Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />156 <br />The grouting plan, and grout mix design shall be submitted to the Engineer for review <br />and approval prior to commencement of work. <br />6.14 ABANDON EXISTING MANHOLE STRUCTURES <br />The contractor shall abandon existing manhole structures in conformance to the Standard <br />Specifications Section 306-5, as specified herein, and as shown on the construction plans <br />and per City of Santa Ana Standard Plan No. 1209. <br />The contractor shall provide traffic control as required and approved by the agency <br />having jurisdiction. Under no circumstances shall the abandonment take place before <br />existing sewers and manholes are out of service and all flow directed to the new or <br />alternate pipes. <br />The manhole wall shall be removed to 18-inches below finished surface and be <br />completely removed and properly disposed of, unless otherwise shown. <br />The manhole base shall be perforated or cored through and filled with sand (SE 30 <br />minimum). <br />The manhole rim and cover shall be salvaged and delivered to the City of Santa Ana <br />Water Resources Division at 215 S. Center Street. <br />Existing pipe ends within manholes to be abandoned shall be plugged with concrete and <br />bricks per section 306-5. Concrete shall be Class C and bricks shall be a manhole brick as <br />specified in Section 202-1 of the Standard Specifications. <br />The contractor shall remove and replace all asphalt, concrete pavement, earthwork, <br />landscaping, or other surface damaged by the abandonment operations per an in <br />conformance with these provisions. <br />6.15 CONSTRUCT 4” OR 6” HIGH DENSITY POLYETHYLENE (HDPE) SEWER <br />LATERALS AND CLEANOUTS (PIPE BURST) <br />This work involves the installation of HDPE Pipe. Method of construction shall be via <br />trenchless pipe replacement installations. <br />The Contractor shall connect to the new sewer main and to the existing sewer lateral pipe <br />at the property line. The existing sewer lateral shall be depicted on the construction plans <br />based on the best information available. It is the Contractor’s responsibility to “locate <br />all points of connection for each new sewer lateral at both ends: the wye at the <br />public sewer main and the private connection point at property line where lateral <br />cleanout will be constructed.” The Contractor shall insert a push camera with <br />sounder/locator up the lateral from the main (insertion pit) to mark and locate the point of <br />connection at the property line. All locations points shall be marked in the field prior to <br />installation and construction of new sewer lateral. <br /> <br />505 E Central Ave <br />#B11/6/2024