My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />166 <br />pump priming shall be connected to a portable activated carbon scrubber. All engines <br />shall be critically silenced for sound control and regardless of noise level, soundproofing <br />shield not less than eight feet high shall be provided around each engine to absorb noise. <br />100% standby pumping shall be provided. Standby pump shall be sized to match the <br />duty pump. Standby pumping equipment shall be at the site continuously during <br />bypassing to provide standby pumping capacity. <br />Above ground bypass piping shall be high density polyethylene (HDPE) pipe, steel or <br />aluminum pipe with grooved couplings. HDPE shall be butt welded and have a <br />minimum wall thickness of SDR 17. For protection against damage, the bypass piping <br />shall be protected in place by barrier or crash cushions when adjacent to traf fic. All <br />temporary connections to existing and new manholes shall be properly covered and <br />sealed to prevent nuisance odors from escaping into the atmosphere. When the bypass <br />piping discharges into a manhole, the discharge pipe shall extend into the manhole, <br />ending at the elevation of the center of the trunk sewer. All valves used on the bypass <br />system shall be open port gate, plug or ball valves. <br />Temporary plugs shall be appropriate for the application. Plugs shall be heavy-duty <br />inflatable type with a steel rod through plug centerline, a retaining plate and an eye-lift on <br />both ends. Plugs shall have a flexible sealing design to compensate for any irregular <br />interior surface of the pipe. <br />Flow-through plugs shall be appropriate for the application and provided with the <br />required configuration to perform the bypass. The flow-through plug shall consist of a <br />flow-through plug and a flexible hose. The flexible hose shall be rubber coated, heavy <br />duty, nylon hose with and enclosed steel helix coil. The flow-through plug shall attach to <br />the flexible hose using high torque, stainless steel pipe clamps. The flow-through plugs <br />shall be equipped with continuous pressure monitoring. <br />The Contractor shall take all necessary precautions, including constant monitoring of <br />bypass pumping to prevent sewage spills due to back-up and/or overflow resulting from <br />breakage or blockage of the bypass system. The Contractor shall provide experienced <br />personnel knowledgeable in the operation of the bypass equipment to monitor each <br />bypass when the bypass is installed and operating. At no time shall the bypass system be <br />left unattended during operation by the designated personnel. <br />The bypass system (all equipment) shall be fully tested prior to commencing bypass <br />operation, including back-up pumps. <br />6.22 SUBMITTALS <br />Sewer main pipe and appurtenance submittals shall include, but not limited to the <br />following manufacturer information: <br />1. SDR-26 PVC pipe, VCP pipe, and or other as approved by the Engineer <br />2. Fittings and Bends <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.