Laserfiche WebLink
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 25 00 - 1 Substitution Procedures <br />SECTION 01 25 00 <br />SUBSTITUTION PROCEDURES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. General: Procedures are described for requesting substitution of unlisted materials in <br />lieu of materials named in Specifications or approved for use in addenda. <br />1. Provide products listed in Contract Documents, products by manufacturers listed <br />in Contract Documents, and products meeting specified requirements. <br />a. Contract Amount: Base on materials and products included in Contract <br />Documents. <br />b. Where materials and products are listed in Contract Documents, materials <br />and products by manufacturers not listed shall not be used without Owner’s <br />and Architect’s approval of Contractor's written request for substitution. <br />2. Purpose: After bidding, substitutions will only be considered where Owner will <br />receive benefit or because specified materials are no longer available due to no <br />fault of Contractor. <br />3. Purpose: Substitutions will only be considered where Owner will receive benefit or <br />because specified materials are no longer available due to conditions beyond <br />Contractor control. <br />a. Owner benefits either from a Contractor proposed reduction of the Contract <br />amount or from a reduction in Contract time based on acceptance of <br />proposed substitution. <br />b. List proposed cost or time reductions on request for substitution. <br />c. Requests not including a proposed cost or time reduction will not be <br />considered unless Contractor submits supporting information indicating <br />specified materials are not available. <br />B. Related Sections: <br />1. Section 01 60 00: Product requirements. <br />1.2 SUBSTITUTIONS <br />A. Within a period of 35 days after award of Contract, Owner and Architect will consider <br />formal requests for substitutions only from Contractor as specified in 1.1 Summary. <br />1. Owner and Architect will consider only one request for substitution for each <br />material; where requests are denied Contractor shall be required to provide <br />specified materials. <br />505 E Central Ave <br />#B11/6/2024