My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />164 <br />Contractor shall be responsible for all aspects of the mobilization, set up, operation, <br />management, monitoring, maintenance operation, pressure testing, spill containment, and <br />spill management including clean up. When bypass pumping flows, the Contractor shall <br />have at least one designated person on site 24 hours per day to operate, monitor and <br />maintain the bypass pumping system and implement the spill prevention and control <br />procedures. <br />For manhole bypassing, the Contractor shall install and operate a flow bypass system that <br />shall limit the flow to zero (0) flow within the channel by using a bypass flow through <br />tube for both rechanneling of the manhole base and when connecting to the existing <br />sewer manhole. <br />The Contractor shall develop a Spill Prevention, Control and Countermeasure Plan <br />(SPCCP) which shall include the following items: <br /> Identify all equipment, materials and labor necessary to prevent sewage spill in <br />the event there is a sewage leak during bypassing of sewers. <br /> A description of the Contractor’s plan to respond to a sewage spill should it occur. <br /> The plan shall include a step by step procedure on how the equipment, materials <br />and labor will be mobilized and implemented in the event of a spill. <br /> Describe handling of sewage flow during a bypass system failure. <br /> A plan identifying existing storm drains and materials used to block the openings <br />in the event of a spill. <br /> As a minimum, include the following emergency overflow response equipment: a <br />minimum of 10-feet of pipe of each size and type used on the bypass system <br />together with matching repair couplings; rubber matting to overlap storm drain <br />inlets by a minimum of 24-inches on all sides; for inlets in traffic, the grating <br />removed and wrapped with rubber sheeting and reinstalled; a minimum of one 48- <br />inch wide by 36 foot long roll of rubber matting and the equivalent of eight cubic <br />yards of sandbags in a pre-loaded truck ready for use in addition to the materials <br />required to cover storm drain inlets; and temporary sewer and storm drain plugs to <br />manage collection and disposal of any sewage overflows. <br />The Contractor shall prepare an Odor Control Plan identifying and locating any potential <br />construction activities that might produce odors. The plan shall describe the means of <br />mitigating the odors and identifying all materials, equipment and systems the Contractor <br />is planning to use. Potential nuisance odor areas shall include open manholes, and open <br />sewers where gases may be present or can be released. During bypass pumping, <br />manholes upstream of the pump shall also be considered as potential odor sources due to <br />the blocking off of the airflow in the headspace of sewer. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.