Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />142 <br />6.00 SPECIAL PROVISIONS - SANITARY SEWER IMPROVEMENTS <br />6.01 OPEN TRENCH OPERATIONS, EXCAVATION, BEDDING, AND BACKFILL <br />Open trench operations, excavation, bedding and backfill shall conform to the applicable <br />provisions of Section 306 of the Standard Specifications and these Special Provisions. <br />All trenches shall be base paved with hot mix or covered with steel traffic plates recessed <br />and flushed with existing pavement at the end of each working day. No temporary <br />pavement will be allowed. <br />Trenching operations shall not be allowed on more than one street at any time. Work <br />shall not be allowed in more than one intersection at any one time. <br />The third paragraph of Subsection 306-1.1.1 of the Standard Specifications is hereby <br />deleted and replaced as follows: <br />Excavation shall include the removal of all excess excavated materials and all <br />water and materials of any nature which interfere with the construction work. <br />All pavement removals shall be sawcut unless, approved otherwise by the Engineer prior <br />to commencement of work. <br />All removed pavement and excess excavated material shall be immediately disposed of <br />off the project site at a legal dumpsite at the Contractor's expense. <br />Pipe bedding and trench backfill shall be accomplished in accordance with the City of <br />Santa Ana Standard Plan No. 1150, these Special Provisions, and the trench details on the <br />construction drawings. For VCP sewers, the pipe zone and bedding material shall be ¾- <br />inch crushed rock. For VCP sewers in high groundwater conditions, the pipe zone and <br />bedding material shall be ½” crushed rock wrapped in geofabric (Mirafi 140N or <br />approved equal). For PVC pipe and ductile iron pipe sewers, the pipe zone and bedding <br />material shall be imported SE-30 sand. The trench zone backfill shall be Class II <br />aggregate base. <br />All material tickets (i.e. Sand, Class II Base, Crushed Rock, Asphalt, Concrete, etc.) shall <br />be given to the City Inspector on a daily basis. <br />No backfill shall be placed until the sewer pipe laid has been approved by the City <br />Inspector. <br />Crushed rock products shall be in accordance with subsection 200-1.2 and Table 200- <br />1.2(A) of the Standard Specifications. <br />The seventh and eighth paragraphs of Subsection 306-1.3.1 of the Standard <br />Specifications are hereby deleted and replaced with the following: <br />505 E Central Ave <br />#B11/6/2024