CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />101 <br />Attention is directed to "Fiber Optic Testing," elsewhere in these special <br />provisions. <br />The Contractor shall furnish a Manufacturer's certification that the fiber optic <br />cable materials proposed for use on this project will meet all applicable special <br />provisions. <br />The material shall not be installed in the field prior to the Engineer's approval. <br />2. Installation <br />Installation procedures shall conform to the procedures specified by the <br />Manufacturer of the specific cable being installed. <br />Prior to installing the optical fiber cable, the Contractor shall test the cable on the <br />shipping reel. The Contractor shall submit the manufacturer's recommended <br />procedures for pulling the fiber optic cable to the Engineer for review and <br />approval at least 20 working days prior to installing cables. Mechanical aids may <br />be used to assist cable installation. A tension measuring device or break away <br />swivel shall be placed between the end of the cable grip and the pull rope, to <br />ensure that the tension does not exceed 80 percent of recommended tension or <br />2225 N, whichever is less. The cable grips for installing fiber optic cable shall <br />have a ball bearing swivel to prevent the cable from twisting during installation. <br />The fiber optic cable shall be installed using a cable pulling lubricant <br />recommended by the fiber optic cable and/ the innerduct manufacturer and a non- <br />abrasive pull tape conforming to the provisions described under "Conduit" <br />elsewhere in these special provisions. Contractor’s personnel shall be stationed at <br />each splice vault and pull box through which the cable is to be pulled to lubricate <br />and prevent kinking or other damage. <br />During cable installation, the bend radius shall be maintained at a minimum of 20 <br />times the outside diameter of the cable. <br />Splices shall only be allowed at cable transitions, such as, changes in the size of <br />cables or at entry points for drop-cables. Splice closures shall be required at <br />every junction point and at every device being serviced by the fiber optic cable as <br />indicated on the fiber optic conductor schedules. At each splice closure, all <br />useable fibers in the cable shall be continuously spliced as indicated on the plans. <br />The end-to-end attenuation of the completed cable plant shall not exceed 8 dB <br />from the termination point of the fiber to the City of Santa Ana Traffic <br />Management Center. A minimum of 15 feet of slack shall be maintained on <br />either side of any splice enclosure. <br />Following installation of the cable in duct, all duct entrances in cabinets, pull <br />boxes and vaults shall be sealed with duct sealing compound to prevent the <br />ingress of moisture, foreign materials and rodents. <br />505 E Central Ave <br />#B11/6/2024