Laserfiche WebLink
CITY OF SANTA ANA <br />DEFINITION OF BID ITEMS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />5 of 6 <br />equipment, tools, and incidentals as required and no additional compensation will be allowed <br />therefore. <br />Bid Item No. 19 - Furnish & Install Traffic Loop Type D <br />Payment for this item shall be at the contract unit price bid per Each as listed in the Bid Proposal, <br />and shall include full compensation for doing all work, including sign panel, posts & footings, <br />and furnishing all materials, labor, equipment, tools, and incidentals as required and no <br />additional compensation will be allowed therefore. <br />Bid Item No. 20 - Furnish and Install Traffic Loop Type E <br />Payment for Furnish & Install Traffic Loop Type E shall be at the contract unit price bid per <br />Each as listed in the Bid Proposal, and shall include full compensation for doing all work, <br />including sign panel, posts & footings, and furnishing all materials, labor, equipment, tools, and <br />incidentals as required and no additional compensation will be allowed therefore. <br />Bid Item No. 21 - Crack Sealing <br />Payment for this item shall be at the contract Lump Sum listed in the Bid Proposal, and shall <br />include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, disposal of all removed materials and incidentals as required and no additional <br />compensation will be allowed therefore. <br />Bid Item No. 22 - Protection of Surface Utility Frames & Covers <br />Payment for this item shall be at the contract Lump Sum listed in the Bid Proposal, and shall <br />include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, disposal of all removed materials and incidentals as required and no additional <br />compensation will be allowed therefore. <br />Bid Item No. 23 - Signing & Striping <br />Payment for this item shall be at the contract Lump Sum listed in the Bid Proposal, and shall <br />include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, disposal of all removed materials and incidentals as required and no additional <br />compensation will be allowed therefore. <br />Bid Item No. 24 - As-Built Plans <br />The work under this item consists of maintaining a control set of plans at the job site in accordance <br />with the provisions of Section 3-7 “Contract Documents” of the Standard Specifications, plans, and <br />this contract document specifications. <br />Payment for this item shall be at the contract Lump Sum listed in the Bid Proposal and shall <br />include full compensation for submitting a complete final as-built plans at the end of the end of <br />the project and no additional compensation will be allowed therefore. <br />505 E Central Ave <br />#B11/6/2024