My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />161 <br />The Contractor shall submit all material information for sewer lateral cleanout <br />connections and appurtenances prior to commencing work. The Engineer shall review <br />and upon approval notify the Contractor by a memorandum. Non-approved materials <br />shall not be used. <br />New submittals shall be required for material substitutions. The Engineer shall review <br />and upon approval notify the Contractor by a memorandum. <br />During construction, the Contractor shall make provisions for the collection of sewage <br />from cutoff laterals. All sewer laterals shall be reconnected to the main before the <br />termination of each working day. <br />The curb and gutter shall be protected in place. If the Contractor damages curb, gutter, it <br />shall be removed and replaced to match existing in accordance with City of Santa Ana <br />Standard Plan No. 1101. This work shall also include removal and replacement of PCC <br />sidewalk, driveway panels and landscaping to facilitate construction of sewer laterals. <br />PCC sidewalk and driveway approach panels shall be replaced to match existing in <br />accordance with the City of Santa Ana Standard Plan No. 1104 and 1112. Sidewalk <br />replacement shall be from score line to score line, unless the sidewalk panels exceed four <br />feet in length. At no time, shall a sidewalk panel floater be less than four feet from the <br />nearest score line. Landscaping shall be replaced in-kind. <br />6.17 CONNECT SEWER LATERALS <br />This work shall include reconnecting existing sewer lateral to the new sewer main. This <br />work shall include locating all existing laterals and pipe connection points, furnishing and <br />installing new pipe and connections to the new main in accordance with City of Santa <br />Ana Standard Plan Nos. 1204 and 1204A, replacement of street surface over trench as <br />shown on drawings. <br />At all locations where more than one (1) lateral serves a single parcel, Contractor shall <br />expose existing lateral connection to the existing sewer main and verify that the lateral is <br />active by CCTV inspection. In addition, the Contractor shall insert a push camera with <br />sounder/locator up the lateral from the main (insertion pit) to mark and locate the point of <br />connection at the property line. If CCTV investigation is inconclusive, lateral shall be <br />treated as active and shall be constructed per plan. If lateral is determined to be dead, <br />lateral shall be plugged and abandoned in place. <br />During construction, the Contractor shall make provisions for the collection of sewage <br />from cutoff laterals. All sewer laterals shall be reconnected to the main before the <br />termination of each working day. <br />6.18 CLOSED CIRCUIT TELEV ISION (CCTV) INSPECTION OF SEWER MAIN AND <br />LATERALS <br />Following installation of pipe, CCTV inspection shall be performed on all newly <br />constructed sewer mains and sewer laterals. This work shall also include cleaning of <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.