My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 25 00 - 1 Substitution Procedures <br />SECTION 01 25 00 <br />SUBSTITUTION PROCEDURES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. General: Procedures are described for requesting substitution of unlisted materials in <br />lieu of materials named in Specifications or approved for use in addenda. <br />1. Provide products listed in Contract Documents, products by manufacturers listed <br />in Contract Documents, and products meeting specified requirements. <br />a. Contract Amount: Base on materials and products included in Contract <br />Documents. <br />b. Where materials and products are listed in Contract Documents, materials <br />and products by manufacturers not listed shall not be used without Owner’s <br />and Architect’s approval of Contractor's written request for substitution. <br />2. Purpose: After bidding, substitutions will only be considered where Owner will <br />receive benefit or because specified materials are no longer available due to no <br />fault of Contractor. <br />3. Purpose: Substitutions will only be considered where Owner will receive benefit or <br />because specified materials are no longer available due to conditions beyond <br />Contractor control. <br />a. Owner benefits either from a Contractor proposed reduction of the Contract <br />amount or from a reduction in Contract time based on acceptance of <br />proposed substitution. <br />b. List proposed cost or time reductions on request for substitution. <br />c. Requests not including a proposed cost or time reduction will not be <br />considered unless Contractor submits supporting information indicating <br />specified materials are not available. <br />B. Related Sections: <br />1. Section 01 60 00: Product requirements. <br />1.2 SUBSTITUTIONS <br />A. Within a period of 35 days after award of Contract, Owner and Architect will consider <br />formal requests for substitutions only from Contractor as specified in 1.1 Summary. <br />1. Owner and Architect will consider only one request for substitution for each <br />material; where requests are denied Contractor shall be required to provide <br />specified materials. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.