Laserfiche WebLink
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 30 00 - 7 Administrative Requirements <br />B. Contractor acknowledges and accepts responsibility for specialty design as part of <br />means and methods of construction, as well as coordination of parties involved to <br />achieve architectural design intent indicated in Contract Documents. <br />1. Design-build work includes sizing, sequencing, and detailing for construction by <br />professional licensed or registered engineer or design professional with special <br />expertise applicable to portion of Work involved. <br />2. Design-build work shall be constructed in compliance with building codes and <br />regulations in effect and shall be fit and proper for intended use. <br />3. Design-build work shall include drawings, specifications, and calculations <br />prepared, stamped, and signed by qualified professional licensed or registered <br />engineer licensed in the Project location as appropriate to design-build work. <br />a. Plans, specifications, and calculations shall be acceptable to Owner, <br />Owner’s Representative, and applicable authorities. <br />C. Where required by Owner Contractor shall submit copies of current insurance policies <br />covering errors and omissions of persons designing design-build work with <br />deductibles and limits per occurrence as mutually agreed by Owner and Contractor. <br />1. Provide endorsement to insurance providing for 30-day notice to Owner prior to <br />cancellation or material reduction in coverage. <br />2. Insurance shall be maintained for not less than applicable statute of limitations <br />for claims of latent defects, if such insurance is not written on an occurrence <br />basis during time design-build work is designed and constructed. <br />D. Review proposed layouts with Design Team and with various trades prior to <br />commencing work related to design-build work. <br />1.11 DEFERRED APPROVAL REQUIREMENTS <br />A. Installation of deferred approval items shall not be started until detailed plans, <br />specifications, and engineering calculations have been accepted and signed by <br />Architect or Engineer of Record responsible for Project design. <br />B. Deferred Approval Items shall be signed by California registered architect or <br />professional engineer delegated responsibility covering specific work shown requiring <br />approval by Division of the State Architect. <br />1. Deferred approval items for this Project include but may not be limited to <br />following: <br />a. Translucent Walls and Roofs – Section 08 45 00. <br />b. Telescopic Bleachers – Section 12 66 01. <br />c. Grandstands – Section 13 34 16. <br />d. Hydraulic Elevators – Section 14 24 00. <br />505 E Central Ave <br />#B11/6/2024