, <br />poor audio, or otherwise poor image quality shall be cause for rejection and <br />may necessitate re-televising at the consultant’s expense if the City determines <br />the video run is not of acceptable quality. <br />A cable footage counter, accurate to within one (1) foot in 1000 feet, shall be <br />used and shall be indicated on the monitor and recorded on the video. The <br />date of inspection, continuous forward and reverse readout of camera distance <br />from referenced access hole, the City supplied upstream and downstream <br />manhole identification number with an arrow indicating the direction of <br />flow, the size of the pipe, the name of the street, the time of day and the <br />project or location name as supplied by the City shall be displayed <br />continuously on the monitor and recorded on the video. The use of non- <br />standard or incorrectly numbered manholes by the contractor on the <br />video overlay is cause for rejection of the digital video and any costs <br />associated with re-videoing of the main that are necessitated by the <br />contractor’s failure to use designated naming conventions will be bor ne <br />entirely by the contractor. The footage relative to the center of the manhole <br />at the start of each run shall be set to accurately reflect a center of manhole <br />starting position of 0.00 feet regardless of where along the pipe and at what <br />footage the run begins. All video operations shall begin at a manhole adjacent <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.