Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />99 <br />Signal Interconnect Cable (SIC) shall be AWG#22 and conform to IMSA <br />Specification 40-2, REA Specification PE-39 and the following: <br />SIC shall not be spliced unless shown otherwise on the plan. The number of pairs to <br />be provided shall be as shown on the plans. The ends of unused SIC conductors shall <br />be folded back and taped securely to the cable <br />Where splicing is required, the Contractor is responsible for supplying the splice <br />closures and all accessories including bond connectors and proper end plates to <br />provide splices as recommended by the manufacturer. <br />Manufacturer recommended lubricant shall be applied to the cable to reduce friction <br />between the cable and the duct. Mechanical aids and pulling cable or ropes shall be <br />used as required. <br />Personnel shall be stationed at each cabinet, splice vault and/or pull box through <br />which the cable is to be pulled to observe and lubricate the cable. <br />At least ten feet of slack shall be provided at each pull box. The shield shall be <br />grounded at each trunk splice and at every terminus point. <br />The cable shall be securely fastened in-place within pull boxes, vaults, and/or <br />cabinets. <br />The cable shall not be stressed beyond the Manufacturer's minimum bending radius at <br />any time. <br />All exposed cable ends shall be protected from moisture ingress. <br />Following installation of the cable in the duct, all duct entrances at pull boxes, vaults <br />and cabinets shall be sealed with duct sealing compound to prevent the ingress of <br />moisture, foreign materials, and rodents. <br />Cable markers shall be used to identify the cable and pair-count. <br />The Contractor is responsible for all testing and documentation required to establish <br />approval and acceptance of the production, installation and operation of fabrication <br />materials and installation hardware. The following identifies the specific quality <br />control requirements for this specification. <br />Cables shall be tested at the factory to ensure the cable complies with the <br />specifications. <br />Reels of cable shall be tested for insulation breakdown and continuity prior to <br />installation in ducts. <br />As a post-installation check, the Contractor shall measure the continuity and <br />insulation breakdown of the cable pairs in each length of cable after installation, prior <br />505 E Central Ave <br />#B11/6/2024