Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />176 <br />The minimum cover to top of pipe shall be 36" to finished surface except as noted on the <br />plans and with the approval of the Engineer. <br />The pipe and fittings shall be lowered into the trench. Do not throw the pipe or fittings <br />into the trench. <br />All buried ductile iron pipe and metallic fittings shall be encased in conformance with <br />ANSI/AWWA C105-A21.5 Standard and these Special Provisions. <br />All ductile iron pipe, fittings, valves, appurtenances, blowoffs, air valves, and service taps <br />buried underground shall be encased or wrapped with 10-mil linear low-density (LLD) <br />polyethylene film. Any existing or connecting pipe and appurtenances that are exposed as <br />a result of this pipe installation shall be cleaned and wrapped with polyethylene tubing <br />and or sheeting per ANSI/AWWA C105-A21.5. Method- B for ductile iron encasement <br />installation will not be allowed. <br />All nuts, bolts and washers shall be Type 316 stainless steel and shall have NON-OXIDE <br />GREASE or anti-seize compound applied to the threads prior to installation and <br />reapplied prior to wrapping. <br />Hydrostatic testing pressure and leakage tests shall be in accordance with the applicable <br />provisions of AWWA Standard C600-05. The line shall be tested at a pressure of 200 psi. <br />All new pipelines and appurtenances shall be chlorinated and disinfected in accordance <br />with AWWA Standard C651-99 and shall meet all health department standards. In <br />addition, all new pipelines and appurtenances shall be chlorinated and disinfected in <br />accordance with the City of Santa Ana Disinfection Guidelines included in these <br />Procedural Guide and Design Guidelines. <br />Connection to existing water main facilities shall be made only after the successful <br />completion of pressure test, disinfection and flushing procedures. <br />7.10 POLYVINYL CHLORIDE (PVC) WATER MAIN PIPE AND APPURTENANCES <br />Underground conduit construction shall conform to all applicable Subsections of Section <br />306 of the Standard Specifications, the American Water Works Association (AWWA) <br />Standards, the City of Santa Ana Standard Plans and these Special Provisions. <br />Installation shall be in conformance with AWWA Manual (M23) "PVC Pipe Design and <br />Installation" and the manufacturer's recommendations. Pipe sections shall not be <br />deflected at any joint, either vertically or horizontally, beyond the limits specified by the <br />manufacturer. <br />All distribution mains, 4-inches thru 12-inches in diameter shall be AWWA C-900 <br />P.V.C. pipe, DR-14. For transmission mains, 16-inches thru 20-inches in diameter, pipe <br />shall be AWWA C-905 P.V.C. pipe, DR-18. This work shall include constructing the <br />PVC pipe water mains, and appurtenances complete and in place, of the size and class, <br />and to the alignment and grade as indicated on the plans. <br />505 E Central Ave <br />#B11/6/2024