My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />130 <br />H. SAMPLES OF THE NATIVE SOIL shall be submitted to the soils testing laboratory <br />after rough grading and prior to soil preparation. For bidding purposes, the Contractor <br />shall provide the following soil amendments for soil preparation and backfill mix: <br />1. Soil preparation per 1,000 s.f. of planting area: <br />a. 4 cubic yards Nitrolized Redwood Sawdust <br />b. 200 lbs. Gro Power <br />c. 20 lbs. Soil Sulphur <br />2. Backfill Mix: <br />a. 6 parts by volume on-site soil <br />b. 4 parts by volume Nitrolized Redwood Sawdust <br />c. 18 lb. Gro Power per cu. yd. of mix <br />d. 2 lbs. Iron Sulphate per cubic yard of mix <br />EXECUTION: <br />5.02.15 EXAMINATION <br />A. VERIFICATION OF CONDITIONS: Inspect and accept the condition of the site <br />relative to this Section before commencing Work. If not acceptable, notify the Owner <br />in writing. By proceeding with the Work of this Section, the Contractor indicates his <br />acceptance of previous related work. <br />B. LANDSCAPE WORK SHALL NOT BEGIN until construction adjacent to planting <br />areas has been completed and irrigation systems have been installed and approved by <br />Engineer. <br />5.02.16 PREPARATION <br />A. PROTECTION: <br />1. Provide necessary safeguards and exercise caution against injury or defacement of <br />existing site improvements. <br />2. Be responsible for any damage resulting from landscape planting operations. <br />Repair damage and return the area to the previous condition at no cost to the <br />Owner. <br />5.02.17 WEED CONTROL <br />A. PRE-PLANTING HERBICIDE: Apply to visible weeds, before and after soil <br />placement. <br />B. PRE-EMERGENT WEED CONTROL: Apply pre-emergent weed immediately after <br />planting to control materials to planted areas that will not be seeded. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.