Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />136 <br />5. Pre-maintenance Walk-through - 5 days. <br />6. Final Walk-through - 5 days. <br />C. PRE-MAINTENANCE REVIEW: <br />1. At the completion of landscape planting operations and prior to the beginning of <br />the formal maintenance period, the Pre-Maintenance Review shall be held. <br />2. Request on-site review of Engineer five working days prior to the completion of <br />work in order that a mutually agreeable time for review may be arranged. <br />3. At the time of review, the areas under the Contract shall be free of weeds, dead <br />leaves and trash, neatly cultivated and raked. Stakes, guys and plant basins shall <br />be in good order. <br />4. If, after the Pre-Maintenance Review, Engineer is of the opinion that the Work <br />has been performed in accordance with the Drawings and Specifications, written <br />notice of preliminary acceptance will be given. This report will note any items <br />which must be corrected, and state the date of commencement and completion of <br />the formal maintenance period. <br />D. FINAL REVIEW: Perform Final Review in accordance with Section 5.03, <br />Landscaping & Irrigation Maintenance Period, at completion of 60 calendar day <br />maintenance. <br />5.02.24 CLEANING <br />A. Keep all areas of the Work clean, neat and orderly at all times during the period of <br />Contract. Clean construction areas at the end of each day <br />5.02.25 PROTECTION <br />A. The Contractor shall adequately protect the work, adjacent property and the public, <br />and shall be responsible for any damage, injury, or loss due to his acts or neglect. <br />B. The Contractor shall, at all times during construction, maintain safe pedestrian ways <br />around all areas of construction. This may require proper and adequate signs, fences, <br />barricades or other approved devices as required by the Engineer. <br /> <br />505 E Central Ave <br />#B11/6/2024