My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />108 <br />5.00 SPECIAL PROVISIONS - IRRIGATION, LANDSCAPING, & MAINTENANCE <br />PERIOD <br />5.01 IRRIGATION <br />GENERAL: <br />5.01.01 WORK INCLUDED <br />A. SUMMARY OF WORK <br />The Work of this Section includes all labor, materials, and equipment required to <br />complete work indicated on the drawings. <br />B. REGULATIONS <br />All local, municipal and state laws, and rules and regulations governing or relating to <br />any portion of this Work are hereby incorporated into and made a part of these <br />specifications, and their provisions shall be carried out by the Contractor. Anything <br />contained in these specifications shall not be construed to conflict with any of the <br />above rules and regulations or requirements of the same. However, when these <br />specifications and drawings call for or describe materials, workmanship, or <br />construction of a better quality, higher standard, or larger size than is required by the <br />above rules and regulations, the provisions of these specifications and drawings shall <br />take precedence. <br />C. SCHEDULE OF WORK <br />1. Verification of site conditions. <br />2. Physical layout. <br />3. Trenching. <br />4. Assembly of system. <br />5. Piping under roadways. <br />6. Connection to water supply. <br />7. Backfilling. <br />8. Adjustment of system. <br />9. Testing. <br />10. Clean up. <br />11. Inspection. <br />12. Record Drawings. <br />13. Guarantees. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.