My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 23 00 - 1 Alternates <br />SECTION 01 23 00 <br />ALTERNATES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This section includes a description of alternate work. <br />B. Related Requirements: <br />1. Pricing Documents: Quotation of cost of each alternate. <br />2. Owner-Contractor Agreement: Alternates accepted by Owner for incorporation <br />into the Work. <br />3. Sections of Specifications identified in each Alternate. <br />1.2 PROCEDURES <br />A. Alternates will be exercised at Owner's option. <br />B. Coordinate Related Work: and modify surrounding work as required to complete <br />Work, including changes under each alternate, when acceptance is designated in <br />Owner-Contractor Agreement. <br />1.3 ALTERNATES <br />A. Alternates: To be determined. <br />B. Alternate No. 1: Delete Custom Colors. <br />1. Work Included in Alternate: Include deduct cost for each line item requiring <br />custom color where color is not indicated on Drawings or Finish Schedule. <br />2. Work Included in Contract Amount: Include custom color as directed by Architect <br />where color is not indicated on Drawings or Finish Schedule. <br />3. Sections: List each Technical Section in Project Manual that indicates custom <br />color where color is not indicated on Drawings or Finish Schedule. List to indicate <br />amount in dollars to be saved if Architect selects manufacturer’s standard color. <br />END OF SECTION <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.