Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />100 <br />to connection. The Contractor shall measure these parameters on a minimum of two <br />pairs selected by the Engineer. The same pairs shall not be measured on consecutive <br />lengths. <br />The Contractor shall record the reel number from which the cable came, the <br />identification of the pairs measured, and the results of continuity and insulation tests. <br />The Contractor shall carry out system integration testing to ensure that the twisted- <br />pair cables perform as specified when used in operation with equipment installed <br />under the contract. <br />Where splicing is required inside the pull box or splice vault, the Contractor is <br />responsible for supplying the splice kits and all accessories including bond connectors <br />and proper end plates to provide splices as recommended by the manufacturer. <br />Unless noted otherwise, splice kit shall be COYOTE Series manufactured by <br />Performed Line Products, www.preformed.com. All splicing shall be done by the <br />Contractor, the City will supply necessary wiring information or splicing diagram. <br /> <br />Individual wire splicing shall be done using weather resistant connector (AMP <br />Picabond Connector. <br />B. FIBER OPTIC CABLE <br />This work consists of installation of Single Mode Fiber Optic Cable per plan. <br />This work shall be in accordance with the Plans, Section 87-19, “Fiber Optic Cable <br />Systems,” of the Caltrans Standard Plans & Specifications and these Special <br />Provisions. <br />Each fiber optic cable for this project shall be Corning Cable Systems, ALTOS Lite <br />Gel-Free Cables, Single-Jacket/Single-Armor type, loose tube and contain single <br />mode (SM) dual-window (1310 nm and 1550 nm) fibers as shown on the Plans and <br />shall conform to these special provisions. <br />The drop cables shall be connectorized with SC connectors in the cabinets. This shall <br />require additional aramid strength members in the cable or the use of furcation tubing <br />at the terminus. <br />1. Quality Assurance Provisions <br />Documentation of factory test results shall be provided to the Engineer for <br />approval prior to shipping. <br />The attenuation of 100 percent of the fibers shall be tested by the Manufacturer <br />and certified as satisfying the requirements of this specification. A copy of the <br />test results for each fiber in the cable shall be provided with each reel of cable. <br />505 E Central Ave <br />#B11/6/2024