My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />110 <br />C. LAYOUT <br />Due to the scale of the drawings, it is not possible to indicate all offsets, fittings, <br />sleeves, etc., which may be required. The Contractor shall carefully investigate the <br />finished conditions affecting all of his work and plan his work accordingly, furnishing <br />such fittings, etc., as may be required to meet such conditions. Drawings are <br />generally diagrammatic and indicative of the work to be installed. The work shall be <br />installed in the most direct and workmanlike manner, so that conflicts between <br />irrigation systems, planting and hardscape features will be avoided. <br />D. GRADES <br />The Contractor shall carefully check all grades to ensure it is safe to proceed before <br />starting work on the sprinkler system. <br />5.01.04 INSPECTION <br />A. GENERAL <br />All inspections herein specified shall be made by the Engineer. The Contractor shall <br />request inspection at least two days in advance of the time inspection is required. <br />B. INSPECTION REQUIREMENT <br />Inspection will be required for the following parts of the work: <br />1. Staked out layout of all pressure supply lines, routing, and location of sprinkler <br />heads. <br />2. Pressure test and trench depth prior to backfill. <br />3. Pressure test prior to start, at Point of Connection. <br />4. Coverage test upon sprinkler system completion. <br />5. Final inspection upon completion of job, after plant material is in place. <br />PRODUCTS: <br />5.01.05 MATERIALS <br />A. REQUIREMENTS <br />All materials and equipment listed on the drawings and specifications will be subject <br />to the following: <br />1. The Contractor shall furnish the articles, equipment materials, or processes <br />specified by name in the drawings and specifications. No substitution will be <br />allowed without prior written approval by the Engineer. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.