Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />191 <br />If relocation requires an increase in depth or horizontal realignment of the pipe, 45˚ <br />Bends shall be used to re-route the pipe. Thrust blocks shall be required in <br />accordance with City of Santa Ana Standard Plan Nos. 1403A, 1403B, 1403C, and <br />1412. All pipe trenches shall have 6" minimum of sand bedding beneath the pipe and <br />sand backfill over the pipe compacted to 90% relative compaction. <br />7.17 FIRE HYDRANT ASSEMBLY <br />This work shall consist of furnishing and installing wet barrel fire hydrants, break away <br />spool, check valve, spool extensions and bury assemblies in the locations indicated on the <br />plans. <br />Hydrant lateral pipe, gate valves and appurtenances are included as part of this <br />work. <br />Fire Hydrant assembly shall be installed in accordance with AWWA C502, City of Santa <br />Ana Standard Plan Nos. 1405 and these Special Provisions. Wet barrel fire hydrant shall <br />be Clow, Model 860. The break off check valve shall be Clow Model LBI 400A. Bury <br />shall be ductile iron body with mechanical joint per Clow. No break away bolts will be <br />allowed. <br />The Contractor shall install trace wire in accordance with and per Section 7.12, Trace <br />Wire, of these Special Provisions and City Standard Plan No. 1405. <br />All hydrant exposed metal exterior coatings shall be in conformance with City of Santa <br />Ana Standard Plan No. 1405, and these Special Provisions. <br />The fire hydrant must have factory applied coating when delivered to site (i.e. must come <br />white from factory). <br />Fire Hydrant Coating (exposed exterior above ground) <br /> Type- Gloss synthetic enamel white <br /> Prime Coat: Apply a one coat, 4-mil <br /> Finish Coat: Apply two coats of (OSHA White), 6-mil for each coat <br />Each coat shall be applied evenly and with the use of mechanical devices. Allow <br />sufficient time between successive coats. The use of rollers and brushes is not allowed. <br />All ductile or cast iron pipe, fittings, valves, and appurtenances buried underground shall <br />be encased or wrapped with 10-mil linear low-density (LLD) polyethylene film. Any <br />existing or connecting pipe and appurtenances that are exposed as a result of this pipe <br />installation shall also be wrapped with polyethylene sheeting. <br />Where necessary, Contractor shall saw-cut, remove and replace sidewalk to facilitate <br />hydrant installation. Sidewalk shall be replaced per City of Santa Ana Standard Plan No . <br />1104. Sidewalk replacement shall be from score line to score line, unless the sidewalk <br />505 E Central Ave <br />#B11/6/2024