Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />109 <br />5.01.02 APPROVALS <br />A. HARDSCAPE <br />All hardscape work shall be inspected and approved before start of any work of this <br />section. <br />B. UTILITIES <br />Prior to commencement of work, locate all electrical cables, conduits, and all utility <br />lines so that proper precautions may be taken not to damage such improvements. In <br />the event of a conflict between such lines and irrigation system locations, promptly <br />notify the Engineer who shall arrange for the relocation for one or the other. Failure <br />to follow this procedure places under the Contractor the responsibility for, at his own <br />expense, making any and all repairs for damages resulting from work hereunder. <br />C. COORDINATION <br />Coordinate installations of all sprinkler materials, including pipe, so there shall be no <br />interference existing with or difficulty in planting, trees, turf, or utilities and other <br />construction. <br />D. PERMITS <br />The Contractor shall obtain and pay for any and all permits and all inspections as <br />required. <br />E. GRADES <br />Carefully note all established grades before commencing work. Restore any <br />established grade changed during course of this work to original contours. <br />5.01.03 VERIFICATION OF DIMENSIONS AND QUANTITIES <br />A. QUANTITIES AND TYPES <br />Irrigation materials shall be furnished in the quantities and/or spacing as shown or <br />noted and shall be of the size and manufacture as indicated on the drawings and <br />specifications. <br />B. DIMENSIONS <br />All scaled dimensions are approximate. Before proceeding with any work, the <br />Contractor shall carefully check and verify all dimensions and quantities and shall <br />immediately inform the Engineer of any discrepancy between the drawings and/or the <br />specifications and actual conditions. No work shall be done in any area where there <br />is such a discrepancy until approval for same has been given by the Engineer. <br />505 E Central Ave <br />#B11/6/2024