Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />120 <br />Q. FINAL INSPECTION <br />1. The Contractor shall show evidence to the Engineer that the Owner has received <br />all accessories, charts, record drawings, etc., as required before final inspection <br />can occur. <br />2. The final inspection of the work shall be made by the Engineer in the presence of <br />the Contractor at the time the work is completed. Notification shall be made in <br />writing by the Contractor seven (7) days in advance of such inspection. <br />5.01.07 GUARANTEE <br />The guarantee for the underground sprinkler system shall be made in accordance with <br />the attached form and shall be filed with the Owner or his representative prior to <br />acceptance of the irrigation system. <br /> <br />505 E Central Ave <br />#B11/6/2024