Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />192 <br />panels exceed four feet in length. At no time, shall a sidewalk panel floater be less than <br />four feet from the nearest score line. <br />All removed/abandoned upper and lower fire hydrant dry barrels shall be transported by <br />the Contractor to the City Corporate Yard (120 S. Center Street, Santa Ana, CA 92703). <br />It is the Contractor’s responsibility to coordinate this task with the Engineer prior to <br />delivery of the hydrants. Proper care and protection of the salvaged fire hydrant and <br />related components is required (dumping or dropping of hydrants will not be allowed). If <br />damage to any salvaged fire hydrant is caused by Contractor negligence, a charge of <br />$1,000 per damaged hydrant will be applied. <br />7.18 HOT TAP CONNECTION <br />This section consists and describes materials, requirements and procedures for hot tap <br />(system under pressure) connections to existing distribution system. <br />All approved manufactures and materials shall comply with City Standard No. 1408, the <br />engineering plans and these Special Provisions. <br />Tapping sleeves shall be epoxy-coated fabricated steel with Type 316 stainless steel nuts <br />and bolts. The tapping sleeve shall be installed in accordance with manufacturer’s <br />instructions and to the satisfaction of the Water Resources Division. The pipe barrel shall <br />be thoroughly cleaned with a wire brush to provide a smooth, hard surface for the sleeve. <br />The sleeve shall be supported independently of the pipe during the hot tap operation and <br />shall be pressure tested prior to the hot tap in the presence of the City’s certified Public <br />Works inspector. Thrust blocks shall be provided at the tapping location per City of <br />Santa Ana Standard Plan No. 1412. <br />The tapping valve shall be a resilient wedge as described on the City of Santa Ana <br />Standard Plan No. 1408. <br />The hot tap into the existing pipe shall be made using the appropriate type of cutting <br />machine and shell cutting bit for material being tapped. <br />Tapping machine must be operated per manufacturer’s instructions. Proper care shall be <br />taken to prevent cutting material from entering the pipeline and the tapping coupon must <br />be extracted. <br />The interior of the tapping valve and connecting piping shall be sprayed with a sodium <br />hypochlorite solution prior to connection. <br />All nuts and bolts shall be Type 316 stainless steel and shall be coated with mastic such <br />as 3M EC244, or Koppers Bitumastic 505 applied to the threads prior to installation and <br />reapplied prior to wrapping. <br />All ductile or cast iron pipe, fittings, valves, and appurtenances buried underground shall <br />be encased or wrapped with 10-mil linear low-density (LLD) polyethylene film. Any <br />505 E Central Ave <br />#B11/6/2024