Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />155 <br />slip resistance greater than 0.6 as described in ASTM C1028 Standard; and dimensional <br />tolerance of 1/16-inch. <br />The FRP frame and cover shall be designed to exceed AASHTO H-20 loading by a factor <br />of 2.5 (125,000 pounds) and shall meet AASHTO EN124 D400 loading (89,924 pound <br />which exceeds AASHTO Proof Load of 50,000 pounds for severe traffic service) proof <br />load on a 250 mm round plate for 30 seconds. Documentation of certified testing results <br />shall be submitted including complete Fatigue Loading Test with no loss of carrying <br />performance and no visible damage (apply 16,000 pound point load for 2,000,000 <br />cycles). The FRP frame and cover shall be provided with a five (5) year guarantee. <br />6.12 REMOVE EXISTING MANHOLE STRUCTURES <br />Removal of existing manholes shall be accomplished in accordance with the project <br />plans, City of Santa Ana Standards and Design Criteria, the applicable provisions of <br />Section 306 of the Standard Specifications, and these Special Provisions. <br />The following is added to the third paragraph of Subsection 306-5 of the Standard <br />Specifications: <br />The top six inches of backfilled subgrade shall be compacted to a relative <br />compaction of 90%. <br />6.13 ABANDON EXISTING SEWER MAIN <br />The Contactor shall abandon existing pipes per Section 306-5 of the Standard <br />Specifications, as specified herein, and as shown on the construction plans. <br /> <br />The Contractor shall provide traffic control as required and approved by the agency <br />having jurisdiction. Under no circumstances shall the abandonment take place before <br />existing sewers and manholes are out of service and all flow directed to the new or <br />alternate pipes. <br /> <br />The abandon pipes shall be filled with sand cement slurry 1-sack (941bs) of concrete. In <br />lieu of slurry, the contractor may use low density cellular concrete, Elastizell (EF) or <br />approved equal. <br /> <br />The Contractor shall demonstrate that the pipe to be abandoned has been completely <br />filled, without voids, by providing volume calculations for each placement of grout and <br />materials strength tests as required by the City. <br /> <br />The Contractor is responsible for the selection methods and material to be used. Pipe <br />abandonment shall be coordinated with the construction sequence. Appropriate plugs <br />shall be installed by the Contractor, and grout shall be injected in an upslope manner to <br />remove trapped air. Samples of the outgoing water (at the exit end) shall be made until <br />the existing grout mix is observed to be similar to the grout being injected at the inlet end. <br />505 E Central Ave <br />#B11/6/2024