My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />162 <br />sewer main prior to videoing in accordance with section 500-1.1.4 of the Standard <br />Specifications. <br />The scope of work includes the cleaning and videoing by means of remote CCTV. If a <br />blockage in the pipe hampers the CCTV work, then the Contractor shall attempt to <br />complete the CCTV work by televising from the opposite manhole (upstream or <br />downstream) of the location. The operator immediately shall notify the Contractor. Then, <br />the Contractor shall notify the Engineer. <br />CCTV inspections shall be delivered in an electronic format (DVD/USB drive) to the <br />Engineer for review and approval. <br />A. All Pipe Assessment & Certification Program (PACP) header information shall be <br />completed in accordance with the PACP Guidelines. <br />B. The documentation for the work shall consist of CCTV reports, database, logs, <br />electronic reports, etc. noting important features during the inspection. The <br />above documentation must be submitted to the City. The speed of travel during the <br />inspection shall not exceed at any time more than 30 feet per minute, except noted <br />otherwise. <br />C. The camera must be centered to provide accurate distance measurements and locations <br />of features in the sewer main. All observations shall be displayed and documented on <br />video and identified by audio on PACP log. All video must be continuously metered <br />from the manhole. <br />D. All lengths of installed sewer main and sewer laterals shall be documented by footage <br />or stationing in the video. Sewer laterals shall be videoed up to the property line. The <br />pipe shall be clean to ensure all defects and observations are logged and documented. <br />E. During inspection, the operating technician shall, in addition to his/her video (with <br />audio) record of conditions, log in writing the location of all laterals, defects, <br />misalignments, and other conditions and data pertinent to the physical condition and <br />operation of the sewer main and sewer laterals. <br />Cleaning of the sewer main and laterals shall include removal of debris or foreign objects <br />introduced during construction. Such debris shall be vacuumed from the system and shall <br />not be washed or otherwise deposited downstream. Cleaning apparatus shall be removed <br />prior to insertion of the video camera. Under no circumstances shall cleaning apparatus <br />be used in direct conjunction with video operations. <br />Under no circumstances will plugging and/or bypassing be permitted without prior <br />approval and presence of the Engineer. If plugging and/or bypassing are deemed <br />necessary, the Contractor shall be responsible for plugging manhole outlets and/or <br />providing a bypass line for the effluent during videotaping. The sewer mains will be "in <br />service" at the time of the video inspection. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.