My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />109 <br />5.01.02 APPROVALS <br />A. HARDSCAPE <br />All hardscape work shall be inspected and approved before start of any work of this <br />section. <br />B. UTILITIES <br />Prior to commencement of work, locate all electrical cables, conduits, and all utility <br />lines so that proper precautions may be taken not to damage such improvements. In <br />the event of a conflict between such lines and irrigation system locations, promptly <br />notify the Engineer who shall arrange for the relocation for one or the other. Failure <br />to follow this procedure places under the Contractor the responsibility for, at his own <br />expense, making any and all repairs for damages resulting from work hereunder. <br />C. COORDINATION <br />Coordinate installations of all sprinkler materials, including pipe, so there shall be no <br />interference existing with or difficulty in planting, trees, turf, or utilities and other <br />construction. <br />D. PERMITS <br />The Contractor shall obtain and pay for any and all permits and all inspections as <br />required. <br />E. GRADES <br />Carefully note all established grades before commencing work. Restore any <br />established grade changed during course of this work to original contours. <br />5.01.03 VERIFICATION OF DIMENSIONS AND QUANTITIES <br />A. QUANTITIES AND TYPES <br />Irrigation materials shall be furnished in the quantities and/or spacing as shown or <br />noted and shall be of the size and manufacture as indicated on the drawings and <br />specifications. <br />B. DIMENSIONS <br />All scaled dimensions are approximate. Before proceeding with any work, the <br />Contractor shall carefully check and verify all dimensions and quantities and shall <br />immediately inform the Engineer of any discrepancy between the drawings and/or the <br />specifications and actual conditions. No work shall be done in any area where there <br />is such a discrepancy until approval for same has been given by the Engineer. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.